Job filings
1730 Andrews Avenue South, Bronx • Block 02878 • Lot 0178
9 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Dec 22, 2020 | 240296452 | Alteration Type II | PLAN EXAM - APPROVED | NEW STEEL WINDOW LINTEL INSTALATION AT ALL FRONT COURTYARD 6TH FLOOR WINDOWS. NO CHNAGE IN USE, EGRESS OR OCCUPANCY. | $15,000 | ESPERANZA VILLAGE ASSOCIATES |
| Jun 1, 2016 | 240106666 | Alteration Type III | SIGNED OFF | INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33... | $0 | PRC ANDREWS AVEENUE LLC |
| Apr 20, 2016 | 220450982 | Alteration Type II | SIGNED OFF | MODERATE REHAB WITHIN INTERIOR OF THE BUILDING & EXTERIOR MASONRY REPAIR. REPLACE PLUMBING FIXTURES WITHIN EXISTI... | $2,400,000 | ESPERANZA VILLAGE ASSOCIATES |
| Apr 12, 2016 | 220458305 | Alteration Type II | SIGNED OFF | INSTALLATION OF AN AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. THERE ... | $18,000 | PRC ANDREWS AVE LLC&ANDREWS/KELL |
| May 7, 2013 | 220100138 | Alteration Type II | SIGNED OFF | — | $199,100 | ESPERANZA VILLAGE ASSOC LP |
| Oct 23, 2012 | 220090087 | Alteration Type II | SIGNED OFF | REPLACE (2) BOILERS AND (2) GAS/OIL BURNERS (NYC BOILER NO. MD904-01) WITH ONE BOILER AND ONE GAS/OIL BURNER. | $3,000 | ESPERANZA VILLAGE ASSOC, LP |
| Jul 19, 2012 | 210012421 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF 109 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY... | $0 | ESPERANZO VILLAGE ASSO . , |
| Mar 21, 2012 | 220162311 | Alteration Type III | SIGNED OFF | INSTALLATION OF 109 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 ... | $0 | INTERSYSTEMS CORP. |
| Nov 19, 2004 | 200919621 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | Install 135 LF sidewalk shed for exterior work. HEAVY DUTY SHED = 300 PSF LIVE LOAD.No storage on shed. No change in ... | $0 | colgate scaffolding |