ECB violations
2702 Creston Avenue, Bronx • Block 03314 • Lot 0032
34 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jul 30, 2026 | 39557271N | ACTIVE | CLASS - 2 | AT THE TIME OF INSPECTION OF A 12-STORY NEW BUILDING, I OBSERVED SIDEWALK SHED IN PLACE EXPOSURE#1, I OBSERVED THE SI... | $1,250 | $1,250 | Oct 16, 2026 |
| Apr 28, 2026 | 39553531M | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION, 12-STORY BUILDING WITH SIDEWALK SHED AT EXPOSURE 1 UNDER ACTIVE PERMIT. SITE CLOSED. SIDEWALK ... | $2,400 | $2,400 | Jul 17, 2026 |
| Feb 19, 2026 | 39550560H | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION, I OBSERVED ACTIVE WORK IN PROGRESS AT A 12-STORY NEW BUILDING TOPPED OFF. I SEARCHED THE DOB S... | $5,000 | $5,000 | Nov 20, 2026 |
| Feb 19, 2026 | 39550558Z | RESOLVE | CLASS - 2 | AT THE TIME OF INSPECTION, I OBSERVED PLASTIC BARRIERS INSTALLED ON THE ROADWAY NOT IN ACCORDANCE WITH BC3301.1.3 MAN... | $1,250 | $1,250 | Nov 20, 2026 |
| Feb 19, 2026 | 39550559K | ACTIVE | CLASS - 2 | AT THE TIME OF INSPECTION, I OBSERVED SIDEWALK SHED NOT INSTALLED IN ACCORDANCE WITH BC 3307.1. ROTTEN MUD SILLS CREA... | $2,400 | $2,400 | Nov 20, 2026 |
| Nov 13, 2025 | 39546936P | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION ACTIVITIES. INADEQUATE HOUSEKEEPING OBSERVED ON MULTIPLE FLOOR. HA... | $1,250 | $0 | Jan 30, 2026 |
| Nov 13, 2025 | 39546937R | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP. 1. UPON REVIEWING APPROVED DRAWING NOTICE IT DOES NOT ... | $0 | $0 | May 29, 2026 |
| Nov 13, 2025 | 39546938Z | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED SIDEWALK SHED AT EXP. 1 NOT MAINTAIN. NOTICE PLANKS ON DECK BROKEN, UPON REQUESTING 6 ... | $1,250 | $0 | Jan 30, 2026 |
| Sep 25, 2025 | 39545340J | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION SITE. OBSERVED INADEQUATE HOUSEKEEPING THROUGHOUT THE SITE. OBSERV... | $0 | $0 | Dec 5, 2025 |
| Sep 25, 2025 | 39545338K | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OBSERVED NEEDLE BEAMS INSTALLED AT EXP. 2 OVER ADJ. PROPERTY. UPON REVIEWING DRAWINGS NOTICE IT... | $2,500 | $2,500 | Jan 8, 2027 |
| Aug 29, 2025 | 39544273Y | RESOLVE | CLASS - 2 | 12-STORY NEW BUILDING RESPONDING TO AN INCIDENT WHERE A WORKER GOT HURT WORKING IN ELEVATOR SHAFT PIT AT FIRST FLOOR ... | $5,000 | $5,000 | Apr 10, 2026 |
| Feb 27, 2025 | 39537423P | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OBSERVED ACTIVE CRANE OPERATION NOT CONFORMING TO DRAWINGS. AS PER DRAWINGS IT SHOWS CRANE FULL... | $2,530 | $2,530 | Oct 9, 2026 |
| Feb 27, 2025 | 39537441Z | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION ACTIVITIES. AT 9TH FLOOR OBSERVED UNENCLOSED PERIMETER WITH INADEQ... | $5,030 | $5,030 | Sep 11, 2026 |
| Feb 27, 2025 | 39537442K | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED ACTIVE HOT WORK OPERATIONS. WELDER WAS WORKING BY HIMSELF NO ONE ELSE PRESENT ON THIS ... | $2,530 | $2,530 | Oct 9, 2026 |
| Feb 27, 2025 | 39537438H | ACTIVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE. AT EXP. 3 OBSERVED SEVERAL WORKERS AND MATERIALS SPREAD ON ENTIRE YARD... | $1,280 | $1,280 | Oct 9, 2026 |
| Feb 27, 2025 | 39537437X | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION SITE. NOTICE A WELDER CONDUCTING HOT WORK OPERATION. UPON REQUESTI... | $1,280 | $1,280 | Oct 9, 2026 |
| Jan 3, 2025 | 39535635H | RESOLVE | CLASS - 2 | 28-110.2 PHASED SITE SAFETY PLANS- OBSERVED SUPPORTED PIPE SCAFFOLDING INSTALLED @ EXPOS 1&3 APPROX. 70 FT IN HEIGHT.... | $625 | $0 | Feb 23, 2026 |
