2013 Vyse Avenue, Bronx
Bronx • Block 03127 • Lot 0023 • Zip: 10460
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 38 min 4 walking, 34 riding
- Times Square 40 min 4 walking, 36 riding
- Penn Station 41 min 4 walking, 37 riding
- Union Square 42 min 4 walking, 38 riding
- Fulton Street 48 min 4 walking, 44 riding
- Downtown Brooklyn 57 min 4 walking, 53 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
CLASS - 2
FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION I OBSERVED EXP #1 EAST (1)CRA...
2025
-
HPD violation Nov 10, 2025
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Nov 10, 2025
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ASSEMBLY AT VESTIBULE DOOR TO 1ST STORY P...
-
HPD violation Jul 28, 2025
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT EAST WALL...
-
HPD violation Jul 28, 2025
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AT PUBLIC HALL, 1s...
-
HPD violation Jul 28, 2025
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AT VESTIBULE , 1st...
-
HPD violation May 20, 2025
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ASSEMBLIES AT 1ST FIRE DOOR FROM NORTH LE...
2024
-
CLASS - 1
FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE DOCUMEN...
2021
-
DOB violation Nov 24, 2021
C-CONSTRUCTION OTHER OPTIONAL
VERTICAL BRICK CRACKS AT EXP#1 NORTH/WEST CORNR 1ST FLOOR TO 3RD FLOOR. VERTICAL BRICK CRACKS AT EXP#3 SOUTH/EAST COR...
-
New Building
STRUCTURAL DRAWINGS FOR PROPOSED 7 STORY APARTMENT BUILDING.
-
CLASS - 2
ATOI- MISSING MANUAL RESET LOW WATER CUT OFF FGC-631.1-/ASME CSD-1 , LOCKING CLIPS MISSING ON CENTROTHERM FLUE AS REQ...
-
Alteration Type III
BUILDERS PAVEMENT PLAN 50.01 FEET FILING IN CONJUNCTION WITH NB APPLICATION#: 220550062
2020
-
Alteration Type II
INSTALL AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM.
-
Alteration Type III
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33...
-
Alteration Type III
INSTALLATION OF NEEDLE BEAMS AS PER PLANS. ALL WORK SHALL BE ACCORDING TO CHAPTER #33 OF THE 2014 NYC BUILDING CODE. ...
2019
-
DOB violation Aug 7, 2019
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Aug 7, 2019
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Aug 7, 2019
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Aug 7, 2019
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 1
FAILURE TO PROVIDE OSHA TRAINING @TIME OF INSPECTION OF NEW 7 STY BUILDING ACTIVE JOBSITE BUILDING TOPPED OFF WITH 2 ...
-
CLASS - 1
FAILURE TO PROVIDE OSHA TRAINING @TIME OF INSPECTION OF NEW 7 STY BUILDING ACTIVE JOBSITE BUILDING TOPPED OFF WITH 2 ...
-
CLASS - 1
BC 3301.3.12 COMPETENT PERSON @TIME OF INSPECTION OF NEW 7 STY BUILDING ACTIVE JOBSITE WORK IN PROGRESS (2 WORKERS) B...
2018
-
DOB violation Mar 7, 2018
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2017
-
Alteration Type III
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33...
2016
2010
2008
2007
2005
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records