ECB violations
744 East 175 Street, Bronx • Block 02948 • Lot 0036
36 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Feb 21, 2025 | 39537205R | RESOLVE | CLASS - 2 | OBSERVED INACTIVE 6 STORY ALT WHERE NO CERTIFICATE OF CORRECTIONS WAS FILED FOR CLASS 1 VIOLATION #: 39529811R ISSUED... | $5,000 | $5,000 | Mar 30, 2026 |
| Dec 27, 2024 | 39535425J | RESOLVE | CLASS - 2 | RESPONDENT FAILED TO CORRECT VIOLATING CONDITION AND FILE FOR A CERTIFICATE OF CORRECTION PURSUANT TO AC 28-204.4 FOR... | $1,250 | $1,250 | Apr 18, 2025 |
| Oct 24, 2024 | 39533780P | RESOLVE | CLASS - 2 | FAILURE TO CORRECT VIOLATING CONDITION AND FILE FOR A CERTIFICATE OF CORRECTION PURSUANT TO AC 28-204.4 FOR VIOL NO 3... | $1,250 | $1,250 | Mar 20, 2026 |
| Aug 14, 2024 | 39531392Y | RESOLVE | CLASS - 2 | RESPONDENT FAILED TO CORRECT VIOLATING CONDITION AND FILE A CERTIFICATE OF CORRECTION PURSUANT TO AC 28-204.4 FOR VIO... | $1,250 | $1,250 | Apr 4, 2025 |
| Aug 5, 2024 | 39531124H | ACTIVE | CLASS - 1 | AT TIME OF INSPECTION AT ACTIVE ALT JOBSITE I OBSERVED ACTIVE CONSTRUCTION WORK IN PROGRESS UPON REQUEST TO SEE COMPE... | $25,000 | $25,000 | Mar 20, 2026 |
| Aug 5, 2024 | 39531122Y | RESOLVE | CLASS - 2 | BC 3314.4 SUPPORTED SCAFFOLD ( BASE PLATES ) AT TIME OF INSPECTION I OBSERVED SUPPORTED SCAFFOLD BEING USED AT ROOF L... | $2,500 | $2,500 | Mar 20, 2026 |
| Aug 5, 2024 | 39531121M | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION I OBSERVED ACTIVE CONSTRUCTION WORK IN PROGRESS WITH BUILDING TOPPED OFF UPON REVIEW IN DOB NOW... | $0 | $0 | Mar 20, 2026 |
| Aug 5, 2024 | 39531123X | RESOLVE | CLASS - 1 | BC 3303.2.4 SANITARY FACILITIES: AT TIME OF INSPECTION I OBSERVED ACTIVE CONSTRUCTION WORK AT ALT JOBSITE WITH 5 MALE... | $0 | $0 | Mar 20, 2026 |
| Aug 5, 2024 | 39531120K | RESOLVE | CLASS - 2 | BC 3301.2 HOLES IN FLOORS : AT TIME OF INSPECTION AT ACTIVE JOBSITE I OBSERVED THROUGHOUT JOBSITE AT DIFFERENT LOCATI... | $2,500 | $2,500 | Mar 20, 2026 |
| Jun 19, 2024 | 39529811R | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION AT ACTIVE ALT JOBSITE I OBSERVED THE SUPER FAILED TO PERFORM HIS DUTIES FOR THE FOLLOWING REASO... | $5,000 | $5,000 | Sep 12, 2025 |
| Jun 19, 2024 | 39529799N | ACTIVE | CLASS - 1 | BC 3303.2.3.1 TEMP LIGHTING: AT TIME OF INSPECTION I OBSERVED NO LIGHTING PROVIDED ANYWHERE ON JOBSITE CREATING A HAZ... | $5,000 | $5,000 | Mar 20, 2026 |
