Maintenance code violations
1625-1631 Fulton Avenue, Bronx • Block 02929 • Lot 0082
219 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Jul 20, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 1P | Aug 24, 2022 |
| Jul 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4R | Aug 24, 2022 |
| Jul 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4P | Aug 24, 2022 |
| Jul 20, 2022 | B | NOV SENT OUT | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE CEILING IN THE BATHROOM LO... | 1P | Aug 24, 2022 |
| Jul 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | LL | Aug 24, 2022 |
| Jul 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5I | Aug 24, 2022 |
| Jul 20, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5F | Aug 24, 2022 |
| Jul 20, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3J | Aug 24, 2022 |
| Jun 10, 2022 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | CC | Sep 13, 2022 |
| Jun 10, 2022 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 2L | Sep 13, 2022 |
| Jun 8, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 3L | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2L | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3G | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3E | Jul 13, 2022 |
| Jun 8, 2022 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2E | Jul 13, 2022 |
| Jun 8, 2022 | B | DEFECT LETTER ISSUED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | GG | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5D | Jul 13, 2022 |
| Jun 8, 2022 | B | NOV CERTIFIED LATE | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5C | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5A | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3D | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3C | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3B | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2C | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2B | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 1B | Jul 13, 2022 |
| Jun 8, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 1A | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | CC | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | BB | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | AA | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5M | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5J | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3M | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 1K | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 1J | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | KK | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | II | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5H | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5G | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 4I | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 4G | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 4F | Jul 13, 2022 |
| Jun 8, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3I | Jul 13, 2022 |
| May 13, 2022 | C | NOV SENT OUT | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | 2M | May 17, 2022 |
| May 13, 2022 | C | NOV SENT OUT | § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO B... | 2M | May 17, 2022 |
| May 2, 2022 | C | VIOLATION DISMISSED | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM BOILER ROOM LOCKED AT BOILER ROOM | — | May 8, 2022 |
| May 2, 2022 | C | VIOLATION CLOSED | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, ... | 5F | Apr 30, 2022 |
| Feb 17, 2022 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | May 23, 2022 |
| Apr 2, 2021 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Jul 6, 2021 |
| Jun 18, 2020 | B | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 5 SQ FT CEILING IN THE BA... | 3J | Jul 23, 2020 |
| Mar 17, 2020 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4J, 5th ... | 4J | Apr 7, 2020 |