2975 Decatur Avenue, Bronx
Bronx • Block 03285 • Lot 0041 • Zip: 10458
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 5 days ago- Times Square 48 min 3 walking, 45 riding
- Grand Central 51 min 3 walking, 48 riding
- Penn Station 51 min 3 walking, 48 riding
- Union Square 55 min 3 walking, 52 riding
- Fulton Street 61 min 3 walking, 58 riding
- Downtown Brooklyn 65 min 3 walking, 62 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Activity
Sales, filings, permits and violations from every dataset, in one order.
2024
2023
-
HPD violation Mar 16, 2023
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2022
-
DOB violation Feb 22, 2022
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
2021
-
HPD violation Apr 2, 2021
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
-
HPD violation Jan 29, 2021
Class C
§ 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA...
-
HPD violation Jan 22, 2021
Class C
§ 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA...
-
HPD violation Jan 22, 2021
Class C
§ 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA...
-
HPD violation Jan 22, 2021
Class C
§ 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA...
2020
-
DOB violation Feb 14, 2020
E-ELEVATOR ELEVATORREQUIRED
2019
-
DOB violation May 2, 2019
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-
DOB violation Feb 5, 2019
E-ELEVATOR ELEVATORREQUIRED
2018
-
DOB violation May 31, 2018
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
-
CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE 8TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APP...
-
Alteration Type III
WINDOW LINTELS NEEDS TO BE REPLACED IN TWO SIDES AND IN REAR OF THE BUILDING. NO CHANGE IN USE OR EGRESS UNDER THIS A...
-
DOB violation Feb 6, 2018
E-ELEVATOR ELEVATORREQUIRED
2017
2002
-
Hazardous
FAILURE TO FILE AN AMENDED ROUND FIVE REPROT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y 32-03B(5), INDICA...
-
Hazardous
FAILURE TO FIEL AN AMANDED ROUND FIVE REPORT ACCEPTABLE TO THIS DEPARTMENT PURSUANT TO RULE R.C.N.Y. 32-03B(5), INDIC...
-
Alteration Type III
INSTALLATION OF HEAVY DUTY SIDEWALK BRID GE, 80', DURING FACADE REPAIR. SHED TO COMPLY WITH LL33/91.
1998
1996
1992
-
Non-Hazardous
14B,35R,54T,40T, #(35) REMOVE T.V. EQUIPMENT FROM MOTOR ROOM. (#54) POST NAME OF MAINTENANCE COMPANY #(40) CONDUCT 5 ...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records