Maintenance code violations
2070 Holland Avenue, Bronx • Block 04291 • Lot 0001
3,039 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Feb 20, 2024 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE P... | 156 | Feb 26, 2024 |
| Feb 20, 2024 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LO... | 156 | Feb 26, 2024 |
| Feb 20, 2024 | C | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST... | 156 | Feb 26, 2024 |
| Feb 20, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE K... | 156 | Mar 26, 2024 |
| Feb 20, 2024 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL, SOUTH W... | 156 | Feb 26, 2024 |
| Feb 20, 2024 | C | VIOLATION CLOSED | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING 130 DEGREES IN THE ENTIRE APART... | 368 | Feb 26, 2024 |
| Feb 20, 2024 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HEAVY DUTY LOCK AND ASSEMBLY AT BUILDING DOOR (VEST... | — | Feb 26, 2024 |
| Feb 20, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE CERAMIC FLOOR TILES IN THE BATHR... | 156 | Mar 26, 2024 |
| Feb 12, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE BA... | 474 | Mar 18, 2024 |
| Feb 12, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE B... | 474 | Mar 18, 2024 |
| Feb 5, 2024 | B | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER SASH WINDOW 1ST WINDOW FROM... | 356 | Mar 11, 2024 |
| Feb 5, 2024 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH AT BATHTUB I... | 356 | May 10, 2024 |
| Feb 5, 2024 | A | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT WASH BASIN IN THE BATHROOM LOCATED ... | 356 | May 10, 2024 |
| Feb 5, 2024 | B | VIOLATION CLOSED | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 356, 2nd STORY... | 356 | Mar 11, 2024 |
| Feb 2, 2024 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 356 | Feb 28, 2024 |
| Feb 2, 2024 | B | VIOLATION CLOSED | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED... | 356 | Mar 8, 2024 |
| Feb 2, 2024 | B | VIOLATION CLOSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 356, 2nd STO... | 356 | Mar 8, 2024 |
| Feb 2, 2024 | B | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRRING COUNTER BALANCE AT UPPER WINDOW SASH 2ND WI... | 356 | Mar 8, 2024 |
| Feb 1, 2024 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL THE WALLS IN... | — | May 6, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ROOM DOOR LOCK AND ITS ASSEMBLY IN THE 3rd ROOM FRO... | 346 | Mar 7, 2024 |
| Feb 1, 2024 | C | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1... | 346 | Feb 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ROOM DOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT... | 346 | Mar 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAS... | 566 | Mar 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 566, 4th STORY, 3rd APARTMENT FROM W... | 566 | Mar 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 566, 4th STORY, ... | 566 | Mar 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 5th ROOM FRO... | 566 | Mar 7, 2024 |
| Feb 1, 2024 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SELF CLOSING FIRE RATED DOOR IN THE ENTRANCE LOCATE... | 468 | Feb 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FRO... | 566 | Mar 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING A... | — | Mar 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAS... | 566 | Mar 7, 2024 |
| Feb 1, 2024 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... | 645 | Feb 15, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOU... | 661 | Mar 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FRO... | 346 | Mar 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE DOOR IN THE BATHROOM LOCATED AT APT 661, 5th ST... | 661 | Mar 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE BATHRO... | 661 | Mar 7, 2024 |
| Feb 1, 2024 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW INNER GLASS PANE AT SOUTH WALL IN THE ... | 645 | Feb 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL... | 645 | Mar 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL... | 645 | Mar 7, 2024 |
| Feb 1, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL... | 645 | Mar 7, 2024 |
| Feb 1, 2024 | C | VIOLATION CLOSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER INNER GLASS PANE AT SOUTH WALL IN THE 2nd ROO... | 645 | Feb 7, 2024 |
| Jan 31, 2024 | B | VIOLATION CLOSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING A... | — | Mar 6, 2024 |
| Jan 31, 2024 | A | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 16 SQ. FT. AT CEIL... | — | May 5, 2024 |
| Jan 31, 2024 | B | VIOLATION CLOSED | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT VESTIBULE , 1st ... | — | Mar 6, 2024 |
| Jan 24, 2024 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 671 | Apr 28, 2024 |
| Jan 24, 2024 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 156 | Apr 28, 2024 |
| Jan 24, 2024 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 156 | Feb 17, 2024 |
| Jan 24, 2024 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT ... | 156 | Feb 17, 2024 |
| Jan 24, 2024 | B | VIOLATION CLOSED | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT SINK IN THE KITCHEN LOCATED AT APT 671, 5th STORY, 1s... | 671 | Feb 28, 2024 |
| Jan 24, 2024 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 671, 5th... | 671 | Feb 19, 2024 |
| Jan 24, 2024 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 671, 5th ST... | 671 | Feb 19, 2024 |