Skip to content

Job filings

3 Avenue, Bronx • Block 03064 • Lot 0001

141 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Jul 26, 2024 220122169 Alteration Type II SIGNED OFF FILING HEREWITH TO SHOW THE REMOVAL OF THE HYDRO-PNEUMATIC TANK LOCATED IN THE PENTHOUSE AND SHOW THE NEW SPRINKLER S... $1,000 ST. BARNABAS HOSPITAL
Mar 5, 2024 200732314 Alteration Type II SIGNED OFF ALTER AND REMOVE PORTION OF EXISTING DUC TWORK CAP AND REMOVE PL FIXTURE AND PIPING INSTALL NEW PL FIXTURES CAP AND R... $350,000 ST BARNAAS HOSP
Mar 30, 2023 220587096 Alteration Type II SIGNED OFF FACADE REHABILITATION AT ST. BARNABAS HOSPITAL. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. $500,000 ST. BARNABAS HOSPITAL
Mar 10, 2022 240178259 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $0 ST. BARNABAS HOSPITAL
Jan 27, 2022 220686014 Alteration Type II SIGNED OFF INTERIOR RENOVATIONS ON 4TH FLOOR CT SCAN ROOM AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY $10,000 ST. BARNABAS HOSPITAL
Jul 20, 2020 220730742 Alteration Type II SIGNED OFF MINOR RENOVATION TO EXISTING OUTPATIENT PHARMACY AT EXISTING HOSPITAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $30,000 ST BARNABAS HOSPITAL
Mar 20, 2020 220686023 Alteration Type II PLAN EXAM - APPROVED INSTALLATION OF TEMPORARY EMERGENCY 20 X 40 TENT AS PER THE NYC OEM. NO CHANGE IN USE EGRESS OR OCCUPANCY. $10,000 ST. BARNABAS HOSPITAL
Oct 1, 2018 240238961 Alteration Type II APPLICATION PROCESSED - ENTIRE FACADE REHABILITATION. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. $500,000 ST. BARNABAS HOSPITAL
Aug 3, 2018 220332986 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK APPLICATION FILED HEREWITH FOR THE LEGALIZATION OF AN INSTALLES/EXISTING AUTOM ATIC FIRE PUMP AT 2175 QUARRY ROAD(ST.... $150,000 ST. BARNABAS HOSPITAL
Feb 26, 2018 220518385 Alteration Type II SIGNED OFF INSTALL TEMPORARY MOBILE BOILER AND FUEL OIL TANK PER PLANS. $0 ST. BARNABAS HOSPITAL
Dec 15, 2017 200624477 Alteration Type II SIGNED OFF REMOVE EXISTNG MASONARY ENCLOSURE, CONCRETE PAD & OXYGEN TANK & OTHER MISC EQ CONSTRUCT NEW CONCRETE PAD INST... $35,000 ST BARBANAS HOSP
Sep 29, 2017 220615001 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK INSTALL NEW FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS. FIRE SUPPRESSION SYSTEM BEING FILED IN CONJUNCTION WITH D... $3,000 CITADEL CARE CENTERS
Dec 21, 2016 220404373 Alteration Type II SIGNED OFF HEREWITH FILING FOR FIRE SUPPRESSION SYSTEM FOR ROOF ELEVATOR MACHINE ROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $50,000 ST. BARNABAS HOSPITAL
Sep 2, 2016 220404514 Alteration Type II SIGNED OFF INSTALLATION OF AUTOMATIC HEAT DECTECTION FOR AEROSOL FIRE SUPPRESSION SYSTEM. $30,000 ST. BARNABAS HOSPITAL
Aug 12, 2016 220531752 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK HEREWITH FILING TO REPLACE BOILER # 2 FOR ST. BARNABAS HOSPITAL $0 ST. BARNABAS HOSPITAL
Aug 21, 2015 220404364 Alteration Type II SIGNED OFF HEREWITH FILING MECHANICAL PLANS FOR ELEVATOR MACHINE ROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $60,000 ST. BARNABAS HOSPITAL