| Jan 3, 2025 | 39535636J | RESOLVE | CLASS - 2 | 3307.1 PROTECTION OF PEDESTRIANS- OBSERVED DIESEL FUELED GENERATOR STREET LEVEL OF ACTIVE JOBSITE. THE SAID GENERATOR... | $2,400 | $0 | Feb 23, 2026 |
| Jan 3, 2025 | 39535633Y | RESOLVE | CLASS - 2 | OBSERVED SUPPORTED PIPE SCAFFOLD IN INSTALLATION PROCESS @ EXPO 1 APPROX. 70FT. UPON REVIEW OF PROVIDED APPROVED PLAN... | $3,125 | $3,125 | Sep 1, 2026 |
| Oct 16, 2024 | 39533454J | RESOLVE | CLASS - 2 | A PROPOSED 12 STORY NB ACTIVE SITE. OBSERVED PLUMBING WORK IN PROCESS AT EXP#1. UNDER PERMIT#X00579813 WAS EXPIRED ON... | $0 | $0 | Dec 20, 2024 |
| Oct 16, 2024 | 39533455L | RESOLVE | CLASS - 2 | A PROPOSED 12 STORY NB ACTIVE SITE. OBSERVED WORK CONTRARY TO SITE SAFETY PLANS PG DETAILS. NO/MISSING OR INADEQUATE ... | $620 | $0 | Dec 20, 2024 |
| Aug 2, 2024 | 39531040K | RESOLVE | CLASS - 2 | PROPOSED 12 STORY NB ACTIVE SITE. OBSERVED ROOF PROTECTION IN PLACE PERMIT#X01016579 AT EXP#4 OF ADJOINING PROPERTY. ... | $0 | $0 | Nov 15, 2024 |
| Aug 2, 2024 | 39531041M | RESOLVE | CLASS - 2 | PROPOSED 12 STORY NB ACTIVE SITE. OBSERVED WORK CONTRARY TO SITE SAFETY PLANS PG SSP 200.00/210.00 AT EXP#4 NO/MISSIN... | $0 | $0 | Nov 15, 2024 |
| Aug 2, 2024 | 39531042Y | RESOLVE | CLASS - 2 | PROPOSED 12 STORY NB ACTIVE SITE.OBSERVED 3 MAKESHIFT TEMPORARY CONSTRUCTION EQUIPMENT IN PLACE OVERHEAD /PLATFORMS O... | $1,250 | $0 | Nov 15, 2024 |
| May 3, 2024 | 39528306L | RESOLVE | CLASS - 2 | PE DRAWINGS NOT REFLECT SITE CONDITIONS,DRW INDICATES VERT RESHORES SLAB BE DIAGONAL BRACED NO BRACED PROVIDED,PARTIT... | $1,250 | $0 | Aug 23, 2024 |
| May 3, 2024 | 39528305J | RESOLVE | CLASS - 2 | JOBSITE SUPERSTRUCTURE PHASE AT 2 FLOOR OBSERVED EXP2,4 MISSING WINDOW PROTECTION FOR ADJ.PROPERTY,APP.SSP INDICATES ... | $0 | $0 | Aug 23, 2024 |
| Aug 19, 2023 | 39520769L | RESOLVE | CLASS - 2 | GC FAILED TO MAINTAIN PEDESTRIAN PROTECTION AS PER CODE YO DOCK BARRIERS AT EXPOSURE 1 SIDEWALK & ROADWAY NOT AS PER ... | $0 | $0 | Nov 3, 2023 |
| Aug 4, 2023 | 39520184X | RESOLVE | CLASS - 1 | OBSERVED PATHWAY OF ADJACENT PROPERTY UNDERMINED DUE TO SOE OPERATIONS AT EXPOSURE 4 OF JOBSITE. THE AREA WAS LEFT WI... | $5,000 | $0 | Oct 20, 2023 |
| Aug 4, 2023 | 39520185H | RESOLVE | CLASS - 1 | OBSERVED SOE IN PROGRESS WITH ADJACENT PROPERTY UNDERMINED @ EXPOSURE 4 AND MAKE-SHIFT SUPPORT OF EXCAVATION WITH 2X4... | $2,500 | $0 | Oct 20, 2023 |
| Jul 17, 2023 | 39519376M | RESOLVE | CLASS - 1 | DRAINAGE OF EXCAVATIONS. AT TIME OF INSPECTION AT ACTIVE JOBSITE CURRENTLY AT EXCAVATION PHASE I OBSERVED STANDING WA... | $625 | $0 | Sep 29, 2023 |
| Jul 17, 2023 | 39519379H | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION AT ACTIVE JOBSITE CURRENTLY AT EXCAVATION PHASE UPON REQUEST TO SEE DOCUMENTS PERTAINING TO JOB... | $0 | $0 | Sep 29, 2023 |
| Jul 17, 2023 | 39519378X | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION AT ACTIVE JOBSITE CURRENTLY AT EXCAVATION PHASE UPON SEARCH IN DOB NOW AND BIS SYSTEMS BOTH SHO... | $2,500 | $0 | Sep 29, 2023 |
| Jul 17, 2023 | 39519377Y | RESOLVE | CLASS - 1 | CRACKED SIDEWALK. AT TIME OF INSPECTION AT ACTIVE JOBSITE CURRENTLY AT EXCAVATION PHASE I OBSERVED SIDEWALK BADLY CRA... | $2,500 | $0 | Sep 29, 2023 |
| Jun 14, 2022 | 39502218X | RESOLVE | CLASS - 2 | ON EARTH WORK SCOOPE IN CONJUNTION WITH NB 220212543 ACTIVE PERMIT I OBSERVED: FENCE ON EXP1, MISSING WOOD PANELS OR ... | $0 | $0 | Aug 5, 2022 |