163 West 195 Street, Bronx
Bronx • Block 03249 • Lot 0181 • Zip: 10468
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 5 days ago- Grand Central 44 min 10 walking, 34 riding
- Union Square 48 min 10 walking, 38 riding
- Times Square 51 min 10 walking, 41 riding
- Fulton Street 54 min 10 walking, 44 riding
- Penn Station 56 min 10 walking, 46 riding
- Downtown Brooklyn 62 min 10 walking, 52 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation May 8, 2026
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2025
-
HPD violation Nov 18, 2025
Class I
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27...
-
HPD violation Jun 13, 2025
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2024
-
HPD violation Aug 28, 2024
Class C
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd ...
-
HPD violation Aug 28, 2024
Class C
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STO...
-
HPD violation Aug 28, 2024
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOC...
2012
-
CLASS - 2
WORK W/O PERMITS. NOTED: TEMPORARY WOOD WALL ERECTED AND BRACED ALONGSIDE OF COLLAPSED RETAINING WALL W/O REQUIRED DO...
-
DOB violation Jul 11, 2012
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
Alteration Type III
TEMPORARY SHORING TO COLLAPSING RETAINING WALL AT REAR, AS SHOWN ON PLANS. NO CHANGES TO USES, EGRESS OR OCCUPANCY. H...
-
DOB violation Apr 26, 2012
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
-
DOB violation Apr 26, 2012
C-CONSTRUCTION OTHER OPTIONAL
-
CLASS - 1
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER IN THAT THERE IS A CONCRETE BLOCK RETAINING WALL APPROX 20' HIGH X ...
2007
-
New Building
2006
-
Non-Hazardous
WORK DOES NOT CONFORM TO APPROVED PLANS. NON-CONFORMING WORK NOTED BUTNOT LIMITED TO: REAR EXTERIOR WALL AND ENTRY/EX...
-
DOB violation Mar 2, 2006
C-CONSTRUCTION OTHER OPTIONAL
2005
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records