1775 Grand Concourse
Bronx • Block 02822 • Lot 7501 • Zip: 10453
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Times Square 39 min 5 walking, 34 riding
- Grand Central 41 min 5 walking, 36 riding
- Penn Station 42 min 5 walking, 37 riding
- Union Square 45 min 5 walking, 40 riding
- Fulton Street 51 min 5 walking, 46 riding
- Downtown Brooklyn 56 min 5 walking, 51 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
2025
-
CLASS - 2
AT 6:00AM I OBSERVED 8-STORY MIX USE BUILDING WITH SIDEWALK SHED INSTALLED AT EXP#1 THAT WAS NOT ILLUMINATED AS STIPU...
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. SERVICE ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-987. UPON INSP...
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. SERVICE ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-987. UPON INSP...
2024
-
DOB violation Dec 23, 2024
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 1
FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE DOCUMEN...
-
DOB violation Feb 8, 2024
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9C UNSAFE REPORT FILED
-
Alteration Type II
PROPOSED LAYOUT TO RENOVATE SIMULATION LAB, INTERIOR RENOVATION AND CONSTRUCTION AS SHOWN ON PLANS AT 6TH FLOOR . NO ...
2022
2021
-
Alteration Type II
COMPREHENSIVE INTEGRATED PRIMARY CARE CENTER, 4TH FLOOR; INSTALLATION OF 149 NEW SPRINKLER HEADS. NO CHANGE IN USE, E...
-
Alteration Type II
INTERIOR RENOVATION FOR NEW PRIMARY CARE CLINIC IN EXISTING OPEN SPACE ON 4TH FLOOR, INCLUDING NEW EXAM ROOMS, GROUP ...
-
Alteration Type II
INSTALLATION NEW HVAC SYSTEM INCLUDES CONDENSER UNIT, AIR HANDLING UNIT , CONTROLS AND NEW PLUMBING INCLUDING FIXTURE...
2020
-
Alteration Type II
INTERIOR RENOVATION OF 7TH FLOOR OFFICE SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2019
-
DOB violation Sep 19, 2019
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Sep 19, 2019
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Sep 19, 2019
E-ELEVATOR ELEVATORREQUIRED
-
CLASS - 2
3301.7;FAILURE TO MAINTAIN DOCUMENTS ONSITE REWQUIRED BY CHAPTER 33.NOTED:AT TIME OF INSPECTION OBSERVED SUSPENDED MO...
2018
-
DOB violation Jan 26, 2018
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
2016
-
CLASS - 1
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS. ALT 2 JOB#220514511. AT TIME OF INS...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records