Job filings
Fordham Prep High School, Bronx • Block 03273 • Lot 0150
39 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Mar 22, 2023 | 220604594 | Alteration Type II | SIGNED OFF | MODIFICATION OF EXISTING FIRE ALARM FOR THE CELLAR LEVEL FOR ADDITIONS.. | $20,000 | FORDHAM PREPARATORY SCHOOL |
| May 18, 2022 | 220447595 | Alteration Type II | SIGNED OFF | APPLICATION FILED FOR REPLACEMENT OF DUCTWORK AND CONNECTIONS TO HVAC SYSTEM FOR THE LOBBY AND COMMONS AREA. NO CHANG... | $325,000 | FORDHAM PREPARATORY SCHOOL |
| Apr 22, 2022 | 220604656 | Alteration Type II | SIGNED OFF | MECHANICAL AND PLUMBING WORK IN CONNECTION WITH EXTENSION OF THE EAST WING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $689,000 | FORDHAM PREPARATORY SCHOOL |
| Mar 17, 2022 | 220604638 | Alteration Type II | SIGNED OFF | MODIFICATION OF EXISTING FIRE ALARM SYSTEM, INSTALLATION TO ADDITIONAL DEVICES. NO CHANGE TO USE EGRESS OR OCCUPANCY. | $10,000 | FORDHAM PREPARATORY SCHOOL |
| Jan 4, 2022 | 240279391 | Alteration Type III | SIGNED OFF | THIS APPLICATION IS FILED FOR THE INSTALLATION OF NON-ENCLOSED TEMPORARY TENT FOR FORDHAM PREP GRADUATION EVENT. THE ... | $10,480 | FORDHAM PREPARATORY SCHOOL |
| Mar 31, 2021 | 220685961 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | MODIFICATION OF THE EXISTING FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $150,000 | FORDHAM PREPARATORY SCHOOL |
| Jan 13, 2021 | 220604665 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | HORIZONTAL EXTENSION OF THE BUILDING TO ACCOMMODATE FOR ADDITIONAL OFFICE AND CLASSROOMS SPACE ON 1,2,AND 3 FLOORS. N... | $1,000,000 | FORDHAM PREPARATORY SCHOOL |
| Oct 3, 2019 | 240251954 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY SHORING AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN US... | $16,254 | COLGATE ENTERPRISE CORP |
| May 24, 2019 | 220602836 | Alteration Type II | SIGNED OFF | — | $184,261 | FORDHAM PREPARATORY SCHOOL |
| May 13, 2019 | 220604674 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF SPRINKLER HEADS IN CONNECTION WITH EAST WING EXTENSION AND RENOVATION. NO CHANGE IN USE, EGRESS, OR O... | $237,000 | FORDHAM PREPARATORY SCHOOL |
| Feb 15, 2019 | 220664984 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | REPLACE EXISTING FIRE SPRINKLER BOOSTER PUMP WITH NEW IN KIND. NO CHANGE TO USE EGRESS OR OCCUPANCY. | $30,000 | FORDHAM PREPARATORY SCHOOL |
| Nov 20, 2018 | 220456897 | Alteration Type II | SIGNED OFF | PARTITION WORK ON 3RD FLOOR LIBRARY AS PART OF THE EAST WING RENOVATION TO CONVERT STUDY AREA. NO CHANGE IN USE EGRES... | $362,647 | FORDHAM PREPARATORY SCHOOL |
| Aug 7, 2018 | 220459732 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF NEW SPRINKLER SYSTEM AND FLOOR CONTROL VALVES ON EXISTING SERVICE. NO CHANGE IN USE EGRESS OR OCCUPANCY | $160,000 | FORDHAM PREPARATORY SCHOOL |
| Jul 10, 2018 | 220604610 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | MECHANICAL WORK ON THE CELLAR AND FIRST FLOOR LOCKER ROOM. NO CHANGE TO USE EGRESS OR OCCUPANCY. | $222,000 | FORDHAM PREPARATORY SCHOOL |
| Jul 6, 2018 | 220604576 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | RENOVATION OF THE CELLAR LOCKER ROOMS. NO CHANGE IN USE EGRESS OR OCCUPANCY | $63,569 | FORDHAM PREPARATORY SCHOOL |
| Jun 8, 2018 | 220447425 | Place of Assembly | COMPLETED | — | $0 | FORDHAM PREPARATORY SCHOOL |
| Jul 28, 2017 | 220604585 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM 3RD FLOOR TO CONNECT ADDITIONS. | $20,000 | FORDHAM PREPARATORY SCHOOL |
| Jul 18, 2017 | 220604683 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF NEW SPRINKLER HEADS IN RENOVATION OF THE 3RD FLOOR EAST WING. NO CHANGE IN USE EGRESS OR OCCUPANCY | $60,000 | FORDHAM PREPARATORY SCHOOL |
