Boston Road, Bronx
Bronx • Block 03120 • Lot 0020 • Zip: 10460
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 5 days ago- Times Square 52 min 11 walking, 41 riding
- Penn Station 53 min 11 walking, 42 riding
- Grand Central 55 min 11 walking, 44 riding
- Union Square 59 min 11 walking, 48 riding
- Fulton Street 63 min 11 walking, 52 riding
- Downtown Brooklyn 70 min 11 walking, 59 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Citi Bike
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
2025
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2024
-
DOB violation Sep 23, 2024
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-
Alteration Type II
SAWCUT CONCRETE AND EXCAVATE FOR REMOVAL OF EXISTING DIESEL AND GASOLINE UST SPILL CONTAINER. MAX EXCAVATION DEPTH 3'...
2023
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
2022
-
Demolition
-
Alteration Type II
IN MAINTENANCE BUILDING INSTALL NEW PLUMBING FIXTURES, REPLACE MECHANICAL SYSTEM WITH NEW AS PER PLANS FILED, NO CHAN...
2021
-
Alteration Type II
INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETENTION FIRE ALARM BUILDING B
-
Alteration Type III
INSTALL OF TEMP INFLATABLE SCREEN, NO ALTERATIONS TO EXIST STRUCTURES, FOR THE NYFF AT BRONX ZOO. A TUP IS REQUIRED. ...
-
Alteration Type II
IN EGAD FORMERLY THE GRAPHIC BUILDING, REPLACE EXISTING PLUMBING SYSTEM, MECHANCAL SYSTEM,AS PER FILED PLANS.
2020
2007
2006
-
Hazardous
FAILURE TO COMPLY WITH CERTIFICATE OF ON-SITE INSPECTION (NO 10E OR ON-SITE INSPECTION FOR CRANE CD, 3328 ERECTING ST...
2005
-
Non-Hazardous
FAILURE TO COMPLY WITH CERTIFICATE OF ON-SITE INSPECTION. (CRANE WORKING AT ABOVE. LOCATION WITH NO CERTIFICATE OF ON...
-
Hazardous
FAILURE TO COMPLY WITH THE CERTIFICATE OF ON SITE INSPECTION. NO PERMIT FOR CRANE AT TIME OF INSPECTION. (CN PERMIT)....
2002
-
Non-Hazardous
ALTERED BUILDING OCCUPANCY WITHOUT A VALID CERTIFICATE OF OCCUPANCY. ALT.#200525949. EXPIRED T.C.O. ON AUG.4,2001. RE...
2000
-
Non-Hazardous
ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY ALT#200525949 EXPIRED AUGUST 26,2000. REMEDY: OBTA...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records