Aug 5, 2015 220288962 New Building SIGNED OFF HEREWITH FILING STRUCTURAL PLANS TO ACCESSORY BOILER PLANT TO MAIN HOSPITAL $0 ST. BARNABAS HOSPITAL
Jul 17, 2015 220446051 Alteration Type II SIGNED OFF MODIFY EXISTING SPRINKLER SYSTEM AT NURSING HOME TO ADD 10 SP. HEADS AT CELLAR AND 2 SP. HEADS AT GROUND FLOOR AS PER... $25,000 ST. BARNABAS HOSPITAL
Jun 26, 2015 220347113 Alteration Type III SIGNED OFF HEREWITH FILING BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NB APPLICATION # 220288962. $0 ST. BARNABAS HOSPITAL
Jun 24, 2015 220340174 Alteration Type II SIGNED OFF EXCAVATION WORK FOR PROPOSED NEW BUILDING AS PER PLANS. NEW BUILDING FILED UNDER APPLICATION # 220288962. NO CHANGES ... $800,000 ST. BARNABAS HOSPITAL
Jun 23, 2015 220334831 Alteration Type II SIGNED OFF THIS APPLICATION ID FILED FOR THE PERMANENT CLOSURE (ABANDON IN-PLACE) OF ONE (1) 2,000 GALLON UNDERGROUND FUEL OIL S... $10,000 ST. BARNABAS HOSPITAL
Jun 11, 2015 220356362 Alteration Type II SIGNED OFF HEREWITH FILING MECHANICAL, PLUMBING AND SPRINKLER WORK AT SBH EMPLOYEE BUILDING AS PER PLANS IN CONJUNCTION WITH NB ... $180,000 ST. BARNABAS HOSPITAL
Jun 11, 2015 220360856 Alteration Type II SIGNED OFF HEREWITH FILING TO INSTALL BOILERS, SPRINKLERS AND MECHANICAL SYSTEM AS PER PLANS, IN CONJUNCTION WITH NB 220288962. ... $1,000,000 ST. BARNABAS HOSPITAL
Jun 5, 2015 220354916 Alteration Type II SIGNED OFF REPLACEMENT OF EXISTING CHILLER #3 IN MAIN BUILDING. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. $100,000 ST. BARNABAS HOSPITAL
Jun 5, 2015 220391458 Alteration Type II SIGNED OFF HEREWITH FILING TO SHOW A FUEL OIL DAY TANK FOR THE NEW BOILERS, AND A DIESEL FUEL TANK FOR THE NEW GENERATOR. BOILER... $200,000 ST. BARNABAS HOSPITAL
May 15, 2015 220350448 Alteration Type II SIGNED OFF HEREWITH FILING A SITE PLAN APPLICATION IN CONJUNCTION WITH NB. SHOW SITE CONNECTION TO EXISTING DETENTION TANKS. NO ... $90,000 ST. BARNABAS HOSPITAL
Apr 28, 2015 220354943 Alteration Type II SIGNED OFF INSTALLATION OF MANUAL, AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPA... $40,000 ST. BARNABAS HOSPITAL
Feb 13, 2015 220283002 Alteration Type II SIGNED OFF HEREWITH FILING MECHNICAL .SPRINKLER AND PLUMBING WORK FOR COMPREHENSIVE DETOX UNIT AT 4TH FLOOR. NO CHANGE IN USE ,E... $330,500 ST. BARNABAS HOSPITAL
Feb 12, 2015 220283020 Alteration Type II SIGNED OFF ADDITION/MODIFICATION TO AN EXISTING FIRE ALARM SYSTEM AS PER PLANS IN CONJUNCTION WITH ALT-II #220282995. NO CHANGE ... $5,000 ST. BARNABAS HOSPITAL
Feb 4, 2015 220282995 Alteration Type II SIGNED OFF RECONFIGURATION OF INTERIOR NON BEARING PARTITONS TO EXISTING DETOX DEPARTMENT AT 4TH FLOOR LEVEL. NO CHANGE IN USE, ... $120,000 ST. BARNABAS HOSPITAL
Jan 22, 2015 220334261 Alteration Type II SIGNED OFF MINOR STRUCTURAL WORK IN CONJUNCTION WITH C.T. SCANNER RENOVATION AT ST. BARNABAS HOSPITAL ER DEPARTMENT AS PER PLANS... $15,000 ST. BARNABAS HOSPITAL
Dec 9, 2014 220334289 Alteration Type II SIGNED OFF $75,000 ST. BARNABAS HOSPITAL
