Skip to content

Job filings

Sbh Ambulatory Care Center, Bronx • Block 03051 • Lot 0045

16 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Dec 8, 2015 220487079 Alteration Type I PLAN EXAM - APPROVED $10,000 STB OWNER LLC
Apr 27, 2015 220234672 Alteration Type III SIGNED OFF FILING HEREWITH FOR BUILDER PAVEMENT PLAN WITH LINEAR FRONTAGE OF 97'. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER TH... $0 ST. BARNABAS HOSPITAL
Apr 21, 2015 220337614 Alteration Type III SIGNED OFF FILING HEREWITH FOR BUILDERS PAVING PLANS AS PER PLANS.FILED IN CONJUNCTION WITH NB#200348524.NO CHANGE IN USE,EGRESS... $0 ST. BARNABAS HOSPITAL
Feb 4, 2015 220337525 Alteration Type II SIGNED OFF FILING HEREWITH FOR CONSTRUCTION OF NEW CHAIN LINK FENCE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. $10,000 ST. BARNABAS HOSPITAL
Feb 4, 2015 220337543 Alteration Type III SIGNED OFF ALTERATION TYPE THREE APPLICATION FOR CURB CUTS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY U... $0 ST. BARNABAS HOSPITAL
Feb 4, 2015 220337516 Alteration Type III SIGNED OFF ALTERATION TYPE THREE APPLICATION FOR CURB CUTS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY U... $0 ST. BARNABAS HOSPITAL
Feb 24, 2014 220248658 Alteration Type II SIGNED OFF INSTALLATION OF PRE-ACTION ALARM SYSTEM IN PORTION OF CELLAR AREA AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCU... $1,000 ST. BARNABAS HOSPITAL
Aug 29, 2012 220095457 Alteration Type II SIGNED OFF SEE SECTION# 24. $20,000 ST. BARNABAS HOSPITAL
Jun 28, 2012 200642830 Alteration Type II SIGNED OFF Gas, water & sewer connections in conjunction with new building application #200 348524 & sprinkler/standpipe... $1,000 St. barnabas Hospital
Jun 6, 2012 220095723 Alteration Type II SIGNED OFF SEE SECTION #24. $0 ST. BARNABAS HOSPITAL
Mar 1, 2012 220156998 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK THIS APPLICATION IS FILED FOR THE LEGALIZATION OF ONE 300KW CUMMINS GENERATOR, 100 GALLON DAY TANK AND 6000 GALLON UST $45,000 ST. BARNABAS HOSPITAL
Oct 19, 2011 200924223 Alteration Type III SIGNED OFF INSTALLATION OF SCAFFOLD,180'LONG BY 85'HIGH, DURING CONSTRUCTION OF A PEDESTRIAN BRIDGE.NO CHANGES IN EGRESS, USE OR... $0 ST. BARBABAS HOSPITAL
Oct 19, 2011 200876123 Alteration Type III SIGNED OFF INSTALLATION OF HEAVY DUTY SIDEWALK BRIDGE, 40' DURING CONSTRUCTION OF PEDESTRIAN BRIDGE (PUBLIC SAFETY) NO CHANGE IN... $0 ST. BARBABAS HOSPITAL
Mar 9, 2005 200847548 Alteration Type II SIGNED OFF Filing herewith Architectural Drawings for Fire Protection Plan. No work to be done under this application. No change... $1,000 St. Barnabas Hospital
May 9, 2003 200622647 Alteration Type III SIGNED OFF ERECT SIDEWALK SHED ADJACENT TO ABOVE PR EMISES IN CONJUNCTION WITH NB 0348524;TOTAL LENGTH OF SHED:97'ON THIRD AVE.N... $0 ST.BARNABAS HOSPITAL
Feb 27, 2003 200702454 Alteration Type II PLAN EXAM - DISAPPROVED PROPOSED FIRE PROTECTION PLAN FOR NEW BU ILDING. NO CHANGE IN USE, EG S, OR OCCUPANCY. NOTE: NO WORK. $1,000 ST BARNABAS HOSPITAL