Job filings
3 Avenue, Bronx • Block 03064 • Lot 0001
141 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Jul 26, 2024 | 220122169 | Alteration Type II | SIGNED OFF | FILING HEREWITH TO SHOW THE REMOVAL OF THE HYDRO-PNEUMATIC TANK LOCATED IN THE PENTHOUSE AND SHOW THE NEW SPRINKLER S... | $1,000 | ST. BARNABAS HOSPITAL |
| Mar 5, 2024 | 200732314 | Alteration Type II | SIGNED OFF | ALTER AND REMOVE PORTION OF EXISTING DUC TWORK CAP AND REMOVE PL FIXTURE AND PIPING INSTALL NEW PL FIXTURES CAP AND R... | $350,000 | ST BARNAAS HOSP |
| Mar 30, 2023 | 220587096 | Alteration Type II | SIGNED OFF | FACADE REHABILITATION AT ST. BARNABAS HOSPITAL. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $500,000 | ST. BARNABAS HOSPITAL |
| Mar 10, 2022 | 240178259 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | ST. BARNABAS HOSPITAL |
| Jan 27, 2022 | 220686014 | Alteration Type II | SIGNED OFF | INTERIOR RENOVATIONS ON 4TH FLOOR CT SCAN ROOM AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY | $10,000 | ST. BARNABAS HOSPITAL |
| Jul 20, 2020 | 220730742 | Alteration Type II | SIGNED OFF | MINOR RENOVATION TO EXISTING OUTPATIENT PHARMACY AT EXISTING HOSPITAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $30,000 | ST BARNABAS HOSPITAL |
| Mar 20, 2020 | 220686023 | Alteration Type II | PLAN EXAM - APPROVED | INSTALLATION OF TEMPORARY EMERGENCY 20 X 40 TENT AS PER THE NYC OEM. NO CHANGE IN USE EGRESS OR OCCUPANCY. | $10,000 | ST. BARNABAS HOSPITAL |
| Oct 1, 2018 | 240238961 | Alteration Type II | APPLICATION PROCESSED - ENTIRE | FACADE REHABILITATION. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $500,000 | ST. BARNABAS HOSPITAL |
| Aug 3, 2018 | 220332986 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | APPLICATION FILED HEREWITH FOR THE LEGALIZATION OF AN INSTALLES/EXISTING AUTOM ATIC FIRE PUMP AT 2175 QUARRY ROAD(ST.... | $150,000 | ST. BARNABAS HOSPITAL |
| Feb 26, 2018 | 220518385 | Alteration Type II | SIGNED OFF | INSTALL TEMPORARY MOBILE BOILER AND FUEL OIL TANK PER PLANS. | $0 | ST. BARNABAS HOSPITAL |
| Dec 15, 2017 | 200624477 | Alteration Type II | SIGNED OFF | REMOVE EXISTNG MASONARY ENCLOSURE, CONCRETE PAD & OXYGEN TANK & OTHER MISC EQ CONSTRUCT NEW CONCRETE PAD INST... | $35,000 | ST BARBANAS HOSP |
| Sep 29, 2017 | 220615001 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALL NEW FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS. FIRE SUPPRESSION SYSTEM BEING FILED IN CONJUNCTION WITH D... | $3,000 | CITADEL CARE CENTERS |
| Dec 21, 2016 | 220404373 | Alteration Type II | SIGNED OFF | HEREWITH FILING FOR FIRE SUPPRESSION SYSTEM FOR ROOF ELEVATOR MACHINE ROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $50,000 | ST. BARNABAS HOSPITAL |
| Sep 2, 2016 | 220404514 | Alteration Type II | SIGNED OFF | INSTALLATION OF AUTOMATIC HEAT DECTECTION FOR AEROSOL FIRE SUPPRESSION SYSTEM. | $30,000 | ST. BARNABAS HOSPITAL |
| Aug 12, 2016 | 220531752 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | HEREWITH FILING TO REPLACE BOILER # 2 FOR ST. BARNABAS HOSPITAL | $0 | ST. BARNABAS HOSPITAL |
| Aug 21, 2015 | 220404364 | Alteration Type II | SIGNED OFF | HEREWITH FILING MECHANICAL PLANS FOR ELEVATOR MACHINE ROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $60,000 | ST. BARNABAS HOSPITAL |
