East 213 Street, Bronx
Bronx • Block 04660 • Lot 0015 • Zip: 10467
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Times Square 61 min 13 walking, 48 riding
- Penn Station 62 min 13 walking, 49 riding
- Grand Central 64 min 13 walking, 51 riding
- Union Square 68 min 13 walking, 55 riding
- Fulton Street 72 min 13 walking, 59 riding
- Downtown Brooklyn 79 min 13 walking, 66 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation May 11, 2026
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2025
-
CLASS - 2
OBSERVED YODOCKS BARRIERS NOT CONNECTED PER MANUFACTURER SPECIFICATIONS AND NOT FILLED WITH WATER AS REQUIRED, CREATI...
-
CLASS - 2
OBSERVED 7 STORY BUILDING WITH EXTERIOR WORK NOT COMPLETED AND SWS REMOVED PREMATURELY PRIOR TO WORK COMPLETION PER B...
-
CLASS - 2
OBSERVED SWS DECK NOT TIGHT TO FACADE CREATED OPENINGING BETWEEN TOP OF FENCE AND BOTTOM OF SWS DECK HAZARD CREATED S...
-
CLASS - 2
3303.11.2- OBSERVED EAST TOWER OF JOBSITE @ 6TH FL ABOVE 40 FT W/OUT NOT PERMANENT STAIRS INSTALLED & NO PERMANENT CO...
-
CLASS - 2
3308.5 VERTICAL SAFETY NETTING SYSTEMS- OBSERVED MULTIPLE LOCATIONS W/OUT VERTICAL SAFETY NETTING INSTALLED. FROM 3RD...
-
CLASS - 1
UPON A DEMO MONITORING INSPECTION I OBSERVED COMPLETED DEMO OF A 3 STORY STRUCTURE AND A NEW BUILDING BE CONSTRUCTED ...
2024
-
Alteration Type III
BUILDERS' PAVEMENT PLAN OF 295.02 LF FILED IN CONJUNCTION WITH NEW BUILDING DOB# X00895492-I1
2023
2022
2013
-
HPD violation Apr 12, 2013
Class C
§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT 1ST AND 2ND STORY PUBL...
-
HPD violation Apr 10, 2013
Class C
§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS PANE UPPER WINDOW SASH IN THE 3rd ROOM FROM EAS...
-
HPD violation Apr 10, 2013
Class A
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW BALANCE UPPER SASH IN THE 3rd ROOM FROM EAST AT...
-
HPD violation Apr 10, 2013
Class A
§ 27-2023 ADMIN. CODE: PROVIDE SUFFICIENT,PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH A...
-
HPD violation Apr 10, 2013
Class B
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM ...
2010
1996
1990
-
DOB violation Nov 23, 1990
C-CONSTRUCTION OTHER OPTIONAL
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records