Dec 4, 2014 220334270 Alteration Type II SIGNED OFF MINOR DUCTWORK RELOCATION, PLUMBING, AND SPRINKLER MODIFICATION IN CONJUNCTION WITH CT SCANNER RENOVATION AT ST. BARN... $40,000 ST. BARNABAS HOSPITAL
Dec 4, 2014 220392938 Alteration Type II SIGNED OFF MINOR ADDITION TO EXISTING SPRINKLER SYSTEM AT NURSING HOME. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. $32,000 ST. BARNABAS HOSPITAL
Nov 20, 2014 220380013 Alteration Type III SIGNED OFF INSTALLATION OF 157 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 ... $0 CENTRAL CONSULTING & CONTRACTING
Nov 20, 2014 220380022 Alteration Type III SIGNED OFF INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHAN... $0 CENTRAL CONSULTING & CONTRACTING
Nov 20, 2014 220360222 Alteration Type II SIGNED OFF HEREWITH REPLACING EXISTING EXHAUST DUCT AND EXHAUST BLOWER AT THE LAUNDRY ROOM. NO CHANGE IN USE EGRESS, OR OCCUPANCY. $28,000 ST. BARNABAS HOSPITAL
Sep 9, 2014 220390690 Alteration Type II SIGNED OFF PROPOSE REMOVAL OF BRICKS FROM MASONRY BOILER STACK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $225,000 ST. BARNABAS HOSPITAL
Sep 9, 2014 220397130 Alteration Type II SIGNED OFF PROPOSE INSTALLATION OF CHUTE FOR WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS AND OCCUPANCY. $0 ST. BARNABAS HOSPITAL
Feb 20, 2014 220235591 Alteration Type II SIGNED OFF FILING HEREWITH FOR MODIFICATION TO EXISTING SMOKE/HEAT AND SPRINKLER FIRE ALARM SYSTEM AS PER PLANS. SPECIFICALLY FI... $13,000 ST. BARNABAS HOSPITAL
Nov 18, 2013 220141102 Alteration Type II SIGNED OFF MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $2,100 ST. BARNABAS HOSPITAL
Nov 1, 2013 220146125 Alteration Type II SIGNED OFF FILING HEREWITH FOR MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $6,000 ST. BARNABAS HOSPITAL
Sep 13, 2013 200635857 Alteration Type II SIGNED OFF INSTALL FIRE SUPPRESSION SYSTEM NO CHANGE TO USE EGRESS OR OCCUPANCY $2,000 ST BARNABUS HOSPITAL
Jun 24, 2013 210062091 Alteration Type II SIGNED OFF MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER TH... $25,000 ST. BARNABAS HOSPITAL
May 20, 2013 220007221 Alteration Type III SIGNED OFF INSTALLATION OF 8 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. LIVE LOAD 300 PSF. SIDEWALK SHED SHAL... $0 ST BARNABAS NURSING HOME
Apr 29, 2013 220130132 Alteration Type II SIGNED OFF HERWITH FILING FOR DETENTION TANKS IN CONJUNCTION WITH SITE APPLICATION # 220124577 NO CHANGE IN USE EGRESS OR OCCUPA... $100,000 ST. BARNABAS HOSPITAL
Apr 25, 2013 220126192 Alteration Type II SIGNED OFF REPLACE GAS PIPING FILED IN CONJUCTION WITH #210144921. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $66,000 ST. BARNABUS HOSPITAL
Mar 22, 2013 220052859 Alteration Type II SIGNED OFF MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER T... $6,000 ST. BARNABAS HOSPITAL
Mar 8, 2013 220128421 Alteration Type II SIGNED OFF THIS APPLICATION IS FILED TO REPLACE BURNERS FOR THREE EXISTING BOILERS 1,2 & 3. $0 ST. BARNABAS HOSPITAL
Mar 5, 2013 220170892 Alteration Type II SIGNED OFF FILING HEREWITH FOR PLUMBING WORK AS PER PLANS. SPECIFICALLY FILING A WATER METER AND A DOUBLE CHECK VALVE (SECONDARY... $3,000 ST. BARNABAS HOSPITAL