210 East 211 Street, Bronx
Bronx • Block 03344 • Lot 0052 • Zip: 10467
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Times Square 48 min 3 walking, 45 riding
- Grand Central 51 min 3 walking, 48 riding
- Penn Station 51 min 3 walking, 48 riding
- Union Square 55 min 3 walking, 52 riding
- Fulton Street 61 min 3 walking, 58 riding
- Downtown Brooklyn 65 min 3 walking, 62 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
Alteration Type I
FILING MECHANICAL/PLUMBING PLANS IN CONJUNCTION WITH ALT1
2024
-
DOB violation Jul 24, 2024
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 2
REMOVAL OF PUBLIC PROTECTION FROM UNSAFE FACADE WITHOUT APPROVAL FROM THE DEPARTMENT.-AT TIME OF INSPECTION OBSERVED ...
-
CLASS - 1
FAILURE TO MAINTAIN BUILDINGS EXTERIOR WALLS AND/OR APPURTENANCES.-AT TIME OF INSPECTION OBSERVED CRACKED BRICK MASON...
-
CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8A AND 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INI...
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
2022
-
Alteration Type II
PROPOSED REPLACEMENT OF BOILERS IN CELLAR WITH HOT WATER HEATES AND DOMESTIC STORAGE TANKS.
-
Alteration Type II
INSTALLATION AND USE OF TELEHANDLER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
-
Alteration Type II
PROPOSED TO RELOCATE EXISTING OXYGEN CYLINDERS AND PIPING TO SIDE YARD. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
-
Alteration Type II
PROPOSED HEMODIALYSIS DEN ON THE 1ST FLOOR, NEW NON-LOABEARING PARTITINS,DOOR, FINISHES AND MILLWORK AND NEW LIGHTING.
2021
-
CLASS - 1
WORK CONTRARY TO SITE SAFETY PLAN.NOTE:AT THE TIME OF INSPECTION OBSERVED AN ALTERATION ON WORK IN PROGRESS ON 7 STY ...
-
CLASS - 2
INADEQUATE CONSTRUCTION FENCE.NOTE:AT THE TIME OF INSPECTION OBSERVED AN ALTERATION WORK IN PROGRESS ON A 7 STY BUILD...
-
CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8A & 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITI...
-
Alteration Type II
PLUMBING/MECHANICAL/SPRINKLER WORK IN CONJUNCTION WITH DOB #240248870
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records