Skip to content

DOB violations

2075 Creston Avenue, Bronx • Block 03169 • Lot 0053

8 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Feb 18, 2026 FEU20502BP C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE FTM RETAINING WALL-@EXP3 FO THE BLDG THE RUBBLE STONE R/WSHARED W/ 2078 MORRIS AVE &2084 MORRIS AVE IN A STATE OF DIS...
Feb 14, 2026 LL0503NI C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. RETAINING WALL ALL ALONG STRUCTURE CRACKING & LOOSE STONES. RE...
Feb 14, 2026 LL0503NI C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE FTM BLDG IN CODE COMPLIANT MANNER. OBSERVED RETAINING WALL ALONG EXP3W EXHIBITS DEFECTIVE CONDITIONS INCLUDING BULGED...
Feb 14, 2026 RW0503NI C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE FTM BLDG IN CODE COMPLIANT MANNER. OBSERVED RETAINING WALL ALONG EXP3W EXHIBITS DEFECTIVE CONDITIONS INCLUDING BULGED...
Dec 1, 2023 2300800 EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE V*-DOB VIOLATION - DISMISSED FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 Feb 6, 2024
Oct 1, 2019 00261 RWNRF-RETAINING WALL NONE V*-DOB VIOLATION - DISMISSED FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 Mar 23, 2026
Mar 25, 2015 00075 AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE V*-DOB VIOLATION - DISMISSED FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION Aug 24, 2015
Jan 1, 2009 06851 LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED V*-DOB VIOLATION - DISMISSED Mar 16, 2016