| Jun 19, 2024 | 39529800L | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION AT ACTIVE ALT JOBSITE UPON REQUEST TOO SEE ALL LOGS AND PERMITS ONLY PRE-SHIFT AND SUPER'S LOG ... | $1,250 | $1,250 | Mar 20, 2026 |
| Jun 19, 2024 | 39529822M | ACTIVE | CLASS - 1 | BC 3301.13.5 ALTERNATE CONSTRUCTION SUPERINTENDENT: AT TIME OF INSPECTION AT ACTIVE ALT JOBSITE UPON REQUEST TO SEE S... | $5,000 | $5,000 | Mar 20, 2026 |
| Jun 19, 2024 | 39529801N | ACTIVE | CLASS - 1 | AT TIME OF INSPECTION AT ACTIVE ALT JOBSITE I OBSERVED MISSING GUARDRAILS AROUND WINDOW OPENINGS CREATING A HAZARD FO... | $5,000 | $5,000 | Mar 20, 2026 |
| Jun 19, 2024 | 39529802P | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION UPON REQUEST TO SEE SUPER LOG SHOWS HE HAS NOT SIGNED DAILY SUPER'S LOG SINCE MAY1 2024 AND NO ... | $0 | $0 | Aug 30, 2024 |
| Jun 19, 2024 | 39529798L | ACTIVE | CLASS - 1 | AT TIME OF INSPECTION AT ACTIVE 6 STORY JOBSITE I OBSERVED MISSING HANDRAILS AT STAIRS ALL STORIES CREATING A HAZARD ... | $2,500 | $2,500 | Mar 20, 2026 |
| Mar 24, 2023 | 39514641L | RESOLVE | CLASS - 2 | A 6 STORY ALT1 CLOSED SITE. I OBSERVED NO/MISSING SIDEWALK SHED PARAPET SIGNAGE ON SHED. SIGNAGE IS REQUIRED FOR INFO... | $3,125 | $3,125 | Jun 30, 2023 |
| Mar 24, 2023 | 39514642N | RESOLVE | CLASS - 2 | 6 STORY ALTERATION CLOSED JOBSITE. I OBSERVED 2 DUMPSTERS IN PLACE AT EXP#1 OVERFLOWED WITH COMBUSTIBLE MATERIAL DEBR... | $3,125 | $3,125 | Jun 30, 2023 |
| Dec 23, 2022 | 39510789J | RESOLVE | CLASS - 2 | A PROPOSED 4 STORY ALT1 OF EXISTING 2 STORY BUILDING ACTIVE SITE AT DEMOLITION PHASE.OBSERVED BUILDING PARTIALLY DEMO... | $0 | $0 | Mar 3, 2023 |
| Dec 23, 2022 | 39510790R | RESOLVE | CLASS - 2 | PROPOSED 4 STORY ALT1 OF EXISTING 2 STORY ACTIVE SITE.I OBSERVED 2 MATERIAL STORAGE CONTAINERS ADJACENT OR IN FRONT O... | $1,250 | $1,250 | Mar 31, 2023 |
| Dec 23, 2022 | 39510788H | RESOLVE | CLASS - 2 | A PROPOSED 4 STORY ALT1 OF EXISTING 2 STORY BUILDING ACTIVE SITE AT DEMOLITION PHASE. I OBSERVED BUILDING PARTIALLY D... | $0 | $0 | Mar 3, 2023 |
| Dec 23, 2022 | 39510786Y | RESOLVE | CLASS - 2 | A PROPOSED 4 STORY ALTERATION OF EXISTING 2 STORY BUILDING ACTIVE SITE. I OBSERVED FENCE NOT MAINTAINED IN PLACE AT E... | $1,000 | $1,000 | Mar 31, 2023 |
| Dec 23, 2022 | 39510785M | RESOLVE | CLASS - 2 | A PROPOSED 4 STORY ALTERATION OF EXISTING 2 STORY BUILDING ACTIVE SITE. I OBSERVED WORKERS ONSITE. UPON REQUEST TO CO... | $0 | $0 | Mar 31, 2023 |
