1440 St Lawrence Avenue, Bronx
Bronx • Block 03898 • Lot 0077 • Zip: 10460
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 41 min 7 walking, 34 riding
- Union Square 45 min 7 walking, 38 riding
- Times Square 47 min 7 walking, 40 riding
- Fulton Street 51 min 7 walking, 44 riding
- Penn Station 55 min 7 walking, 48 riding
- Downtown Brooklyn 58 min 7 walking, 51 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Apr 30, 2026
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
-
DOB violation Feb 6, 2026
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #121525FEU20901AK (CONTROL #350403)WHICH REQUIRES OWNER ENG...
2025
-
DOB violation Dec 15, 2025
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD BLDG TO BE IN A STATE OF DISREPAIR DUE TO FIRE W/ROOF OPEN,ROOF FRAM...
-
DOB violation Dec 15, 2025
UB-UNSAFE BUILDINGS NONE
-
DOB violation Dec 15, 2025
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
SEAL ALL FIRE-DAMAGED AND ACCESSIBLE OPENINGS TO PROTECT THE PUBLIC AND PROPERTY AND PREVENT UNAUTHORIZED ENTRY
-
CLASS - 1
AT TIME OF INSPECTION OBSERVED PREMISES HAS BEEN CONVERTED FROM A 3 FAMILY TO A 4 FAMILY DWELLING CONTRARY TO C OF O ...
-
DOB violation Dec 13, 2025
C-CONSTRUCTION OTHER OPTIONAL
STRUCTURAL RENDERED NON-COMPLIANT. PREMISES SUSTAINED FIRE, WATER AND SMOKE DAMAGES. EXPOSURE 4 WALL IN STATE OF DISR...
-
DOB violation Dec 13, 2025
C-CONSTRUCTION OTHER OPTIONAL
REQUESTING ENGINEERS REPORT FOR BUILDING STRUCTURAL STABILITY DUE TO FIRE.
-
HPD violation Jun 5, 2025
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2024
-
HPD violation Apr 3, 2024
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2023
-
HPD violation May 15, 2023
Class C
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURI...
-
HPD violation May 12, 2023
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NO...
-
HPD violation May 12, 2023
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT SOUTH WALL ...
2007
-
Non-Hazardous
B4A,50A,50B,50C. 50A BACK FLOW PREVENTER MISSING 50B NEED PIGTAIL ON ALL PRESSURE CONTROL DEVICES (STEAM BOILER) 50C ...
-
Hazardous
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DOB RECORDS BN#1406-1926 FROM LEGAL USE : TWO FAMILY TO ILLEGAL USE(3)THREE...
-
Hazardous
WORK W/O A PERMIT WORK NOTED AT THE BASEMENT.1-CONSTRUCTED A 3PC BATHROOM.2-CONSTRUCTED A KITCHEN W/STOVE.3-CONSTRUCT...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records