DOB violations
2065 Walton Avenue, Bronx • Block 03179 • Lot 0060
16 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Dec 1, 2024 | 2400793 | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 | — |
| Sep 23, 2024 | 07188 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | — |
| Sep 23, 2024 | 07187 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | — |
| Aug 2, 2022 | 01647 | BENCH-FAILURE TO BENCHMARK NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Sep 30, 2022 |
| Feb 22, 2022 | 02134 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | — |
| Jan 19, 2022 | 00216 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | Mar 24, 2022 |
| Dec 1, 2021 | 2101689 | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 | Feb 25, 2023 |
| Jun 20, 2021 | 00535 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020) | Jun 21, 2021 |
| Apr 29, 2021 | 2002291 | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 | Feb 25, 2023 |
| Jun 29, 2020 | 10312 | EARCX-FAILURE TO SUBMIT EER NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2019 | Jun 21, 2021 |
| Sep 7, 2017 | BS05AD02 | C-CONSTRUCTION OTHER OPTIONAL | VP*-VIOLATION UNSERVED ECB- DISMISSED | — | Sep 19, 2017 |
| Jul 10, 2017 | BS05JM03 | C-CONSTRUCTION OTHER OPTIONAL | VP*-VIOLATION UNSERVED ECB- DISMISSED | — | Jul 14, 2017 |
| Jul 10, 2017 | BS05JM02 | C-CONSTRUCTION OTHER OPTIONAL | VP*-VIOLATION UNSERVED ECB- DISMISSED | — | Jul 14, 2017 |
| May 2, 2017 | 00479 | BENCH-FAILURE TO BENCHMARK NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Jun 16, 2017 |
| Feb 15, 2017 | CEU0501NH | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | ADDITIONAL INFO: DETAILS OF MOMENT CONNECTION AT THE 3RD FLOOR DO NOT COMPLY WITHTHE DETAILS ON THE CONSTRUCTION DOCU... | Apr 21, 2017 |
| Jul 11, 2016 | BS05TW09 | C-CONSTRUCTION OTHER OPTIONAL | VP*-VIOLATION UNSERVED ECB- DISMISSED | — | Jul 12, 2016 |