Maintenance code violations
1301 Hoe Avenue, Bronx • Block 02980 • Lot 0046
212 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| May 4, 2026 | B | VIOLATION WILL BE REINSPECTED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FEET AT CEILING ... | 5B | Jun 8, 2026 |
| May 4, 2026 | B | VIOLATION WILL BE REINSPECTED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FEET AT CEILING ... | 5B | Jun 8, 2026 |
| May 4, 2026 | B | VIOLATION WILL BE REINSPECTED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FEET AT CEILING ... | 5B | Jun 8, 2026 |
| Apr 30, 2026 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Aug 3, 2026 |
| Feb 13, 2026 | B | VIOLATION DISMISSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GFCI ELECTRICAL OUTLET IN [ HOT AND NEUTRAL REVERSE... | 2C | Mar 20, 2026 |
| Jan 2, 2026 | A | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FEET AT CEILING ... | 5B | Apr 7, 2026 |
| Jan 2, 2026 | B | NOV SENT OUT | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 2... | 5B | Feb 6, 2026 |
| Jan 2, 2026 | B | VIOLATION WILL BE REINSPECTED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ.FEET AT CEILI... | 5B | Feb 6, 2026 |
| Jan 2, 2026 | A | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FEET AT CEILING ... | 5B | Apr 7, 2026 |
| Jan 2, 2026 | A | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FEET AT CEILING ... | 5B | Apr 7, 2026 |
| Jan 2, 2026 | B | NOV SENT OUT | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, ... | 5B | Feb 6, 2026 |
| Dec 15, 2025 | A | VIOLATION DISMISSED | § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF D... | — | Mar 20, 2026 |
| Nov 24, 2025 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | — | Dec 8, 2025 |
| Nov 24, 2025 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1... | — | Feb 27, 2026 |
| Nov 24, 2025 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AND ASSEMBLY AT BUILDING VESTIBULE DOO... | — | Nov 30, 2025 |
| Oct 27, 2025 | A | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW IN THE 1st ROO... | 2C | Jan 30, 2026 |
| Oct 27, 2025 | A | VIOLATION CLOSED | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF RUSTED BATHTUB IN THE BATHROOM LOCATED AT APT 2C, 2... | 2C | Jan 30, 2026 |
| Sep 15, 2025 | B | VIOLATION CLOSED | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED AT DOOR LEADING TO FIRE... | 2C | Oct 20, 2025 |
| Jul 23, 2025 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 5... | — | Oct 26, 2025 |
| Jul 16, 2025 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE FAUCET IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM N... | 2C | Oct 19, 2025 |
| Jun 5, 2025 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Sep 8, 2025 |
| Apr 2, 2024 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Jul 6, 2024 |
| Mar 25, 2024 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE 4th ROOM FROM EAST LOCATED AT APT 5C, 5t... | 5C | Apr 20, 2024 |
| Mar 25, 2024 | B | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 15 SQ FT OBSERVED IN THE ... | 5C | Apr 29, 2024 |
| Mar 25, 2024 | A | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN TH... | 2C | Jun 28, 2024 |
| Mar 25, 2024 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st ... | 1C | Apr 20, 2024 |
| Mar 11, 2024 | C | VIOLATION CLOSED | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5t... | 5C | Mar 8, 2024 |
| Mar 11, 2024 | C | VIOLATION CLOSED | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED AT THE BASEMENT AT BOILER ROOM | — | Mar 17, 2024 |
| Mar 11, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE NORTH... | — | Apr 15, 2024 |
| Mar 11, 2024 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL, A... | — | Jun 14, 2024 |
| Mar 7, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL AT PUB... | — | Apr 11, 2024 |
| Mar 7, 2024 | A | VIOLATION CLOSED | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING R... | — | Jun 10, 2024 |
| Mar 7, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL AT PUB... | — | Apr 11, 2024 |
| Feb 29, 2024 | A | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL AT INTERMEDIATE ... | — | Jun 3, 2024 |
| Feb 29, 2024 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT INTERMEDI... | — | Jun 3, 2024 |
| Feb 29, 2024 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT NORTH WAL... | — | Jun 3, 2024 |
| Feb 29, 2024 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL AT INTERMEDIA... | — | Jun 3, 2024 |
| Feb 29, 2024 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT INTERMIDATE... | — | Jun 3, 2024 |
| Feb 29, 2024 | A | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL AT INTERMEDIATE ... | — | Jun 3, 2024 |
| Feb 28, 2024 | C | VIOLATION CLOSED | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3r... | 3C | Feb 28, 2024 |
| Feb 28, 2024 | C | VIOLATION CLOSED | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, ... | 3C | Feb 28, 2024 |
| Feb 28, 2024 | C | VIOLATION CLOSED | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | — | Mar 5, 2024 |
| Feb 22, 2024 | B | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELETRICAL OUTLET AT NORTH WALL IN THE 2nd ROOM FROM... | 1A | Mar 28, 2024 |
| Feb 22, 2024 | C | VIOLATION CLOSED | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED BOILER ROOM AT BOILER ROOM | — | Feb 28, 2024 |
| Feb 22, 2024 | C | VIOLATION CLOSED | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1s... | 1A | Feb 22, 2024 |
| Feb 20, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE... | 2C | Mar 26, 2024 |
| Feb 20, 2024 | A | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL OVER WINDOW HEADE... | 2C | May 25, 2024 |
| Dec 28, 2023 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING AND THE WEST WA... | 2C | Feb 1, 2024 |
| Dec 28, 2023 | B | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT THE DOOR IN THE ENTRANCE LOCATED AT... | 2C | Feb 1, 2024 |
| Dec 28, 2023 | A | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQUARE FEET AT T... | 2C | Apr 1, 2024 |