DOB violations
1779 Fulton Avenue, Bronx • Block 02930 • Lot 0060
7 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Aug 8, 2025 | RW20310BH | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | FAILURE TO MAINTAIN RETAINING WALL IN A SAFE CONDITION.NOTED AT THE TI ME OF INSPECTION,WE NOTED THAT THE RETAINING W... | — |
| Aug 5, 2025 | 25-01878 | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | REQUESTING ENGINEER REPORT DUE TO RUBBLE STONE RETAINING WALL IN STATE OF DISREPAIR LOCATED AT EXPOSURE 3, OBSERVED C... | — |
| Mar 5, 2024 | 24-00596 | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | FAILURE TO MAINTAIN. EXPOSURE#3, RETAINING WALLS WITH CRACKS AND MISSING MORTAR | — |
| Jan 31, 2005 | 08474 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Oct 24, 2005 |
| Sep 16, 1997 | 201720 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Mar 10, 1998 |
| Feb 10, 1997 | 13410 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Nov 8, 2018 |
| May 17, 1993 | 05087 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Sep 15, 1993 |