| Aug 5, 2015 | 220288962 | New Building | SIGNED OFF | HEREWITH FILING STRUCTURAL PLANS TO ACCESSORY BOILER PLANT TO MAIN HOSPITAL | $0 | ST. BARNABAS HOSPITAL |
| Jul 17, 2015 | 220446051 | Alteration Type II | SIGNED OFF | MODIFY EXISTING SPRINKLER SYSTEM AT NURSING HOME TO ADD 10 SP. HEADS AT CELLAR AND 2 SP. HEADS AT GROUND FLOOR AS PER... | $25,000 | ST. BARNABAS HOSPITAL |
| Jun 26, 2015 | 220347113 | Alteration Type III | SIGNED OFF | HEREWITH FILING BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NB APPLICATION # 220288962. | $0 | ST. BARNABAS HOSPITAL |
| Jun 24, 2015 | 220340174 | Alteration Type II | SIGNED OFF | EXCAVATION WORK FOR PROPOSED NEW BUILDING AS PER PLANS. NEW BUILDING FILED UNDER APPLICATION # 220288962. NO CHANGES ... | $800,000 | ST. BARNABAS HOSPITAL |
| Jun 23, 2015 | 220334831 | Alteration Type II | SIGNED OFF | THIS APPLICATION ID FILED FOR THE PERMANENT CLOSURE (ABANDON IN-PLACE) OF ONE (1) 2,000 GALLON UNDERGROUND FUEL OIL S... | $10,000 | ST. BARNABAS HOSPITAL |
| Jun 11, 2015 | 220356362 | Alteration Type II | SIGNED OFF | HEREWITH FILING MECHANICAL, PLUMBING AND SPRINKLER WORK AT SBH EMPLOYEE BUILDING AS PER PLANS IN CONJUNCTION WITH NB ... | $180,000 | ST. BARNABAS HOSPITAL |
| Jun 11, 2015 | 220360856 | Alteration Type II | SIGNED OFF | HEREWITH FILING TO INSTALL BOILERS, SPRINKLERS AND MECHANICAL SYSTEM AS PER PLANS, IN CONJUNCTION WITH NB 220288962. ... | $1,000,000 | ST. BARNABAS HOSPITAL |
| Jun 5, 2015 | 220354916 | Alteration Type II | SIGNED OFF | REPLACEMENT OF EXISTING CHILLER #3 IN MAIN BUILDING. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $100,000 | ST. BARNABAS HOSPITAL |
| Jun 5, 2015 | 220391458 | Alteration Type II | SIGNED OFF | HEREWITH FILING TO SHOW A FUEL OIL DAY TANK FOR THE NEW BOILERS, AND A DIESEL FUEL TANK FOR THE NEW GENERATOR. BOILER... | $200,000 | ST. BARNABAS HOSPITAL |
| May 15, 2015 | 220350448 | Alteration Type II | SIGNED OFF | HEREWITH FILING A SITE PLAN APPLICATION IN CONJUNCTION WITH NB. SHOW SITE CONNECTION TO EXISTING DETENTION TANKS. NO ... | $90,000 | ST. BARNABAS HOSPITAL |
| Apr 28, 2015 | 220354943 | Alteration Type II | SIGNED OFF | INSTALLATION OF MANUAL, AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPA... | $40,000 | ST. BARNABAS HOSPITAL |
| Feb 13, 2015 | 220283002 | Alteration Type II | SIGNED OFF | HEREWITH FILING MECHNICAL .SPRINKLER AND PLUMBING WORK FOR COMPREHENSIVE DETOX UNIT AT 4TH FLOOR. NO CHANGE IN USE ,E... | $330,500 | ST. BARNABAS HOSPITAL |
| Feb 12, 2015 | 220283020 | Alteration Type II | SIGNED OFF | ADDITION/MODIFICATION TO AN EXISTING FIRE ALARM SYSTEM AS PER PLANS IN CONJUNCTION WITH ALT-II #220282995. NO CHANGE ... | $5,000 | ST. BARNABAS HOSPITAL |
| Feb 4, 2015 | 220282995 | Alteration Type II | SIGNED OFF | RECONFIGURATION OF INTERIOR NON BEARING PARTITONS TO EXISTING DETOX DEPARTMENT AT 4TH FLOOR LEVEL. NO CHANGE IN USE, ... | $120,000 | ST. BARNABAS HOSPITAL |
| Jan 22, 2015 | 220334261 | Alteration Type II | SIGNED OFF | MINOR STRUCTURAL WORK IN CONJUNCTION WITH C.T. SCANNER RENOVATION AT ST. BARNABAS HOSPITAL ER DEPARTMENT AS PER PLANS... | $15,000 | ST. BARNABAS HOSPITAL |
| Dec 9, 2014 | 220334289 | Alteration Type II | SIGNED OFF | — | $75,000 | ST. BARNABAS HOSPITAL |
| Dec 4, 2014 | 220334270 | Alteration Type II | SIGNED OFF | MINOR DUCTWORK RELOCATION, PLUMBING, AND SPRINKLER MODIFICATION IN CONJUNCTION WITH CT SCANNER RENOVATION AT ST. BARN... | $40,000 | ST. BARNABAS HOSPITAL |
