3546 East Tremont Avenue, Bronx • Block 05531 • Lot 0103

14 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Aug 15, 2025 39543722X RESOLVE CLASS - 2 OBSERVED WORKERS ON ACTIVE JOBSITE USING SUPPORTED SCAFFOLD SYSTEM. UPON REQUEST FOR REQUIRED WORKERS WALLET TO VERIF... $2,500 $2,500 Dec 4, 2026
Aug 15, 2025 39543727P RESOLVE CLASS - 1 OBSERVED ACTIVE 2 STORY JOBSITE WITH STRUCTURAL STEEL CONNECTIONS AND CONCRETE DECK. SECOND FLOOR WORK DECK W/OUT GUA... $5,000 $5,000 Dec 4, 2026
Aug 15, 2025 39543730X RESOLVE CLASS - 2 OBSERVED JOBSITE W/ MULTIPLE VIOLATING CONDITIONS CONSISTING OF NO GUARDRAILS, MAKESHIFT STEEL CONNECTION, POWERLINE ... $5,000 $5,000 Dec 4, 2026
Aug 15, 2025 39543714X RESOLVE CLASS - 1 3305.2.2-AT TIME OF INSPECTION ON AN ACTIVE JOBSITE, OBSERVED STEEL ASSEMBLY/ FABRICATION/ CONNECTION/ MODIFIEDÂ FROM... $5,030 $5,030 Sep 14, 2026
Aug 15, 2025 39543715H RESOLVE CLASS - 1 OBSERVED ACTIVE CONSTRUCTION OPERATIONS ON A 2-STORY BUILDING W/ MAKE-SHIFT STRUCTURAL ELEMENTS, TORCHED & MODIFIED C... $2,530 $2,530 Sep 14, 2026
Aug 15, 2025 39543728R RESOLVE CLASS - 2 3301.6-OBSERVED MAKESHIFT PULLY SYSTEM INSTALLED ON 2ND FLOOR OF JOBSITE. MAKE SHIFT CONNECTION COMPOSE OF LOSE MEMBE... $2,530 $2,530 Sep 14, 2026
Aug 15, 2025 39543729Z RESOLVE CLASS - 2 3301.2-OBSERVED SIDEWALK SHED AT EXPOSURE 1 OF JOBSITE, APPROXIMATELY 12 FT IN HEIGHT IN CLOSE PROXIMITY OF POWERLINE... $5,030 $5,030 Sep 14, 2026
Aug 15, 2025 39543716J RESOLVE CLASS - 1 3305.3.5.2-OBSERVED AN ACTIVE 2-STORY JOBSITE WITH STRUCTURAL STEEL CONNECTIONS AND CONCRETE DECK AT 2ND FL W/ DECK I... $5,000 $5,000 Dec 4, 2026
Aug 15, 2025 39543720M RESOLVE CLASS - 1 3301.6-OBSERVED MAKESHIFT SUPPORTED PIPE SCAFFOLDING APPROX 24 FT IN HEIGHT, INSTALLED AT EXPO 1 OF JOBSITE USED FOR ... $5,000 $5,000 Dec 4, 2026
Aug 15, 2025 39543721Y RESOLVE CLASS - 1 3303.4.4.3-OBSERVED INADEQUATE HOUSEKEEPING THROUGHOUT JOBSITE. INTERIOR OF JOBSITE HAS LARGE AMOUNTS OF TRASH AND DE... $5,000 $5,000 Dec 4, 2026
Apr 14, 2025 39539085K RESOLVE CLASS - 1 BC 3301.1.1 RESPONSIBILITY FOR SAFETY. ACTIVE JOBSITE UNDER EARTHWORK & FOUNDATION, I OBSERVED USE OF EXCAVATOR MACHI... $5,000 $5,000 Aug 25, 2026
Apr 14, 2025 39539088X RESOLVE CLASS - 1 SAFE MEANS OF EXCAVATION- ACTIVE JOBSITE UNDER EARTHWORK & FOUNDATION STAGE. I OBSERVED WORKERS PERFORMING WORK IN OP... $5,000 $5,000 Aug 25, 2026
Apr 14, 2025 39539090P RESOLVE CLASS - 2 ACTIVE JOBSITE UNDER EARTHWORK & FOUNDATION. I OBSERVED AN OPEN EXCAVATION DEPTH OF MORE 12FEET DEEP THEREBY EXPOSING... $2,500 $2,500 Aug 25, 2026
Apr 8, 2025 39538852H RESOLVE CLASS - 2 DURING MY INSPECTION OF A NEW PROPOSED COMMERCIAL BUILDING AT THE SOE PHASE. I OBSERVED A PERMITTED JOB SITE IN PLACE... $1,000 $0 Nov 21, 2025