ECB violations

Oak Tree Place, Bronx • Block 03063 • Lot 0146

36 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Aug 11, 2026 39557765N ACTIVE CLASS - 2 7 STORY NB, ACTIVE WORK SITE. OBSERVED SITE SAFETY COORDINATOR ON SITE WITH ADEQUATE LOGS REFLECTING SITE CONDITIONS.... $2,500 $2,500 Oct 16, 2026
Aug 1, 2026 39557390X ACTIVE CLASS - 1 AT TIME OF INSPECTION, OBSERVED 7-STORY BUILDING. UNSECURED YODOCKS WERE OBSERVED AT EXPOSURE 1 AND WERE NOT MAINTAIN... $2,500 $2,500 Oct 16, 2026
Aug 1, 2026 39557389Z ACTIVE CLASS - 2 AT TIME OF INSPECTION, OBSERVED 7-STORY BUILDING. STORAGE ZONE AT EXPOSURE 1 WAS NOT MAINTAINED. REQUIRED 4-FOOT BARR... $2,500 $2,500 Oct 16, 2026
Jul 30, 2026 39557336P ACTIVE CLASS - 1 7 STORY NB ACTIVE SITE. OBSERVED FROM 1 TO 3 FL SHEETROCK FLAT ON STAIRS TREADS/LANDINGS IN STAIRCASE WITH TRASH PART... $2,500 $2,500 Oct 16, 2026
Jul 30, 2026 39557335N ACTIVE CLASS - 1 7 STORY NB ACTIVE SITE.CONTRARY TO DOCS ONSITE/SSP,OBSERVED EXTERIOR WORK ON SUPPORTED SCAFFOLD AT EXP#1,3,4.WORKER'S... $2,500 $2,500 Oct 16, 2026
Jul 28, 2026 39557223Z ACTIVE CLASS - 2 ATIO, NO MIRRORS WERE PROVIDED OR INSTALLED AT THE CORNERS/INTERSECTIONS OF THE SIDEWALK SHED PEDESTRIAN PATHWAY, CRE... $2,400 $2,400 Oct 2, 2026
Jul 28, 2026 39557196M ACTIVE CLASS - 1 AT THE TIME OF INSPECTION OF A 7-STORY BUILDING UNDER CONSTRUCTION, INADEQUATE HOUSEKEEPING WAS OBSERVED THROUGHOUT T... $2,500 $2,500 Oct 2, 2026
Jul 22, 2026 39556912J ACTIVE CLASS - 1 AT THE TIME OF INSPECTION OF THE ACTIVE CONSTRUCTION SITE 7-STORY NEW BUILDING TOPPED OFF, A WORKER PERFORMING WINDOW... $2,500 $2,500 Oct 2, 2026
Jul 9, 2026 39556425M ACTIVE CLASS - 2 AT THE TIME OF INSPECTION, RESPONDING TO AN INCIDENT WHERE A SITE PERSONNEL SUSTAINED INJURIES TO THE RIGHT ARM ON TH... $2,500 $2,500 Sep 18, 2026
Jul 9, 2026 39556427X ACTIVE CLASS - 1 AT THE TIME OF INSPECTION, RESPONDING TO AN INCIDENT WHERE A SITE SAFETY PERSONNEL GOT INJURED ON THE 5 TH FLOOR LEVE... $2,500 $2,500 Sep 18, 2026
Jul 9, 2026 39556426Y ACTIVE CLASS - 1 RESPONDING TO AN INCIDENT WHERE THE SITE SAFETY PERSONNEL WAS DOING HER ROUNDS ON THE 5TH FLOOR LEVEL WHEN SHE GOT CU... $5,000 $5,000 Sep 18, 2026
Jul 9, 2026 39556428H ACTIVE CLASS - 2 AT THE TIME OF INSPECTION, I OBSERVED ON WADE SQUARE STREET FULL CLOSER OF FOR SHEETROCK DELIVERY OPERATION, UPON RES... $2,500 $2,500 Sep 18, 2026
