| Dec 1, 2023 | 39523809K | RESOLVE | CLASS - 1 | FIRE EXTINGUISHERS. AT TIME OF INSPECTION AT NEW 12 STORY BUILDING ACTIVE JOBSITE I OBSERVED FIRE EXTINGUISHERS WITH ... | $1,250 | $0 | Oct 28, 2025 |
| Dec 1, 2023 | 39523811J | RESOLVE | CLASS - 1 | MATERIAL STORAGE IN STREET. AT TIME OF INSPECTION I OBSERVED MATERIAL, MACHINE AND DEBRIS STORED IN STREET NOT PROPER... | $2,500 | $0 | Oct 28, 2025 |
| Dec 1, 2023 | 39523810H | RESOLVE | CLASS - 1 | T TIME OF INSPECTION I OBSERVED SUPPORTED PIPE SCAFFOLD ERECTED AND INADEQUATELY MAINTAIN WITH MATERIAL AND DEBRIS SC... | $2,500 | $0 | Oct 28, 2025 |
| Dec 1, 2023 | 39523812L | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN SAFETY MEASURES. AT TIME OF INSPECTION I OBSERVED ACTIVE CONSTRUCTION WORK IN PROGRESS. I OBSERVE... | $2,500 | $0 | Oct 28, 2025 |
| Dec 1, 2023 | 39523807R | RESOLVE | CLASS - 1 | IN RESPONSE TO INCIDENT WHERE WORKER GOT INJURED WHEN HE FELL OFF SCAFFOLD HURTING HIS LEFT LEG UPON REQUEST TO SEE H... | $0 | $0 | Oct 28, 2025 |
| Dec 1, 2023 | 39523806P | RESOLVE | CLASS - 1 | IN RESPONSE TO INCIDENT WHERE WORKER FELL OFF SUPPORTED PIPE SCAFFOLD HURTING HIS LEFT LEG WHILE DOING FACADE WORK ON... | $10,000 | $0 | Oct 28, 2025 |
| Dec 1, 2023 | 39523808Z | RESOLVE | CLASS - 1 | IN RESPONSE TO INCIDENT WHERE WORKER GOT INJURED UPON REQUEST TO SEE PRE-SHIFT SAFETY MEETING LOG THE ONE PROVIDED DI... | $5,000 | $0 | Oct 28, 2025 |
| Aug 17, 2023 | 39520707X | RESOLVE | CLASS - 2 | AT THE TIME OF MY INSPECTION I OBSERVED A METAL STORAGE LOCKER BEING USED AS AN OFFICE BY THE SITE SAFETY COORDINATOR... | $0 | $0 | Nov 3, 2023 |
| Aug 17, 2023 | 39520704K | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION OF A NEW 12 STORY BUILDING I OBSERVED TOE BOARDS, END GATES AND SAFETY SCAFFOLDING PINS ... | $2,530 | $0 | Nov 1, 2024 |
| Jun 1, 2023 | 35674180P | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.AS NOTED:AT TIME OF INSPECTION AT AN ACTIVE JOBSIT... | $1,250 | $0 | Jun 9, 2025 |
| Apr 17, 2023 | 39515569K | RESOLVE | CLASS - 2 | 12 STORY NB ACTIVE SITE. OBSERVED CONCRETE OPERATIONS IN PROGRESS AT EXP#1 STREET LEVEL. UNFILTERED CONCRETE WASHOUT ... | $2,500 | $0 | Jan 10, 2025 |
| Apr 17, 2023 | 39515570H | RESOLVE | CLASS - 2 | A 12 STORY NB ACTIVE SITE. I OBSERVED CONSTRUCTION DEBRIS ACCUMULATED THROUGH OUT SITE BRICKS/WOOD CARDBOARD PILES ET... | $625 | $0 | Jan 10, 2025 |