| Jul 11, 2017 | 220604567 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | PLUMBING & MECHANICAL WORK ON 3RD FLOOR LIBRARY AS PART OF THE EAST WING RENOVATION TO CONVERT STUDY AREA. NO CHA... | $68,420 | FORDHAM PREPARATORY SCHOOL |
| Jul 3, 2017 | 220604718 | Alteration Type II | PLAN EXAM - DISAPPROVED | MODIFICATION OF EXISTING FIRE ALARM FOR THE CELLAR LEVEL FOR ADDITIONS.. | $20,000 | FORDHAM PREPARATORY SCHOOL |
| Jul 3, 2017 | 220604727 | Alteration Type II | PLAN EXAM - DISAPPROVED | MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM 3RD FLOOR TO CONNECT ADDITIONS. | $20,000 | FORDHAM PREPARATORY SCHOOL |
| Jun 30, 2017 | 240189185 | Alteration Type II | PLAN EXAM - IN PROCESS | RENOVATION OF THE CELLAR LOCKER ROOMS. NO CHANGE IN USE EGRESS OR OCCUPANCY | $63,569 | FORDHAM PREPARATORY SCHOOL |
| Nov 17, 2016 | 220456904 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER DRAWINGS. | $354,050 | FORDHAM PREPARATORY SCHOOL |
| Nov 1, 2016 | 220447416 | Alteration Type II | SIGNED OFF | RENOVATION CONSISTING OF ENLARGEMENT AND RENOVATIONS OF LOBBY AREA. NO CHANGE IN USE,EGRESS OR OCCUPANCY. | $365,000 | FORDHAM PREPARATORY SCHOOL |
| Jan 27, 2016 | 220447602 | Alteration Type II | SIGNED OFF | — | $160,000 | FORDHAM PREPARATORY SCHOOL |
| Jul 29, 2015 | 220447586 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | MODIFICATION TO CONNECT THE CELLAR AND FIRST FLOORS ON TO EXISTING FIRE ALARM SYSTEM. | $20,000 | FORDHAM PREPARATORY SCHOOL |
| Feb 4, 2013 | 220115676 | Alteration Type II | SIGNED OFF | FILING HEREWITH THE REMOVAL OF EXISTING OIL STEAM BOILERS AND REPLACE WITH NEW DUAL FUEL (NATURAL GAS AND FUEL OIL) H... | $270,000 | FORDHAM PREPARATORY SCHOOL |
| Jan 8, 2010 | 210043228 | Alteration Type I | SIGNED OFF | HEREWITH FILING FOR PLUMBING WORK AS INDICATED ON PLANS. | $0 | FORDHAM PREPARATORY SCHOOL |
| Oct 21, 2009 | 210069548 | Alteration Type III | SIGNED OFF | — | $0 | COLGATE SCAFFOLD & EQUIPMENT |
| Oct 15, 2009 | 210050772 | Alteration Type II | SIGNED OFF | EXTENSION OF EXISTING INTERIOR FIRE ALARM SYSTEM AS PER ATTACHED PLANS AND APPLICATIONS. INSTALLATION OF SUPPLEMENTAL... | $30,000 | FORDHAM PREPATORY SCHOOL |
| Sep 30, 2009 | 210047180 | Alteration Type II | SIGNED OFF | HEREWITH FILING FOR THE MODIFICATION OF THE EXISTING STANDPIPE SYSTEM AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS... | $20,000 | FORDHAM PREPATORY SCHOOL |
| Sep 21, 2009 | 210076656 | Alteration Type III | SIGNED OFF | — | $0 | COLGATE SCAFFOLD & EQUIPMENT |
| Sep 16, 2009 | 220005777 | Alteration Type III | SIGNED OFF | INSTALLATION OF LIGHT DUTY SIDEWALK SHED AS PER PLANS SUBMITTED HEREWITH. SHED SHALL COMPLY WITH LL 33/91, TPPN 9/199... | $0 | COLGATE SCAFFOLD & EQUIPMENT |
| Sep 16, 2009 | 220008364 | Alteration Type III | SIGNED OFF | INSTALL 25 LF OF SCAFFOLDING FOR INTERIOR WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY GROUP OR ... | $0 | COLGATE SCAFFOLD & EQUIPMENT |
| Sep 3, 2009 | 210069922 | Alteration Type III | SIGNED OFF | INSTALLATION OF 93 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED AS PER PLANS SUBMITTED HEREWITH. SIDEWALK SHED SHALL COMPL... | $0 | COLGATE SCAFFOLD & EQUIPMENT |
| Aug 21, 2009 | 200654005 | Alteration Type II | SIGNED OFF | EXTERIOR FACADE REPIAR AND STRUCTURAL SL AB REMOVAL AND REPLACEMENT AS P R THE ATTACHED PLANS.NO CHANGE IN USE,EG RES... | $15,000 | FORDHAM UNIVERSITY |
| Aug 3, 2009 | 210114053 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY SCAFFOLDING | $0 | FORDHAM PREPATORY SCHOOL |
| Feb 11, 2009 | 200931572 | Alteration Type II | SIGNED OFF | HEREWITH FILING FOR THE RECONSTRUCTION OF THE FORDHAM PREPARATORY ATHLETIC FIELD. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $60,000 | FORDHAM ROAD |
| Feb 20, 2002 | 200683625 | Alteration Type II | SIGNED OFF | MODIFICATION TO EXISTING PARTITIONS INDI CATED ON PLANS.NO CHANGE IN USE EGRESS OR OCCUPANCY. | $15,000 | FORDHAM PREP SCHOOL |