Kipp Affirm Middle School, Bronx
Bronx • Block 03317 • Lot 0023 • Zip: 10468
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Times Square 39 min 2 walking, 37 riding
- Grand Central 41 min 2 walking, 39 riding
- Penn Station 42 min 2 walking, 40 riding
- Union Square 45 min 2 walking, 43 riding
- Fulton Street 51 min 2 walking, 49 riding
- Downtown Brooklyn 56 min 2 walking, 54 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2024
-
DOB violation May 2, 2024
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2023
-
DOB violation Oct 4, 2023
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 2
A 6 STORY NB ACTIVE SITE.I OBSERVED SPIDER CRANE ON ROOF AT EXP#1 FOR LIFTING EXTERIOR GLASS.FURTHER INSPECTION TIE B...
-
CLASS - 2
A 6 STORY NB ACTIVE SITE. I OBSERVED WORKER ON LADDER ON 5 FLOOR EXP#1 PERFORMING WORK ON LADDER APPROXIMATELY 6 FT I...
2022
-
CLASS - 2
3314.14.1.NEEDLE BEAMS DRAWINGS INSUFFICIENT.FAILED TO COMPLY WITH CODE.NOTE NEEDLE BEAMS WITH SCAFFOLD EXP2 DRAWINGS...
-
CLASS - 2
AT TIME OF INSPECTION OF AN 6 STORY NB ACTIVE SITE. OBSERVED NEEDLE BEAMS IN PLACE AT 3RD FL AT EXP#2 IN PLACE. I OBS...
-
CLASS - 2
INSPECTION OF A 6 STORY NB ACTIVE SITE. OBSERVED NEEDLE BEAMS IN PLACE W PIPE SCAFFOLD ON TOP AT EXP2 2 FL. ALSO OBSE...
-
CLASS - 1
WORK DOESNT CONFORM TO APPROVED CONST DOCS &OR APPROVED AMENDMENTS AS NOTED:ATOI@ACTIVE CONST SITE OBSERVED (A)CMU PL...
-
New Building
CONSTRUCT NEW SIX STORY COMMUNITY FACILITY BUILDING AS PER PLANS FILED.
-
Alteration Type III
PROVIDE BUILDERS PAVEMENT PLAN (BPP) FOR A TOTAL FRONTAGE OF 174 FT. AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR ...
2021
-
Demolition
FULL DEMOLITION OF TWO STORY STRUCTURE, USING HAND HELD AND MECHANICAL MEANS TO ASSIST.
-
DOB violation Feb 17, 2021
E-ELEVATOR ELEVATORREQUIRED
2020
-
Alteration Type II
FILING FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS
-
DOB violation Mar 4, 2020
E-ELEVATOR ELEVATORREQUIRED
2019
-
DOB violation Sep 6, 2019
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2017
-
DOB violation Mar 16, 2017
E-ELEVATOR ELEVATORREQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records