| Dec 23, 2022 | 39510787X | RESOLVE | CLASS - 1 | A PROPOSED 4 STORY ALT1 OF EXISTING 2 STORY ACTIVE JOBSITE AT DEMOLITION PHASE. I OBSERVED WORKERS ONSITE AT 1ST FLOO... | $2,500 | $2,500 | Mar 31, 2023 |
| Dec 23, 2022 | 39510783Z | RESOLVE | CLASS - 2 | A 4 STORY ALT1 ACTIVE SITE AT DEMO PHASE ACTIVE SITE. I OBSERVED EXISTING 2 STORY PARTIALLY DEMOLISHED MATERIALS FROM... | $625 | $625 | Mar 31, 2023 |
| Dec 23, 2022 | 39510782R | RESOLVE | CLASS - 2 | A 4 STORY ALT1. I OBSERVED WORKERS EXPOSED TO MULTIPLE HAZARDOUS/UNSAFE VIOLATING CONDITIONS ON ACTIVE JOBSITE. 1/MIS... | $2,500 | $3,186 | Mar 31, 2023 |
| Mar 16, 2022 | 35647925R | RESOLVE | CLASS - 1 | FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED-NO SIDEWALK SHED IN PLACE AT EXP.#1.NOTED:AT TIME OF INSPECTION OF A ... | $10,000 | $0 | Oct 14, 2022 |
| Mar 16, 2022 | 35643099X | RESOLVE | CLASS - 2 | BC3309.14 FAILURE TO PROTECT ADJOINING PROPERTY WINDOWS AT EXP.#2-NO WINDOW PROTECTION.NOTED:AT TIME OF INSPECTION OF... | $1,250 | $0 | Oct 14, 2022 |
| Mar 16, 2022 | 35643098Y | RESOLVE | CLASS - 2 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS-NO OVERHEAD PROTECTION IN PLACE AT EX... | $5,000 | $0 | Oct 14, 2022 |
| Dec 10, 2021 | 35553557P | RESOLVE | CLASS - 1 | FAILURE TO COMPLU-UBRACED MASONRY WALLS WERE OBSERVED AT THE 2ND FLOORA STRUCTURAL STABILITY REPORT PREPARED BY BUILD... | $6,250 | $6,250 | Aug 5, 2022 |
| Nov 22, 2021 | 35633437K | RESOLVE | CLASS - 1 | SEC. BC3309.1 FAILURE TO PROTECT ADJOINING STRUCTURES(GENERAL). NOTED:AT TIME OF MY INSPECTION OF AN ALTERATION TYPE-... | $2,500 | $0 | Oct 14, 2022 |
| Nov 22, 2021 | 35633436Z | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33. NOTED: AT TIME OF MY INSPECTION OF AN ALTERA... | $1,250 | $0 | Oct 14, 2022 |
| Nov 22, 2021 | 35633435R | RESOLVE | CLASS - 1 | SEC. BC 3301.6 NO DESIGN DRAWINGS(SHORING). NOTED: AT TIME OF MY INSPECTION OF AN ALTERATION TYPE-1,6 STY BLDG AT THE... | $2,500 | $0 | Oct 14, 2022 |
| Nov 22, 2021 | 35633439Y | RESOLVE | CLASS - 2 | SEC. BC3309.14 PROTECTION OF WINDOWS. NOTED: AT TIME OF MY INSPECTION OF AN ALTERATION TYPE-1,6 STY BLDG AT THE DEMOL... | $1,250 | $0 | Oct 14, 2022 |
| Nov 22, 2021 | 35633438M | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. NOTED: AT TIME OF MY INSPECTION OF AN ALTERATION ... | $625 | $0 | Oct 14, 2022 |
| Apr 5, 2007 | 34562099P | ACTIVE | Hazardous | OCCUPANCY CONTRARY TO THAT ALLOWED BY HPD & OR BLDG DEPT RECORDS.BASEMENT CONVERTED FROM ORDINARY USE INTO A CLASS A ... | $2,500 | $0 | Jul 20, 2007 |