| Apr 17, 2023 | 39515572L | RESOLVE | CLASS - 1 | 12 STORY NB ACTIVE SITE.OBSERVED HOLES ON CONCRETE SLAB APPROX 2'X2'FT OPENINGS ON ALL FLOORS.NOT ADEQUATELY PROTECTE... | $2,500 | $0 | Oct 11, 2024 |
| Apr 17, 2023 | 39515571J | RESOLVE | CLASS - 2 | 12 STORY NB ACTIVE SITE.OBSERVED SIDEWALK SHED EXP#1 WITH PIPE SCAFFOLDING ON TOP AT ALL EXPOSURES.SCAFFOLD AT EXP#1 ... | $625 | $0 | Jan 10, 2025 |
| Mar 15, 2023 | 39514173J | RESOLVE | CLASS - 1 | FAILURE TO PROVIDE ADEQUATE STORAGE ZONE AS PER CODE SPECIFICATIONS. AT TIME OF INSPECTION OBSERVED STORAGE ZONE YODO... | $625 | $0 | Apr 18, 2024 |
| Jan 11, 2023 | 39511558R | RESOLVE | CLASS - 1 | NOTE: AT THE TIME OF INSPECTION 12 STY BLDG. UNDER CONSTRUCTION AT 11TH FLOOR LEVEL, ACTIVE JOB SITE. ALSO OBSERVED I... | $0 | $0 | Apr 18, 2024 |
| Jan 11, 2023 | 39511573P | RESOLVE | CLASS - 1 | NOTE: AT THE TIME OF INSPECTION OBSERVED CONCRETE PLANK INSTALLATION OPERATION IN PROGRESS AT 11TH FLOOR LEVEL. ALSO ... | $0 | $0 | Apr 18, 2024 |
| Jan 11, 2023 | 39511563L | RESOLVE | CLASS - 1 | NOTE: AT THE TIME OF INSPECTION 12 STY BLDG. UNDER CONSTRUCTION AT 11TH FLOOR LEVEL, ACTIVE JOB SITE. ALSO OBSERVED U... | $0 | $0 | Apr 18, 2024 |
| Oct 19, 2022 | 39507845H | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION OF A 12 STORY BUILDING AT 8TH FLOOR LEVEL APPROXIMATELY 75 FEET IN HEIGHT CONSTRUCTION W... | $2,530 | $0 | May 8, 2023 |
| Oct 18, 2022 | 39507832Z | RESOLVE | CLASS - 1 | AT TIME OF MY INSPECTION OF A NEW BUILDING PROPOSED 12 STORY AT THE 8TH FLOOR . I NOTICED NO HOIST IN READINESS AS PE... | $2,530 | $0 | May 8, 2023 |
| Oct 18, 2022 | 39507833K | RESOLVE | CLASS - 1 | AT TIME OF MY INSPECTION OF A PROPOSED 12 STORY BUILDING AT 8TH FLOOR,75 FT IN HEIGHT I NOTICED NO STANDPIPE IN READI... | $2,530 | $0 | May 8, 2023 |
| Oct 12, 2022 | 35664451Z | RESOLVE | CLASS - 1 | BC 3309.14 PROTECTION OF WINDOWS.AS NOTED:AT TIME OF INSPECTION AT AN ACTIVE JOBSITE FOR A PROPOSED 12 STORY BUILDING... | $625 | $0 | Jan 6, 2023 |
| Jul 13, 2022 | 39503460Z | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OF A PROPOSED 12 STORY NB ACTIVE JOBSITE. I OBSERVED CONSTRUCTION FENCE IN PLACE AT EXP#1,3,4. ... | $0 | $0 | Sep 2, 2022 |
| Jul 13, 2022 | 39503448X | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OF A PROPOSED 12 STORY NB ACTIVE SITE. I OBSERVED WORKERS INSTALLING REBAR AT EXP#1. WITHIN 5 F... | $2,500 | $0 | Jun 8, 2023 |
| Jul 13, 2022 | 39503451R | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OF A PROPOSED 12 STORY NB ACTIVE SITE I OBSERVED REBAR IN PLACE APPROX. 12 FT HIGH WITH NO PROT... | $500 | $0 | Jun 8, 2023 |
