2833 Briggs Avenue, Bronx
Bronx • Block 03301 • Lot 0063 • Zip: 10458
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Times Square 39 min 2 walking, 37 riding
- Grand Central 41 min 2 walking, 39 riding
- Penn Station 42 min 2 walking, 40 riding
- Union Square 45 min 2 walking, 43 riding
- Fulton Street 51 min 2 walking, 49 riding
- Downtown Brooklyn 56 min 2 walking, 54 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation May 1, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE 4 WINDOW WOODEN FRAME FROM SOUTH AT ...
2025
-
HPD violation Aug 28, 2025
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, ...
-
HPD violation Aug 28, 2025
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ...
-
HPD violation Aug 28, 2025
Class B
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE THE CEILING IN THE BATHR...
-
HPD violation Aug 28, 2025
Class B
§ 27-2053 ADM CODE PROVIDE DWELLING WITH A JANITOR OR RESPONSIBLE PERSON OR JANITORIAL SERVICE.
-
HPD violation Mar 11, 2025
Class B
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED A...
-
CLASS - 2
1RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103...
2022
-
DOB violation Dec 15, 2022
RWNRF-RETAINING WALL NONE
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
2021
2019
-
DOB violation Oct 30, 2019
C-CONSTRUCTION OTHER OPTIONAL
FTM:APT 2F WAS INSPECT ON 9-6-19 BY ERT AND RE-INSPECT ON 10-25-19 IT WAS DISCOVERED THAT APT 2F WAS BEING RENOVATED ...
-
CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35442449X ISSUED ON 09-04-19 & TO FILE A C OF C PURSUAN...
-
CLASS - 1
PLUMBING REPLACED IN APARTMENT 1B. NEW WASTE LINES. WORK IS 100 PERCENT COMPLETE NEW WASTE PIPING VISIBLE FROM 2FRONT...
-
CLASS - 2
FAILURE TO PROPERLY SECURE SUPPORT ELECTRICAL METALIC TUBING.LIGHTING RACEWAY IN REAR OF BUILDING NOT PROPERLY SECURE...
-
CLASS - 1
ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED AT 1345PM FIXTURES SWITCHES OUTLETS INSTALLED IN APARTMENT 1B.NO ELECTRICA...
-
CLASS - 1
IN APARTMENT 2FRONT BATHTUB KITCHEN SINK AND TOILET CLOGGED AND NOT DRAINING. PLUMBING FIXTURES INCLUDING BATHTUB, TO...
2018
2004
-
Alteration Type II
BOILER AND BURNER REPLACEMENT. NO CHANGE IN USE EGRESS OR OCCU- PANCY.
2002
-
DOB violation Mar 26, 2002
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1995
-
DOB violation Aug 29, 1995
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1993
-
DOB violation May 17, 1993
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records