| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Jun 25, 2026 | 201200075 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | EXTERIOR REPAIRS INCLUDING, CORNER REPLACEMENT, PARAPET WALL REPLACEMENT, FACE BRICK REPLACEMENT, POINTING, CHIMNEY R... | $6,839,795 | NYC SCHOOL CONSTRUCTION AUTHORIT |
| Oct 9, 2025 | 201198845 | Alteration Type III | SIGNED OFF | INSTALLATION OF (+/-)720 L.FT TEMPORARY CONSTRUCTION FENCE AS INDICATED ON PLANS IN CONJUNCTION WITH DOB#201200075. T... | $0 | NYC SCHOOL CONSTRUCTION AUTHORIT |
| Jan 31, 2025 | 201198989 | Alteration Type III | SIGNED OFF | INSTALLATION OF (+/-)1682 L.FT NEW SIDEWALK SHED AS INDICATED ON PLANS IN CONJUNCTION WITH DOB JOB NO. 201200075. THE... | $0 | NYC SCHOOL CONSTRUCTION AUTHORIT |
| Jan 2, 2025 | 201198952 | Alteration Type III | SIGNED OFF | INSTALLATION OF DEBRIS CHUTE AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER TH... | $0 | NYC SCHOOL CONSTRUCTION AUTHORIT |
| Mar 29, 2024 | 201193476 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF TWO TEMPORARY HIGH PRESSURE STEAM BOILERS, TEMPORARY ABOVE GROUND FUEL OIL STORAGE TANK, CHIMNEY, AND... | $260,000 | NYC SCHOOL CONSTRUCTION AUTHORIT |
| Feb 8, 2024 | 201202956 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | PROVIDE DUCTLESS SPLIT TYPE A/C UNITS FOR SCHOOL CAFETERIA | $280,000 | NYC SCA |
| Jan 27, 2023 | 201198890 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF PIPE SCAFFOLD (+/-)1283'-0" LONG AND (+/-)82'-0" HIGH ON GRADE AND ON SHED AS INDICATED ON PLANS. THE... | $0 | NYCSCA |
| Mar 4, 2021 | 201195303 | Alteration Type II | SIGNED OFF | REMOVE FOUR EXISTING BOILERS AND APPURTENANCES. REMOVE TWO #6 FUEL OIL TANKS. INSTALL FOUR 231HP, GAS-FIRED, LOW PRES... | $8,500,000 | NYCSCA |
| Jan 6, 2020 | 201197873 | Alteration Type III | SIGNED OFF | THIS APPLICATION INCLUDES THE PREPARATION OF A FIRE PROTECTION PLAN. | $45,000 | NYC SCA |
| Oct 2, 2019 | 201196856 | Alteration Type III | SIGNED OFF | FN/MONROE HS - SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (FENCE), I... | $0 | NYC SCA |
| Sep 30, 2019 | 201195287 | Alteration Type II | SIGNED OFF | ADDITION/MODIFICATION TO EXISTING FIRE ALARM SYSTEM. | $530,000 | NYC/SCA |
| Jan 23, 2019 | 201020901 | Alteration Type II | SIGNED OFF | JAMES MONROE HS REPAIR CONCRETE CRACK, EXPOSED RUSTED STEEL BEAM, REPLACE TILE , FL DRAINS, ANCHORAGE OF DIVING PLATF... | $595,000 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Mar 30, 2018 | 201028645 | Alteration Type II | SIGNED OFF | STAGE EMERGENCY CONTROL SYSTEM FOR AUDITORIUM INTERCONNECTED TO THE EXISTING/A PPROVED INTERIOR FIRE ALARM SYSTEM | $25,000 | NYC SCHOOL CONSTR. AUTHORITY |
| Mar 6, 2017 | 201194108 | Alteration Type II | SIGNED OFF | THE REMOVAL AND DISPOSAL OF OLD HID LIGHTING FIXTURES THAT WILL BE REPLACED WITH NEW ENERGY EFFICIENT LED LIGHTING FI... | $63,000 | NYC SCHOOL CONSTRUCTION AUTHORIT |
| Mar 5, 2015 | 201232111 | Alteration Type II | SIGNED OFF | MODERNIZATION OF EXISTING SCIENCE CLASSROOMS ON 2ND, 3RD, 4TH AND 5TH FLOOR. REPLACEMENT OF EXISTING CASEWORK/FURNITU... | $1,373,253 | NYC SCHOOL CONSTRUCTION AUTHORIT |