| Jul 13, 2022 | 39503470M | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OF A PROPOSED 12 STORY ACTIVE SITE I OBSERVED A SIDEWALK SHED IN PLACE AT EXP#1,4. UPON FUTHER ... | $0 | $0 | Sep 2, 2022 |
| Jan 13, 2022 | 35633293K | RESOLVE | CLASS - 2 | FAILURE TO POST OR PROPERLY POST PERMIT FOR WORK AT PREMISES(CONSTRUCTION FENCE PERMIT)AT THE TIME OF MY INSPECTION O... | $0 | $0 | Apr 15, 2022 |
| Oct 15, 2021 | 35632714P | RESOLVE | CLASS - 2 | EXPIRED PERMIT FOR CONSTRUCTION FENCE AT TIME OF INSPECTION ON A ACTIVE PERMIT SITE OF EARTHWORK OBSERVED JOBSITE FEN... | $625 | $0 | Feb 4, 2022 |
| Oct 15, 2021 | 35632715R | RESOLVE | CLASS - 2 | JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PER CODE AT TIME OF INSPECTION ON A ACTIVE PERMIT SITE OF EARHWORK FOR 8 ... | $500 | $0 | Feb 4, 2022 |
| Jun 7, 2021 | 35553383Y | RESOLVE | CLASS - 1 | SEC. 3307.2.1;3307.2.6 FAILURE COMPLY DOT REQUIREMENTS. PEDESTRIAN PATHWAY. NOTE: OBSERVED EXP#1 TEMPORARY PATHWAY FO... | $312 | $0 | Jun 17, 2022 |
| Dec 2, 2020 | 37020545Z | RESOLVE | CLASS - 2 | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #39012570N ISSUED ON 11/08/2019,AND TO FIL... | $0 | $0 | Jun 3, 2022 |
| Apr 24, 2020 | 35490099L | RESOLVE | CLASS - 2 | FAILURE TO MAINTAIN VIEWING PANELS PURSUANT TO SUB-SECTION.AT TIME TIME OF INSPECTION,THE CONSTRUCTION FENCE AT EXPOS... | $0 | $0 | Jun 19, 2020 |
| Apr 24, 2020 | 35490425H | RESOLVE | CLASS - 2 | FAILURE TO COMPLY WITH D.D.T REGULATIONS(PUBLIC PATHWAY).AT TIME OF INSPECTION A TIMBER STREET BARRIER SYSTEM WAS INS... | $0 | $0 | Jun 19, 2020 |
| Apr 24, 2020 | 35490426J | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT.AT TIME OF INSPECTION IT WAS OBSERVED THAT MULTIPLE... | $625 | $0 | Mar 26, 2021 |
| Apr 24, 2020 | 35490098J | RESOLVE | CLASS - 2 | JOBSITE FENCE UOT MAINTAINED PURSUANT TO SUB-SECTION.AT TIME OF INSPECTION THE FENCE AT EXPOSURE#1 WAS FILLED WITH UN... | $0 | $0 | Jun 19, 2020 |
| Apr 24, 2020 | 35490427L | RESOLVE | CLASS - 2 | FAILURE TO POST PERMIT FOR WORK AT FENCE PROJECT INFORMATION PANEL.AT TIME OF INSPECTION,A FENCE PROJECT INFORMATION ... | $0 | $0 | Mar 26, 2021 |
| Nov 8, 2019 | 39012570N | RESOLVE | CLASS - 2 | EXCAVATION WORK (AND ALSO CONSTRUCTION FENCE) ONTO DEPARTMENT OF TRANSPORTATION STAIR/STREET PROPERTY AT EAST SIDE OF... | $1,250 | $0 | Jan 3, 2020 |
