Skip to content

DOB violations

1162-1170 Colgate Avenue, Bronx • Block 03737 • Lot 0038

19 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Sep 23, 2024 01118 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION Dec 2, 2024
Sep 23, 2024 00265 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION Nov 19, 2024
Jun 30, 2023 00737 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 04226 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 03095 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 01890 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 00800 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION Jan 30, 2025
Jun 20, 2023 02010 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION Jan 30, 2025
Jun 20, 2023 03213 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 04356 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Apr 25, 2023 01594 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
Apr 25, 2023 00443 HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION Dec 2, 2024
Dec 8, 2021 21-01731 C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE WORK WITHOUT PERMIT. NOTICED: TWO ATTACHED TO THE BUILDING ENCLOSED STRUCTURES (4FX16F AND 4FX36F) ERECTED AT EXPOSUR...
Dec 8, 2021 21-01732 C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE THE FOLLOWING CONDITIONS ARE TO BE RESTORED IMMEDIATELY. RESTORE PUBLIC RIGHT AWAY-SIDEWALK ALONG EXPOSURES#1 AND 4 T...
Jan 17, 2020 00868 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT Jan 10, 2025
Mar 3, 2015 04548 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT Jan 10, 2025
May 15, 2014 16230 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Mar 1, 2013 16230 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Dec 13, 2011 06581 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V*-DOB VIOLATION - DISMISSED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT Jan 10, 2025