Goulden Avenue, Bronx
Bronx • Block 03247 • Lot 0001 • Zip: 10468
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 44 min 10 walking, 34 riding
- Union Square 48 min 10 walking, 38 riding
- Times Square 51 min 10 walking, 41 riding
- Fulton Street 54 min 10 walking, 44 riding
- Penn Station 56 min 10 walking, 46 riding
- Downtown Brooklyn 62 min 10 walking, 52 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
Alteration
Chief Plan Examiner/ Assistant Chief Plan Examiner Review
2025
-
CLASS - 1
AT A CONSTRUCTION SITE WHERE A WORKER FELL APPROXIMATELY 15 FEET WHILE WALKING ON A GRID. FAILED TO SUBMIT REPORT WIT...
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
CLASS - 2
RESPONDED TO AN INCIDENT WHERE A WORKER FELL APPROX.15 FEET WHILE WALKING ON A GRID. INSPECTION REVEALED THAT THE WAL...
-
Alteration Type II
FILING FOR SPRINKLER SYSTEM MODIFICATION AS PER PLANS HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY
-
Alteration Type II
MODIFICATION TO NONBEARING PARTITIONS, FLOORS, ETC. WITHIN LEHMAN LIBRARY AS PER PLANS. NO CHANGE IN USE EGRESS OR OC...
-
Alteration Type II
SUBSEQUENT SPRINKLER WORK TYPE. ALL AS PER PLANS FILED HEREWITH.
-
New Building
FILING SUBSEQUENT APPLICATION FOR THE SOE STRUCTURAL WORK, ALL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS ...
-
Alteration Type III
HEREWITH FILING FOR BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NEW BUILDING.
2024
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
2022
-
CLASS - 1
NOTE: AT THE TIME OF INSPECTION AS PER SUPERINTENDENT, WORKER PINCHED HIS HAND WHEN PULLING FORK LIFT HOPPER WITH FUL...
-
CLASS - 1
DOCUMENTS TO BE ONSIGHT-ENGINEER DESIGN DRAWINGS MATERIAL HOIST AT TIME OF INSPECTION ON AN 4 STORY UNDER PERMIT NB#2...
-
CLASS - 2
DOCUMENTS TO BE ONSIGHT-ENGINEER DESIGNED DRAWINGS-TEMPORARY PLATFORM AT TIME OF INSPECTION ON AN ACTIVE 4 STORY JOBS...
-
CLASS - 1
BC 3303.11 STAIRS DURING CONSTRUCTION OR DEMOLITION NOTE:AT TIME OF INSPECTION AT NEW 4 STORY BUILDING ACTIVE JOBSITE...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records