3216 Cruger Avenue, Bronx
Bronx • Block 04597 • Lot 0014 • Zip: 10467
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Times Square 61 min 13 walking, 48 riding
- Penn Station 62 min 13 walking, 49 riding
- Grand Central 64 min 13 walking, 51 riding
- Union Square 68 min 13 walking, 55 riding
- Fulton Street 72 min 13 walking, 59 riding
- Downtown Brooklyn 79 min 13 walking, 66 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jun 10, 2026
Class C
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT 2ND STAIR DOOR FROM EAST AT SO...
-
HPD violation Jun 10, 2026
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Jun 10, 2026
Class B
§ 27-2005 HMC: REFIT 1ST STAIR DOOR FROM EAST AT SOUTH WALL AT PUBLIC HALL, 1st STORY
2024
-
HPD violation Apr 18, 2024
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2023
-
HPD violation Aug 14, 2023
Class A
§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE ALL PUBLIC HALL WAYS, STAIRS AND LANDINGS AT PU...
-
HPD violation Aug 10, 2023
Class C
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT PUBLIC HALL, 1st STORY
2020
-
New Building
-
Alteration Type III
BUILDERS PAVEMENT PLAN FILED IN CONJUNCTION WITH NEW BUILDING DOB# 220542232 & 220542241
-
Alteration Type II
INSTALLATION OF NEW GAS BOILER FILED IN CONJUNCTION WITH NEW BUILDING DOB# 220542232.
-
Alteration Type II
INSTALL AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE ALARM SYSTEM PER NYCBC SECTION 907.2.9 AND PER PLANS FILE...
2019
-
CLASS - 2
FAILURE TO APPLY WITH D.O.T PERMIT FOR STREET/SIDEWALK CLOSING.AT THE TIME OF INSPECTION AT A 4STORY NB,I OBSERVED NO...
-
CLASS - 2
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PR SECTION REQUIREMENTS AT TH ETIME OF INSPECTION OF A PROPSOED 4 STORY NEW...
2018
-
CLASS - 1
CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES AS PER CODE:CONSTRUCTION SUPERINTENDENT CHRISTOPHER M.MIELE IN (...
-
CLASS - 1
NO GUARD RAILING:NOTE AT TIME OF INSPECTION OFA 4 STORY NEW BUILDING AT 3RD STY ().I OBSERVED THERE WAS NO GUARD RAIL...
-
CLASS - 1
3303.2.UTILITIES:NOTE AT TIME OF INSPECTION OF A 4 STORY NEW BUILDING CMU WALLS TO 3 FL.I OBSERVED THAT (TRUE)EXISTIN...
-
CLASS - 2
WORK DOES NOT CONFORM TO APPROVED DOCUMENTS.NOTE AT TIME OF INSPECTION OF 4 STORY NEW BUILDING AT 3 STORY.I OBSERVED ...
-
Alteration Type III
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL CO...
2017
-
DOB violation Nov 15, 2017
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2016
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records