DOB violations
240 East 194 Street, Bronx • Block 03293 • Lot 0135
7 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Apr 6, 2018 | 05245 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Jul 26, 2019 |
| Feb 9, 2018 | FEU20701BS | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | FTM DUE TO 4 ALARM FIRE.PREM IS 5 STRY+BSMT+PART CELLAR,WOOD JOIST& MASONRY BEARING WALL MIX USE BLDG.BLDG SUFFERED F... | — |
| Feb 1, 2018 | FEU20701BS | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | EMERG WRK.DUE TO 4 ALARM FIRE ON 1/31/18 THE BLDG SUFFERED FIRE DAMAGE AT NORTH WING+CENTER OF BLDG COCKLOFT ROOF FRA... | — |
| Jan 31, 2018 | CER02EP | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | DUE TO FIRE | — |
| May 2, 2017 | 00498 | BENCH-FAILURE TO BENCHMARK NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Nov 16, 2017 |
| Feb 24, 2017 | 03842 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | May 2, 2017 |
| Jan 29, 2015 | CN0704MB | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Jun 22, 2018 |