| Dec 4, 2014 | 220392938 | Alteration Type II | SIGNED OFF | MINOR ADDITION TO EXISTING SPRINKLER SYSTEM AT NURSING HOME. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $32,000 | ST. BARNABAS HOSPITAL |
| Nov 20, 2014 | 220380013 | Alteration Type III | SIGNED OFF | INSTALLATION OF 157 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 ... | $0 | CENTRAL CONSULTING & CONTRACTING |
| Nov 20, 2014 | 220380022 | Alteration Type III | SIGNED OFF | INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHAN... | $0 | CENTRAL CONSULTING & CONTRACTING |
| Nov 20, 2014 | 220360222 | Alteration Type II | SIGNED OFF | HEREWITH REPLACING EXISTING EXHAUST DUCT AND EXHAUST BLOWER AT THE LAUNDRY ROOM. NO CHANGE IN USE EGRESS, OR OCCUPANCY. | $28,000 | ST. BARNABAS HOSPITAL |
| Sep 9, 2014 | 220390690 | Alteration Type II | SIGNED OFF | PROPOSE REMOVAL OF BRICKS FROM MASONRY BOILER STACK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $225,000 | ST. BARNABAS HOSPITAL |
| Sep 9, 2014 | 220397130 | Alteration Type II | SIGNED OFF | PROPOSE INSTALLATION OF CHUTE FOR WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS AND OCCUPANCY. | $0 | ST. BARNABAS HOSPITAL |
| Feb 20, 2014 | 220235591 | Alteration Type II | SIGNED OFF | FILING HEREWITH FOR MODIFICATION TO EXISTING SMOKE/HEAT AND SPRINKLER FIRE ALARM SYSTEM AS PER PLANS. SPECIFICALLY FI... | $13,000 | ST. BARNABAS HOSPITAL |
| Nov 18, 2013 | 220141102 | Alteration Type II | SIGNED OFF | MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $2,100 | ST. BARNABAS HOSPITAL |
| Nov 1, 2013 | 220146125 | Alteration Type II | SIGNED OFF | FILING HEREWITH FOR MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $6,000 | ST. BARNABAS HOSPITAL |
| Sep 13, 2013 | 200635857 | Alteration Type II | SIGNED OFF | INSTALL FIRE SUPPRESSION SYSTEM NO CHANGE TO USE EGRESS OR OCCUPANCY | $2,000 | ST BARNABUS HOSPITAL |
| Jun 24, 2013 | 210062091 | Alteration Type II | SIGNED OFF | MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER TH... | $25,000 | ST. BARNABAS HOSPITAL |
| May 20, 2013 | 220007221 | Alteration Type III | SIGNED OFF | INSTALLATION OF 8 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. LIVE LOAD 300 PSF. SIDEWALK SHED SHAL... | $0 | ST BARNABAS NURSING HOME |
| Apr 29, 2013 | 220130132 | Alteration Type II | SIGNED OFF | HERWITH FILING FOR DETENTION TANKS IN CONJUNCTION WITH SITE APPLICATION # 220124577 NO CHANGE IN USE EGRESS OR OCCUPA... | $100,000 | ST. BARNABAS HOSPITAL |
| Apr 25, 2013 | 220126192 | Alteration Type II | SIGNED OFF | REPLACE GAS PIPING FILED IN CONJUCTION WITH #210144921. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $66,000 | ST. BARNABUS HOSPITAL |
| Mar 22, 2013 | 220052859 | Alteration Type II | SIGNED OFF | MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER T... | $6,000 | ST. BARNABAS HOSPITAL |
| Mar 8, 2013 | 220128421 | Alteration Type II | SIGNED OFF | THIS APPLICATION IS FILED TO REPLACE BURNERS FOR THREE EXISTING BOILERS 1,2 & 3. | $0 | ST. BARNABAS HOSPITAL |
| Mar 5, 2013 | 220170892 | Alteration Type II | SIGNED OFF | FILING HEREWITH FOR PLUMBING WORK AS PER PLANS. SPECIFICALLY FILING A WATER METER AND A DOUBLE CHECK VALVE (SECONDARY... | $3,000 | ST. BARNABAS HOSPITAL |