4200-4208 Park Avenue, Bronx
Bronx • Block 03034 • Lot 0001 • Zip: 10457
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 47 min 15 walking, 32 riding
- Times Square 49 min 15 walking, 34 riding
- Penn Station 50 min 15 walking, 35 riding
- Union Square 51 min 15 walking, 36 riding
- Fulton Street 57 min 15 walking, 42 riding
- Downtown Brooklyn 66 min 15 walking, 51 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Citi Bike
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
CLASS - 2
AT TIME OF INSPECTION OBSERVED INADEQUATE PEDESTRIAN PROTECTION AT EXP. 1. SIDEWALK IS BLOCKED BY ON GOING WORK. OBSE...
-
CLASS - 2
AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION ACTIVITIES. UPON FURTHER REVIEW NOTICE SIDEWALK SHED HAS BEING REM...
-
CLASS - 2
8 STORY NEW BUILDING ACTIVE SITE. OBSERVED CONSTRUCTION FENCE IN PLACE AT EXP#1 PERMIT#X01238419. UPON REVIEW OF APPR...
-
CLASS - 2
8 STORY NB ACTIVE SITE.ACTIVE EXTERIOR WORK OBSERVED NO/MISSING OR INADEQUATE ROOF PROTECTION OF ADJOINING PROPERTIES...
-
CLASS - 2
8 STORY NB ACTIVE SITE.OBSERVED PUMP JACK SCAFFOLDING IN PLACE APPROX 50 FT IN HEIGHT EXP#4 ATTACHED TO NB. UPON REVI...
-
CLASS - 2
8 STORY NEW BUILDING ACTIVE SITE. OBSERVED IN REAR YARD OF JOBSITE STRUCTURAL STEEL BRACING IN PLACE ATTACHED TO ADJO...
-
Alteration Type III
BPP APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION #X01238419-I1. TOTAL LOT FRONTAGE: 80.65 LINEAR FEET
2025
-
Subdivision Improved
SUBDIVISION APPLICATION FILED HEREWITH TO UPDATE METES AND BOUNDS, SUBDIVIDING TAX LOT 1 INTO TAX LOT 1 AND 58, ALL L...
2018
-
Alteration Type II
FILING IN CONJUNCTION WITH APPLICATION# 220409216 TO REGISTERED HVAC UNITS ON ROOF.
2017
-
DOB violation Nov 28, 2017
E-ELEVATOR ELEVATORREQUIRED
-
Alteration Type II
INSTALL FOUR HVAC UNITS AND ASSOCIATED GAS PIPING.
2016
-
DOB violation Dec 6, 2016
E-ELEVATOR ELEVATORREQUIRED
2015
2014
-
DOB violation Jun 27, 2014
E-ELEVATOR ELEVATORREQUIRED
2013
-
DOB violation May 16, 2013
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Mar 1, 2013
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2011
-
DOB violation Dec 13, 2011
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2009
-
Alteration Type II
Proposed: Construction of teh medical offices, plumbing and mchanical work as per plans filed herewith. No change of ...
2007
2006
2005
-
Alteration Type I
CONSTRUCTION OF THE MEDICAL OFFICES, PLUMBING AND MECHANICAL WORK AS PER PLANS FILED HEREWITH.
2004
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records