| Dec 9, 2014 | 201193323 | Alteration Type II | PLAN EXAM - APPROVED | PROVIDE PARTITION IN CLASSROOM 224 TO CONVERT CLASSROOM 224 INTO (2) CLASSROOMS. PROVIDE CEILING GRILLE, RELOCATE EXI... | $125,000 | NYC SCHOOL CONSTRUCTION AUTHORIT |
| Jun 17, 2014 | 200884668 | Alteration Type II | SIGNED OFF | MONROE HS REPLACE TOILET RM FIXTURES @ BASEMENT, 1ST, 2ND, 2ND MEZZ, 3RD , 3RD MEZZ, 4TH, & 5TH FLS | $315,533 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Jun 17, 2014 | 200884588 | Alteration Type II | SIGNED OFF | MONROE HS REPLACE ENTIRE FA SYSTEM @ MAIAIN BLDG & GYM BLDG INCLUDING: ONE IND.CODED WITH EVACUATION CODE IFASMOK... | $300,000 | NY SCHOOL CONSTRUCTION AUTHORITY |
| May 16, 2014 | 200952576 | Alteration Type II | SIGNED OFF | MONROE HS REPAIRS @AREAWAYS, SLAB, GRATING & CURB REPLACEMENT, EXTERIOR MASONRY REPAIRS, LINTEL REPAIR & REPL... | $2,700,000 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Feb 7, 2014 | 201231247 | Alteration Type II | SIGNED OFF | RENOVATION OF EXISTING SCHOOL NURSE OFFICE INTO NEW SCHOOL BASED HEALTH CLINIC. INSTALLATION OF ALL REQUIRED EQUIPMEN... | $460,000 | NYC SCA |
| Feb 7, 2014 | 201231372 | Alteration Type II | SIGNED OFF | PROVIDE ADDITIONAL STROBES AND HORN/STROBES AND CONNECT TO EXISTING APPROVED FIRE ALARM SYSTEM. | $2,000 | NYC SCA |
| May 28, 2013 | 201230284 | Alteration Type II | SIGNED OFF | REMOVE AND REPLACE FOURTEEN (14) SHOWER HEADS AND ASSOCIATED PIPING AND CONTROLS AT GIRLS' SHOWER ROOM, TEN (10) SHOW... | $82,517 | NYC SCHOOL CONSTRUCTION AUTH. |
| Dec 7, 2012 | 201024514 | Alteration Type II | SIGNED OFF | REAR PLAYGROUND: PROVIDE ADDITIONAL ENTRY GATE TO EXISTING FENCED PLAY EQUIPMENT AREA; SITE FURNITURE, CONCRETE CURB ... | $95,000 | NYC SCHOOL CONSTRUCTION AUTHORIT |
| Jul 16, 2012 | 201024621 | Alteration Type II | SIGNED OFF | MONROE HS REPLACE BASEBALL INFIELD W/NYLON SYNTHETIC TURF, INSTALL BLEACHERS, DUGOUTS, SCOREBOARD, PAVEMENTS & RE... | $895,000 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Mar 15, 2012 | 201023757 | Alteration Type II | SIGNED OFF | SCOPE OF WORK: REPAIR AND RESTORATION OF EXISTING CELLAR SUMP PUMP EQUIPMENT. | $42,650 | NYC SCA |
| Mar 12, 2012 | 201231862 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | OT:REMOVE EXISTING DRYWLL PARTITIONS AND PROVIDE NEW DRYWALL PARTITIONS AND DOORS. PROVIDE NEW RUBBER SHEET FLOORING ... | $450,000 | NYC SCHOOL CONSTRUCTION AUTHORIT |
| Dec 29, 2011 | 200965642 | Alteration Type II | SIGNED OFF | MONROE HS REPLACE CONCRETE WALKWAY, SIDEWALK & WATERPROOFING SYSTEM ATOP VAULT STRUCTURE, PROVIDE INJECTION-BASED... | $676,750 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Oct 13, 2011 | 200965232 | Alteration Type III | SIGNED OFF | JAMES MONROE HS SCAFFOLD IN CONJUNCTIONW/200952576 | $0 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Oct 13, 2011 | 200965250 | Alteration Type III | SIGNED OFF | JAMES MONROE HS SIDEWALKSHED IN CONJUNCTION W/200952576 | $0 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Oct 13, 2011 | 200965241 | Alteration Type III | SIGNED OFF | JAMES MONROE HS FENCE IN CONJUNCTION W/200952576 | $0 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Sep 27, 2011 | 201022598 | Alteration Type III | SIGNED OFF | JAMES MONRO H.S.WE WILL INSTALL 381 LF OF TEMPORARY CONSTRUCTION AT THE BUILDING .THERE WILL BE NO CHANGE IN THE USE,... | $0 | NYC SCHOOL CONST AUTHORITY |