Jul 9, 2026 39556429J ACTIVE CLASS - 1 AT THE TIME OF INSPECTION, I OBSERVED AT EXP#1 A BOOM TRUCK FOR LIFTING MATERIALS ON THE STREET IS BEING USED TO HOIS... $2,500 $2,500 Sep 18, 2026
Jul 9, 2026 39556430R ACTIVE CLASS - 1 AT THE TIME OF INSPECTION, I OBSERVED ONGOING CONSTRUCTION WORK AT A 7-STORY PROPOSED NEW BUILDING AT ROOF DECK, UPON... $10,000 $10,000 Sep 18, 2026
Jul 1, 2026 39556039Y RESOLVE CLASS - 1 INCIDENT OCCURRED ON 6/28/2026 WHERE A WORKER WAS USING A-FRAME LADDER ON THE 5 FLOOR LEVEL, ON A UNEVEN SURFACE WHER... $5,000 $5,000 Sep 4, 2026
Jul 1, 2026 39556037K RESOLVE CLASS - 1 AT THE TIME OF INSPECTION, AT AN 7-STORY PROPOSED NB. PLASTIC JERSEY BARRIERS PLACED IN THE ROADWAY WERE NOT IN ACCOR... $2,500 $2,500 Sep 4, 2026
Jul 1, 2026 39556038M RESOLVE CLASS - 1 AT THE TIME OF INSPECTION OF A 7-STORY PROPOSED NEW BUILDING, ACTIVE JOBSITE DURING MY INSPECTION, I OBSERVED PIPE SC... $5,000 $5,000 Sep 4, 2026
Jul 1, 2026 39556040L RESOLVE CLASS - 2 AT TIME OF INSPECTION OF A 7-STORY PROPOSED NEW BUILDING, ACTIVE JOBSITE I OBSERVED HOLES GREATER THAN 2INCH THROUGHO... $2,500 $2,500 Sep 4, 2026
Jul 1, 2026 39556036Z RESOLVE CLASS - 1 AT TIME OF INSPECTION OF A 7-STORY PROPOSED NEW BUILDING, I OBSERVED INADEQUATE HOUSEKEEPING THROUGHOUT THE JOBSITE, ... $2,500 $2,500 Sep 4, 2026
Jun 28, 2026 39194057M RESOLVE CLASS - 1 AT TIME OF INCIDENT INSPECTION OBSERVED WHERE CONSTRUCTION WORKER DARWIN FLORES FELL FROM A-FRAME LADDER ,INJURED AND... $10,000 $10,000 Sep 4, 2026
Jun 28, 2026 39194058Y RESOLVE CLASS - 2 AT TIME OF INSPECTION OBSERVED AT 5 FLOOR EXCESSIVE AMOUNT CONSTRUCTION DEBRIS STORED., MAINTAIN ADEQUATE CONSTRUCTIO... $0 $0 Sep 4, 2026
Jun 28, 2026 39194056K RESOLVE CLASS - 1 AT TIME OF INSPECTION AS PER FOREMEN DARRREL DAVIS CONSTRUCTION WORKER FELL FROM LADDER AT 5 FLOOR. WORKER DARWIN FLO... $10,000 $10,000 Sep 4, 2026
Jun 15, 2026 39555633M RESOLVE CLASS - 2 7 STORY NB ACTIVE SITE.OBSERVED UNFINISHED EXTERIOR WORK WITHIN 5 FT OF ADJOINING PROPERTY WINDOWS AT EXP#2.2 STORY O... $2,500 $2,500 Aug 21, 2026
Jun 15, 2026 39555629J RESOLVE CLASS - 2 7 STORY NEW BUILDING ACTIVE SITE. OBSERVED LARGE PILES OF COMBUSTIBLE CONSTRUCTION MATERIALS/DEBRIS WOOD, PLASTIC, FO... $2,500 $2,500 Aug 21, 2026
