Skip to content

ECB violations

3180 Villa Avenue, Bronx • Block 03311 • Lot 0037

13 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
May 14, 2026 39188568N RESOLVE CLASS - 2 WINDOW OPENING AT EXPOSURE# 2 AND 4 OBSERVED DO NOT CONFORM TO DOB APPROVED PLANS PROVIDED ON TIME OF INSPECTION., CO... $0 $0 Aug 7, 2026
May 1, 2026 39553742M RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OBSERVED ACTIVE SITE SWS REMOVAL @ EXP. 1, UPON REQUEST SITE FAILED TO PROVIDE SWS SIGNO... $5,000 $5,000 Jan 26, 2027
May 1, 2026 39553743Y RESOLVE CLASS - 1 AT THE TIME OF INSPECTION OBSERVED ACTIVE SITE FAILED TO PROVIDE INGRESS/EGRESS ACCESS FOR ACTIVE WORKERS, INSPECTORS... $5,000 $5,000 Jan 26, 2027
Apr 24, 2026 39553437X RESOLVE CLASS - 2 AT THE TIME OF INSPECTION ACTIVE JOBSITE I OBSERVED FENCE CONSTRUCTED LOCATED AT EXPOSURE#3 NOT MAINTAINED AS PER COD... $1,000 $1,000 Jan 22, 2027
Feb 14, 2026 39550376H RESOLVE CLASS - 2 DURING MY INSPECTION OF A CLOSED EIGHT-STORY NEW BUILDING, I OBSERVED THE JOB SITE FENCE IN-PLACE PERMIT EXPIRED 12 3... $0 $0 May 1, 2026
Dec 29, 2025 39548577L RESOLVE CLASS - 2 OBSERVED SIDEWALK SHED AT EXPOSURE #1 NOT EXTENDED MINIMUM 5 FT TO PROVIDE REQUIRED PEDESTRIAN OVERHEAD PROTECTION, C... $2,400 $2,400 Jan 15, 2027
Dec 29, 2025 39548578N RESOLVE CLASS - 2 OBSERVED PLASTIC YODOCK BARRIERS NOT MAINTAINED PER MANUFACTURER SPECIFICATIONS; BARRIERS IMPROPERLY SECURED AND INAD... $0 $0 Mar 6, 2026
Nov 7, 2025 39166213R RESOLVE CLASS - 2 NO EN DRAWING APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., MAINTAIN/DISPLAY REQUIRED DOCUME... $1,280 $0 Jan 16, 2026
Sep 7, 2025 39544531H RESOLVE CLASS - 2 3304.4.5- OBSERVED EXCAVATOR PARK ON DISTURBED SOIL OF SOE JOBSITE. SOIL HAS BEEN EXCAVATED AND EXPOSED TO RAIN WATER... $2,500 $2,500 Oct 8, 2026
Sep 7, 2025 39544532J RESOLVE CLASS - 2 OBSERVED CONSTRUCTION FENCE @ EXPOSURE 4 OF JOBSITE. FENCE IS LEANING TOWARDS ADJACENT PROPERTY YARD AND IS SUPPORTED... $1,000 $1,000 Oct 8, 2026
Jul 29, 2025 39542961Z RESOLVE CLASS - 2 AT TIME OF INSPECTION OBSERVED EXCAVATION/FOUNDATION ACTIVITIES. NO UNDERPINNING DONE AS PER DRAWINGS UPON REQUESTING... $3,125 $3,125 Oct 13, 2026
Jul 29, 2025 39542960R RESOLVE CLASS - 1 AT TIME OF INSPECTION OBSERVED SITE CURRENTLY ON EXCAVATION/FOUNDATION PHASE. UPON REVIEWING SOE DRAWINGS NOTICE NO S... $6,250 $6,250 Oct 13, 2026
Jul 29, 2025 39542964Y RESOLVE CLASS - 2 AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION ACTIVITIES. AT EXP. 1 OBSERVED VIEWING PANEL BLOCKED CONTRARY TO B... $1,000 $1,000 May 5, 2026