2512 Bronx Park East, Bronx • Block 04427 • Lot 0012

11 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Apr 21, 2026 39553293X RESOLVE CLASS - 1 AT TIME OF INSPECTION OBSERVED ACTIVE CONSTRUCTION ACTIVITIES. AT 4TH FLOOR OBSERVED WORKERS INSTALLING RAILING ON BA... $1,600 $1,600 Jan 15, 2027
Apr 21, 2026 39553294H RESOLVE CLASS - 1 UPON ARRIVAL ON SITE OBSERVED WORKER ON 4TH FLOOR BALCONY INSTALLING BOLTS ON SLAB. AFTER INQUIRE ABOUT FALL PROTECTI... $5,000 $5,000 Dec 18, 2026
Apr 9, 2026 39552846M RESOLVE CLASS - 2 THE RECORD SHOWED THE SITE SAFETY MANAGER FAILED TO COMPLY WITH BC 3310.5.4 LIMITATION ON PRIMARY SITE SAFETY MANAGER... $2,500 $2,500 Feb 5, 2027
Mar 22, 2026 39181351K RESOLVE CLASS - 1 WORK AFTER HOURS WITHOUT A VARIANCE PERMIT CONTRARY TO 28-105.12.5. NOTED: AT THE TIME OF INSPECTION OBSERVED WORKERS... $2,500 $2,500 Dec 10, 2026
Feb 21, 2026 39550695P RESOLVE CLASS - 1 GC#625865. DURING MY INSPECTION OF A CLOSED 8 STORY NB WITH A BUILDING FOOTPRINT OF APPROXIMATELY 7,689 SF. I KNOCKED... $5,000 $5,000 Dec 1, 2026
Dec 15, 2025 39547964R RESOLVE CLASS - 1 AT A CONSTRUCTION SITE WHERE A WORKER WAS INJURED BY A PIECE OF SHEET ROCK, FAILED TO SUBMIT INCIDENT REPORT WITHIN 3... $10,000 $10,000 Sep 1, 2026
Dec 4, 2025 39547624K RESOLVE CLASS - 1 3301.11.3 SITE SAFETY ORIENTATION AND REFRESHER TO BE CONDUCTED BY A QUALIFIED PERSON. JHAMERLIN F MELENDEZ WAS TAKEN... $5,000 $5,000 Sep 1, 2026
Dec 4, 2025 39547622R RESOLVE CLASS - 1 3301.2. MY INSPECTION REVEALED THAT A LACK OF SUPERVISION AND PROPER SEQUENCE OF MATERIAL HANDLING CREATED AN UNSAFE ... $5,000 $5,000 Sep 1, 2026
Dec 4, 2025 39547623Z RESOLVE CLASS - 2 3303.2.3.1. DURING MY INSPECTION, I OBSERVED DRYWALL OPERATIONS TAKING PLACE IN ROOMS WITH INADEQUATE TEMPORARY LIGHT... $2,500 $2,500 Sep 1, 2026
Aug 14, 2025 39543686H RESOLVE CLASS - 1 AT THE TIME OF INSPECTION ACTIVE CONSTRUCTION SITE FOUNDATION EXCAVATION WORK IN PROGRESS OBSERVED NO SITE SAFETY MAN... $10,000 $10,000 Dec 10, 2026
Jun 27, 1989 32002663Z RESOLVE Non-Hazardous FLU PIPE NOT PROPERLY SEALED AT CHIMNEY BASE. $0 $0 Aug 11, 1989