Jun 15, 2026 39555632K RESOLVE CLASS - 1 PROPOSED 7 STORY AT 4 FLOOR WORKING DECK ACTIVE SITE. OBSERVED INADEQUATE GUARDRAIL SYSTEMS AT MULTIPLE FLOORS/LOCATI... $5,000 $5,000 Aug 21, 2026
Jun 15, 2026 39555634Y RESOLVE CLASS - 1 7 STORY NB ACTIVE SITE.STRUCTURAL FORMWORK 4 FL WORKING DECK.CONTRARY TO PLANS ONSITE, INSIDE STAIRWELL 14 'OPENINGS ... $2,500 $2,500 Aug 21, 2026
Jun 15, 2026 39555630R RESOLVE CLASS - 2 7 STORY NB ACTIVE SITE.OBSERVED SIDEWALK SHED/OVERHEAD PROTECTION(OHP) IN PLACE AT EXP#1,2 PERMIT#X01181228. UPON REV... $0 $0 Aug 21, 2026
Jun 15, 2026 39555631Z RESOLVE CLASS - 2 7 STORY NB ACTIVE SITE.WORK CONTRARY TO APPROVED SITE SAFETY PLANS (SSP).OBSERVED FORMWORK AT EXP#1 ACTIVE ABOVE WORK... $0 $0 Aug 21, 2026
May 15, 2026 39554178P RESOLVE CLASS - 2 AT THE TIME OF INSPECTION OF THE PROPOSED 7-STORY NEW BUILDING, I OBSERVED THE CONSTRUCTION FENCE ALONG OAK TREE PLAC... $0 $0 Jul 31, 2026
May 15, 2026 39554179R RESOLVE CLASS - 2 AT THE TIME OF INSPECTION OF A 7-STORY PROPOSED NEW BUILDING, CONSTRUCTION FENCE DUMPING EXTENDING INTO THE CURB LINE... $2,500 $2,500 Jan 8, 2027
Mar 16, 2026 39551798M RESOLVE CLASS - 1 AT THE TIME OF INSPECTION, I OBSERVED ACTIVE EXCAVATION PHASE AT A 7-STORY NEW BUILDING WITH PILE DRIVING OPERATIONS ... $10,000 $10,000 Oct 23, 2026
Mar 16, 2026 39551817Z RESOLVE CLASS - 2 AT THE TIME OF INSPECTION, I OBSERVED ACTIVE EXCAVATION WORK IN PROGRESS, I NOTICED SOIL WATER RUNNING OUT OF JOBSITE... $2,500 $2,500 Oct 23, 2026
Mar 16, 2026 39551815P RESOLVE CLASS - 1 AT THE TIME OF INSPECTION, I OBSERVED WORKERS DRILLING SOLDIER PILES AT EXPOSURE #2. INSTALLATION OF SOLDIER PILES NO... $2,500 $2,500 Oct 23, 2026
Mar 16, 2026 39551800M RESOLVE CLASS - 1 AT THE TIME OF INSPECTION OF A 7-STORY PROPOSED NEW BUILDING AT EXCAVATION AND PILE DRIVING PHASE, UPON REQUESTING TH... $5,000 $5,000 Oct 23, 2026
Mar 16, 2026 39551799Y RESOLVE CLASS - 2 AT THE TIME OF INSPECTION OF A 7-STORY NEW BUILDING, UPON REQUEST FOR THE DOB-APPROVED SITE SAFETY PLAN, NONE WAS PRE... $2,500 $2,500 Oct 23, 2026
Mar 16, 2026 39551816R RESOLVE CLASS - 2 AT THE TIME OF INSPECTION, I OBSERVED COMPRESSED OXYGEN/FLAMMABLE GAS CYLINDER STORED UNSECURED ONSITE WITHOUT AN APP... $2,500 $2,500 Oct 23, 2026