| Sep 27, 2011 | 201025470 | Alteration Type III | SIGNED OFF | JAMES MONROE HIGH SCHOOL - INSTALLATION OF TEMPORARY FENCE AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE,... | $0 | NYC SCA |
| Mar 21, 2011 | 201017318 | Alteration Type III | SIGNED OFF | JAMES MONROE HS - INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB #200965642 (SIDEWALK/WATERPOOF... | $0 | NYC SCA |
| Jun 17, 2010 | 201025238 | Alteration Type III | SIGNED OFF | PS 420 - INSTALLATION OF APPROXIMATELY 200 LF OF FENCE AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGR... | $0 | NYC SCA |
| Mar 2, 2010 | 201022696 | Alteration Type II | SIGNED OFF | JAMES MONROE CAMPUS HS LIBRARY UPGRADE | $555,000 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Dec 9, 2009 | 200834669 | Alteration Type II | SIGNED OFF | BRONX COALITION @ JAMES MONROE HS FOR A NEW RETAINING WALL | $1,886,483 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Nov 20, 2009 | 200836480 | Demolition | SIGNED OFF | — | $0 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Nov 20, 2009 | 200830146 | Alteration Type III | SIGNED OFF | BX COALITION COMMUNITY H MONROE COMPLEX NEW CURB & SIDEWALK | $100,000 | NY SCHOOL CONSTRUCTION AUTHORITY |
| May 20, 2009 | 200834650 | Alteration Type III | SIGNED OFF | BRONX COALITION HS FENCE IN CONJUNCTION W/200834669 | $0 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Apr 16, 2009 | 201017229 | Alteration Type II | SIGNED OFF | REPLACE WALL AND FLOOR TILES. REPLACE FLOOR BASIN. PATCH AND REPAIR CONRETE FLOOR. REPLACE PLASTER AND HUNG CEILING. ... | $212,496 | NYC SCA |
| Apr 8, 2009 | 200963190 | Alteration Type III | SIGNED OFF | NEW MONROE HS INSTALLATION OF A BEAVER 3000 MATERIAL HOIST FOR NB CONST. FILED SEPARATELY UNDER DOB#200884445, SIDEWA... | $0 | NYC SCA |
| Apr 8, 2009 | 200965018 | Alteration Type III | SIGNED OFF | NEW MONROE HS ANNEX SCAFFOLD IN CONJUNCTION W/200884445 | $0 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Jul 1, 2008 | 200557940 | Place of Assembly | COMPLETED | — | $0 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Jul 1, 2008 | 200559546 | Place of Assembly | COMPLETED | — | $0 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Jul 1, 2008 | 200559537 | Place of Assembly | COMPLETED | — | $0 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Jul 1, 2008 | 200557968 | Place of Assembly | COMPLETED | — | $0 | NYC SCA |
| Jul 1, 2008 | 200557897 | Place of Assembly | COMPLETED | — | $0 | NY SCHOOL CONSTRUCTION AUTHORITY |
| Jun 17, 2008 | 200473415 | Alteration Type II | SIGNED OFF | J. MONROE HS ; REMOVAL OF PORTIONS OF AU DITORIUM SEATING. REPLACE EXISTING DRINKING FOUNTAIN ON 1ST,3RD & 5TH FL... | $161,500 | NYC SCA |
| May 1, 2008 | 201076129 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | PROPOSED INSTALLATION OF 150 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY... | $0 | ATLANTIC HOISTING & SCAFFOLDING |
| Oct 24, 2006 | 200882474 | Alteration Type II | PLAN EXAM - APPROVED | JAMES MONROE HS RENO RM 328 PARTITIONS TO DIVIDE INTO 2 CLSSMRS GENERAL PATCHING & PAINTING | $20,000 | NY SCHOOL CONSTRUCTION AUTHORITY |