Maintenance code violations
1056 Boynton Avenue, Bronx • Block 03715 • Lot 0030
1,411 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Oct 5, 2023 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 14C | Oct 31, 2023 |
| Oct 4, 2023 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 11D | Jan 7, 2024 |
| Oct 4, 2023 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 6C | Jan 7, 2024 |
| Oct 4, 2023 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 3rd ... | 6C | Oct 30, 2023 |
| Oct 4, 2023 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN TH... | 11D | Nov 8, 2023 |
| Oct 4, 2023 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 3rd STO... | 6C | Oct 30, 2023 |
| Oct 4, 2023 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 11D | Oct 28, 2023 |
| Oct 4, 2023 | B | VIOLATION DISMISSED | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 6C, 3rd STORY, 4th... | 6C | Nov 8, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 11D | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5D | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 14E | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5F | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 14D | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 14F | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 12F | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 1D | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 10D | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4A | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 12B | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 10B | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 7A | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2B | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 8B | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 11B | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 11C | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5B | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2C | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4C | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 14C | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4B | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 10F | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 8E | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5E | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3E | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2E | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 11E | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 7C | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 9C | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6C | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5C | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2F | Oct 30, 2023 |
| Sep 25, 2023 | B | VIOLATION CLOSED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3B | Oct 30, 2023 |
| Sep 20, 2023 | C | NOV SENT OUT | § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO B... | 1B | Sep 24, 2023 |
| Sep 20, 2023 | C | NOV SENT OUT | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | 1B | Sep 24, 2023 |
| Mar 14, 2022 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 14B, 2nd ST... | 14B | Apr 9, 2022 |
| Mar 14, 2022 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE IN THE ENTRA... | 14B | Apr 9, 2022 |
| Feb 17, 2022 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | May 23, 2022 |
| Apr 2, 2021 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Jul 6, 2021 |
| Feb 3, 2020 | B | VIOLATION DISMISSED | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED... | 3A | Mar 9, 2020 |
| Feb 3, 2020 | B | VIOLATION DISMISSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 1st STOR... | 3A | Mar 9, 2020 |