Maintenance code violations
Valentine Avenue, Bronx • Block 03300 • Lot 0044
391 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Dec 3, 2012 | B | VIOLATION DISMISSED | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM AT LEAST 1 WINDOW OR P... | 2 | Jan 7, 2013 |
| Nov 23, 2012 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN TH... | 31 | Dec 28, 2012 |
| Nov 23, 2012 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NO... | 31 | Feb 26, 2013 |
| Nov 23, 2012 | A | VIOLATION DISMISSED | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE KITCH... | 31 | Feb 26, 2013 |
| Nov 23, 2012 | A | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE KNOB AND LOCK ASSEMBLY AT THE DOOR IN THE ENTRANCE LOCATED AT APT 31, 3r... | 31 | Feb 26, 2013 |
| Nov 23, 2012 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 31 | Jan 2, 2013 |
| Nov 23, 2012 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 31 | Dec 14, 2012 |
| Nov 23, 2012 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR AT THE ENTRANCE IN THE 4th ROOM FROM EAST AT NORTH L... | 31 | Dec 28, 2012 |
| Nov 23, 2012 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE, LOWER SASH IN THE 3rd ROOM FROM EAST AT NO... | 31 | Dec 28, 2012 |
| Nov 23, 2012 | A | VIOLATION DISMISSED | § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOC... | 31 | Feb 26, 2013 |
| Nov 23, 2012 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 31 | Dec 14, 2012 |
| Nov 23, 2012 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE. LOWER SASH IN THE KITCHEN LOCATED AT APT 3... | 31 | Dec 28, 2012 |
| Nov 23, 2012 | B | VIOLATION DISMISSED | § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS LOCATED AT APT 31, 3rd STORY, 1st APARTMENT FROM SOUT... | 31 | Dec 28, 2012 |
| Nov 23, 2012 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 31 | Dec 28, 2012 |
| Nov 23, 2012 | A | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 31 | Feb 26, 2013 |
| Nov 23, 2012 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN T... | 31 | Dec 28, 2012 |
| Nov 23, 2012 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN TH... | 31 | Dec 28, 2012 |
| Oct 3, 2012 | B | VIOLATION CLOSED | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTE PIPE UNDER SINK IN THE KITCHEN LOCATED AT APT 2... | 2 | Nov 7, 2012 |
| Oct 3, 2012 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOC... | 2 | Nov 7, 2012 |
| Oct 3, 2012 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE EN... | 2 | Nov 7, 2012 |
| Oct 3, 2012 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS IN THE ENT... | 2 | Nov 7, 2012 |
| Oct 3, 2012 | A | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LO... | 2 | Jan 6, 2013 |
| Oct 3, 2012 | C | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 2 | Oct 9, 2012 |
| Sep 19, 2011 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE BA... | 21 | Oct 24, 2011 |
| Sep 19, 2011 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AT ENTRANCE DOOR TO BLDG , 1st STORY | — | Sep 25, 2011 |
| Apr 19, 2011 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 22 | Jun 12, 2011 |
| Mar 4, 2011 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ... | 21 | Mar 10, 2011 |
| Mar 25, 2010 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AT CLOSET I... | 43 | Apr 29, 2010 |
| Sep 18, 2009 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 3 | Dec 22, 2009 |
| Sep 18, 2009 | A | VIOLATION CLOSED | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR IN THE BATHROOM LOCATED AT APT 3, 1st STORY, 1st APA... | 3 | Dec 22, 2009 |
| Apr 30, 2008 | B | VIOLATION CLOSED | § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS ;; IN THE ENTRANCE LOCATED AT APT 1, 1st STO... | 1 | Jun 4, 2008 |
| Oct 11, 2007 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR .. NORTH WALL, WEST... | 3 | Nov 15, 2007 |
| Aug 3, 2007 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 3 | Nov 6, 2007 |
| Aug 3, 2007 | B | VIOLATION CLOSED | § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN , ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 1st ST... | 3 | Sep 7, 2007 |
| Aug 3, 2007 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING WOOD FLOOR IN THE 3rd ROOM F... | 3 | Sep 7, 2007 |
| Jun 8, 2005 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALL AND CEILIN... | B1 | Jul 18, 2005 |
| Jul 17, 2000 | B | VIOLATION CLOSED | D26-10.01, 10.05 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM WINDOW TO FIRE ESCAPE... | 23 | Aug 26, 2000 |
| Jul 17, 2000 | B | VIOLATION CLOSED | D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEILING IN BOILER ROOM. | — | Aug 26, 2000 |
| Jul 17, 2000 | A | VIOLATION CLOSED | D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING BOILER ROOM CELLAR. | — | Oct 25, 2000 |
| Jul 17, 2000 | A | VIOLATION CLOSED | D26-16.03 ADM CODE REPAIR THE BROKEN OR DEFECTIVE GUTTER WALL & CLGS AT BOILER ROOM CELLAR. | — | Oct 25, 2000 |
| Jul 17, 2000 | B | VIOLATION CLOSED | D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEILINGS IN CELLAR THROUGHOUT. | — | Aug 26, 2000 |