ECB violations
619 East 178 Street, Bronx • Block 03068 • Lot 0088
24 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Aug 1, 2026 | 39557391H | ACTIVE | CLASS - 1 | AT TIME OF INSPECTION, OBSERVED 12-STORY BUILDING. YODOCKS AT EXPOSURE 1 WERE NOT MAINTAINED PER MANUFACTURER SPECIFI... | $2,500 | $2,500 | Oct 16, 2026 |
| Aug 1, 2026 | 39557386N | ACTIVE | CLASS - 1 | AT TIME OF INSPECTION, OBSERVED 12-STORY BUILDING. STORAGE ZONE AT EXPOSURE 1 WAS NOT MAINTAINED. REQUIRED 4-FOOT BAR... | $5,000 | $5,000 | Oct 16, 2026 |
| Jul 28, 2026 | 39557174L | ACTIVE | CLASS - 2 | AT THE TIME OF INSPECTION OF A 12-STORY NB TOPPED OFF, ACTIVE SITE I OBSERVED AT EXP #1 THAT PLASTIC JERSEY BARRIERS ... | $1,250 | $1,250 | Oct 2, 2026 |
| Jun 30, 2026 | 39556002K | ACTIVE | CLASS - 2 | OBSERVED SIDEWALK SHED INSTALLED AT EXTERIOR OF JOBSITE EXPOSURE 1. THERE IS LARGE AMOUNT OF MATERIAL DEBRIS AND STOR... | $2,400 | $2,400 | Sep 4, 2026 |
| Jun 11, 2026 | 39555374R | ACTIVE | CLASS - 2 | 12 STORY NB ACTIVE SITE.WORK CONTRARY TO SITE SAFETY PLANS(SSP)/CODE, OBSERVED NO/MISSING OR INADEQUATE ROOF/MECHANIC... | $1,250 | $0 | Aug 21, 2026 |
| Jun 11, 2026 | 39555377M | ACTIVE | CLASS - 2 | 12 STORY NB ACTIVE SITE. OBSERVED LARGE PILES OF CONSTRUCTION DEBRIS AT MULTIPLE AREAS ONSITE PILED 12 FT HIGH X 15 F... | $2,500 | $0 | Aug 21, 2026 |
| Jun 11, 2026 | 39555376K | ACTIVE | CLASS - 2 | 12 STORY NB ACTIVE SITE. OBSERVED JOBSITE CONSTRUCTION FENCE /NOT MAINTAINED ENTIRE SECTIONS AT EXP#2 PERMIT#X0128422... | $1,000 | $0 | Aug 21, 2026 |
| Jun 11, 2026 | 39555375Z | ACTIVE | CLASS - 1 | 12 STORY NB ACTIVE SITE.CONTRARY TO SITE SAFETY PLANS(SSP)ADJOINING PROPERTY/RESIDENTIAL OCCUPIED BUILDING AT EXP#3.W... | $2,500 | $0 | Aug 21, 2026 |
| Jun 11, 2026 | 39555378Y | ACTIVE | CLASS - 2 | 12 STORY NB ACTIVE SITE. OBSERVED SIDEWALK SHED/OVERHEAD PROTECTION IN PLACE ON ADJOINING PROPERTY DRIVEWAY/CURB CUT ... | $2,500 | $0 | Aug 21, 2026 |
| Apr 22, 2026 | 39553332J | RESOLVE | CLASS - 2 | 12 STORY NB ACTIVE SITE.OBSERVED CONCRETE FORMWORK IN PLACE INSIDE SITE AGAINST ADJOINING PROPERTY AT EXP#4 APPROX 15... | $1,250 | $0 | Jul 17, 2026 |
| Apr 22, 2026 | 39553330X | RESOLVE | CLASS - 2 | 12 STORY NB ACTIVE SITE.OBSERVED REBAR IN PLACE AT EXP#2,3,4.EXTENDING 4 FT OVER FENCE OF ADJOINING PROPERTY EXP#2 RE... | $5,000 | $0 | Jul 17, 2026 |
| Apr 22, 2026 | 39553331H | RESOLVE | CLASS - 2 | 12 STORY NB ACTIVE SITE WORK CONTRARY TO SITE SAFETY PLANS/NYC DOT/FOUNDATION PHASE SSP-110.00.SHOW MATERIAL/EQUIPMEN... | $0 | $0 | Jul 17, 2026 |
