ECB violations
1822 Crotona Avenue, Bronx • Block 02949 • Lot 0002
15 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jul 28, 2026 | 39557132N | ACTIVE | CLASS - 2 | 3 STORY BUILDING UNDER DEMOLITION CLOSED SITE OBSERVED JOBSITE FENCE X01193997 NOT PROPERLY MAINTAINED PER CODE EXP#1... | $1,000 | $1,000 | Oct 2, 2026 |
| Apr 29, 2026 | 39553604Y | RESOLVE | CLASS - 2 | FULL DEMOLITION OF A DETACHED 3 STORY BUILDING ACTIVE SITE. UPON REVIEW OF SITE SAFETY PLANS PROVIDED/SHOWS TREE PROT... | $0 | $0 | Jul 17, 2026 |
| Apr 29, 2026 | 39553605X | ACTIVE | CLASS - 2 | FULL DEMOLITION OF A DETACHED 3 STORY BUILDING ACTIVE SITE. OBSERVED NYC DEP FIRE HYDRANT IN USE FOR CONSTRUCTION ACT... | $1,250 | $1,250 | Jul 17, 2026 |
| Apr 29, 2026 | 39553606H | ACTIVE | CLASS - 2 | FULL DEMOLITION OF A DETACHED 3 STORY BUILDING ACTIVE SITE. OBSERVED MISSING PROJECT INFORMATION PANEL SIGNAGE FOR DE... | $1,250 | $1,250 | Jul 17, 2026 |
| Apr 28, 2026 | 39553577H | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION, 3-STORY BUILDING APPROX. 90% DEMOLISHED. NO DEMOLITION NOTIFICATION OBSERVED IN DOB SYSTEM OR ... | $2,500 | $2,500 | Jan 26, 2027 |
| Mar 9, 2026 | 39551405M | RESOLVE | CLASS - 1 | AT THE TIME OF RE-INSPECTION OF A 3 STORY DEMO, DURING MY INSPECTION I OBSERVED SITE CONDITIONS CONFIRMING CONTRACTOR... | $10,000 | $10,000 | Jan 26, 2027 |
| Mar 3, 2026 | 39551159X | RESOLVE | CLASS - 1 | BC3313.1 NO FDNY PERMIT FOR STORAGE OF DIESEL. AT THE TIME OF MY INSPECTION OF AN DEMOLITION OF A 3-STORY BUILDING, I... | $5,000 | $5,000 | Jan 26, 2027 |
| Mar 3, 2026 | 39551157M | RESOLVE | CLASS - 1 | AT THE TIME OF INSPECTION OF A DEMOLITION SITE, CONSTRUCTION DEBRIS WAS OBSERVED THROUGHOUT THE PREMISES. ELECTRICAL ... | $2,500 | $2,500 | Jan 26, 2027 |
| Mar 3, 2026 | 39551158Y | RESOLVE | CLASS - 1 | AT THE TIME OF INSPECTION, AN UNPROTECTED FLOOR OPENING WAS OBSERVED ON THE 2ND FLOOR. FAILURE TO SAFEGUARD OPEN HOLE... | $5,000 | $5,000 | Jan 26, 2027 |
| Mar 3, 2026 | 39551168H | RESOLVE | CLASS - 1 | AT THE TIME OF INSPECTION OF A 3-STORY DEMOLITION SITE, UPON REQUEST NO SITE SAFETY PLAN, APPROVED DESIGN DRAWINGS, O... | $2,500 | $2,500 | Jan 26, 2027 |
| Mar 3, 2026 | 39551169J | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION, OBSERVED ACTIVE DEMOLITION UPON REQUESTING CONSTRUCTION SUPERINTENDENT NON WAS PRESENT ONSITE ... | $5,000 | $5,000 | Jan 26, 2027 |
| Mar 3, 2026 | 39551170R | RESOLVE | CLASS - 1 | AT THE TIME OF INSPECTION OF A 3 STORY DEMOLITION SITE, TEMPORARY SHORING WAS OBSERVED IN PLACE. UPON REQUEST, NO APP... | $5,000 | $5,000 | Jan 26, 2027 |
| Mar 3, 2026 | 39551145P | RESOLVE | CLASS - 1 | AT THE TIME OF INSPECTION OF A 3 STORY DEMOLITION SITE, NO CONSTRUCTION SUPERINTENDENT WAS PRESENT. NO SITE SAFETY PL... | $10,000 | $10,000 | Jan 26, 2027 |
| Mar 3, 2026 | 39551160N | RESOLVE | CLASS - 1 | AT THE TIME OF INSPECTION, AN UNSAFE CONSTRUCTION OPERATION WAS OBSERVED, A MAKESHIFT DEBRIS CHUTE WAS CREATED THROUG... | $10,000 | $10,000 | Jan 26, 2027 |
| Jan 5, 2026 | 39548790K | RESOLVE | CLASS - 2 | DEMO SITE OBSERVED CONSTRUCTION FENCE INSTALLED AT EXP 1,2. FENCE NOT INSTALLED AT EXP3,4 NOT AS PER 3307.7.1. AS PER... | $1,000 | $1,000 | Sep 8, 2026 |