| Jul 24, 2019 | 35423062H | RESOLVE | CLASS - 2 | 3301.9.1.2:INFORMATION PANEL AT TIME OF INSPECTION OF A PROPOSED 8 STY NB @ GRADE LEVEL I OBSERVED JOBSITE FENCE IN P... | $0 | $0 | Sep 20, 2019 |
| Jul 24, 2019 | 35423061X | RESOLVE | CLASS - 2 | VIEW PANELS AT TIME OF INSPECTION OF A PORPOSED 8 STY NB # GRADE LEVEL I OBSERVED JOBSITE CONSTRUCTION HEMCE IN PLACE... | $0 | $0 | Sep 20, 2019 |
| May 1, 2018 | 35273440P | RESOLVE | CLASS - 2 | JOB SITE PLYWOOD CONSTRUCTION FENCE NOT PURSUANT TO SUBSECTION. AS NOTED, AT TIME OF INSPECTION, CLOSED, GRADED SITE ... | $0 | $0 | Jun 15, 2018 |
| Feb 8, 2013 | 35003956X | ACTIVE | CLASS - 2 | FAILURE TO MAINTAIN CHAIN LINK FENCE. 1-AT EAST SIDE NEAR STEPS - HORIZONTAL HEAD BAR DISLODGED FROM POST (VERTICAL P... | $2,500 | $0 | Mar 29, 2013 |
| Feb 8, 2013 | 35003957H | ACTIVE | CLASS - 2 | SEC. 28-105.1 WORK W/O A PERMIT - EXPIRED PERMIT #200812264-01-EQ FENCE EXPRESS 12/4/07. REMEDY: RENEW PERMIT. | $4,000 | $0 | Mar 29, 2013 |
| Jun 9, 2006 | 34524895Z | RESOLVE | Hazardous | JOB SITE FENCE DEFECTIVE. CONSTRUCTION FENCE ERECTED UNDER PERMIT #200812255 ISSUED 09/10/06 EXPIRES 12-31-06 CONSTRU... | $500 | $0 | May 7, 2007 |
| Jun 8, 2006 | 34524893P | RESOLVE | Hazardous | DEFECTIVE JOB SITE FENCE. JOB SITE FENCE ERECTED UNDER PERMIT #200812255. SOLID WOOD FENCE HAS TOTALLY COLLAPSED ONTO... | $500 | $0 | May 4, 2007 |
| May 24, 2006 | 34523173M | RESOLVE | Hazardous | JOBSITE FENCE DEFECTIVE.NOTE:AT THE FRONT OF THIS EXCAVATED SITE, THE JOBSITE FENCE HAS COLLAPSED, THE FENCE ON THE E... | $500 | $0 | May 4, 2007 |
| May 24, 2006 | 34523174Y | RESOLVE | Hazardous | FAILURE TO PROVIDE 8' HIGH FENCE WHERE REQUIRED DURING EXCAVATION OPERATION.LOT HAS BEEN PARTIALLY EXCAVATED WITH ONL... | $1,250 | $0 | May 4, 2007 |
| May 24, 2006 | 34526625H | RESOLVE | Hazardous | FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION.NOTE:NO SHEETING,SHORING OR BRACING HAS BEEN PROVIDED TO THE SID... | $1,000 | $0 | May 4, 2007 |
| May 8, 2006 | 34524527P | RESOLVE | Hazardous | FAILURE TO PROVIDE 8' HIGH FENCE WHERE REQUIRED DURING EXCAVATION OPERATIONS APPROX 32 LINEAR FEET OF WOODEN CONSTRUC... | $480 | $0 | May 4, 2007 |
| Mar 6, 2006 | 34513659N | RESOLVE | Hazardous | FAILURE TO MAINTAIN-HAZARDOUS. CONSTRUCTION FENCE HAS COLLAPSED INTO THE SITE. REMEDY: MAINTAIN FENCE. | $800 | $0 | May 4, 2007 |
| Feb 22, 2006 | 34513536N | RESOLVE | Hazardous | FAILURE TO PROVIDE 8'FOOT HIGH FENCE WHERE REQUIRED DURING EXCAVATION OPERATIONS. AS PER PRIOR VIOLATION #13106C5FG01... | $1,250 | $0 | May 7, 2007 |