| Jan 30, 2026 | 39549684L | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OF CLOSED SITE OBSERVED SIDEWALK AT EXP1 COVERED IN MORE THAN 1" OF ICE AND SNOW. APPROXIMATELY... | $1,250 | $0 | Apr 17, 2026 |
| Jan 30, 2026 | 39549820R | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OF CLOSED SITE OBSERVED SIDEWALK AT EXP1 COVERED IN MORE THAN 1" OF ICE AND SNOW. FULL WIDTH OF... | $1,250 | $0 | Apr 17, 2026 |
| Jan 30, 2026 | 39549822K | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OF CLOSED SITE OBSERVED SIDEWALK AT EXP1 COVERED IN MORE THAN 1" OF ICE AND SNOW. FULL WIDTH OF... | $1,250 | $0 | Apr 17, 2026 |
| Apr 1, 2021 | 35528913H | RESOLVE | CLASS - 1 | FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39016702Y ISSUED ON 2/1/2020 AND TO FI... | $12,500 | $0 | Oct 15, 2021 |
| Feb 10, 2021 | 35527204K | RESOLVE | CLASS - 1 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39016702Y ISSUED ON 02/01/20 & TO FILE A CERT OF CORREC... | $12,500 | $0 | Apr 30, 2021 |
| Dec 7, 2020 | 35523374P | RESOLVE | CLASS - 1 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39016702Y ISSUED ON 02/01/20 & TO FILE A CERT OF CORREC... | $12,500 | $0 | Feb 19, 2021 |
| Sep 25, 2020 | 35520638X | RESOLVE | CLASS - 1 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39016702Y ISSUED ON 02/01/20 & TO FILE A C OF C PURSUAN... | $6,250 | $0 | Dec 4, 2020 |
| Mar 27, 2020 | 35519135X | RESOLVE | CLASS - 1 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39016702Y ISSUED ON 02/01/20 & TO FILE A CERT OF CORREC... | $6,250 | $0 | Dec 4, 2020 |
| Feb 1, 2020 | 39016702Y | RESOLVE | CLASS - 1 | W/O A PERMIT. NOTED AT CELLAR LEVEL, FULL HT PARTITION WALLS ERECTED: 1. PLYWOOD WALL TO SUB-DIVIDE FLR RIGHT & LEFT;... | $6,250 | -$6,250 | Aug 21, 2020 |
| Feb 1, 2020 | 39016703X | RESOLVE | CLASS - 2 | RESIDENCE CONVERTED FROM 2 TO 3 FAMILIES. NOTED: AT CELLAR - LEVEL SUB-DIVIDED, LEFT & RIGHT: AT RIGHT CREATED & OCCU... | $5,000 | -$5,000 | Aug 21, 2020 |
| Sep 11, 2005 | 34424529K | RESOLVE | Hazardous | OCCUPANCY CONTRARY TO THAT ALLOWED BY BLDG. DEPT. RECORDS. BASEMENT BEEN CONVERTED FROM ORDINARY USE INTO A CLASS 'A'... | $800 | $0 | Feb 17, 2006 |
| Apr 17, 1991 | 34051386N | RESOLVE | Non-Hazardous | WORK WITHOUT A PERMIT. CREATED CURB CUT APPROX 7 FEET WIDE AT FRONT REMEDY: OBTAIN APPROVAL AND PERMIT FOR RESTORE BA... | $0 | $0 | Dec 27, 1991 |