Issued Violation Status Severity Description Penalty Balance due Hearing
Feb 22, 2026 39550783P RESOLVE CLASS - 1 OBSERVED SIDEWALK SHED DECK LOADED WITH DEBRIS, CONSTRUCTION MATERIAL SCATTERED THROUGHOUT CREATING AN EXTRA LOAD ON ... $5,000 $5,000 Sep 25, 2026
Feb 22, 2026 39550784R RESOLVE CLASS - 1 OBSERVED SUPPORTED PIPE SCAFFOLD AT EXPO #3 OBSERVED FULLY PLANKED ON MULTIPLE LEVELS CONTRARY TO APPROVED PLANS. FIL... $5,000 $5,000 Sep 25, 2026
Feb 22, 2026 39550781L RESOLVE CLASS - 2 OBSERVED PUMP-JACKS INSTALLED APPROX. 41 FEET IN HEIGHT ON A MAKE-SHIFT PLATFORM AT EXPO 2, ADJACENT TO AN OCCUPIED R... $1,250 $0 Sep 25, 2026
Feb 22, 2026 39550782N RESOLVE CLASS - 1 OBSERVED UNFINISHED CONSTRUCTION OPERATIONS W/ TEMPORARY EQUIPMENT CONSISTING OF PUMP-JACKS & SUPPORTED PIPED SCAFFOL... $5,000 $5,000 Sep 25, 2026
Dec 22, 2025 39548261P RESOLVE CLASS - 2 AT TIME OF INSPECTION, OBSERVED ACTIVE CONSTRUCTION AT EXPOSURE FACING PUBLIC SIDEWALK AND ADJOINING PROPERTY 3023 CO... $2,530 $2,530 Jan 21, 2027
Dec 22, 2025 39548251L RESOLVE CLASS - 1 AT TIME OF REINSPECTION, PREVIOUS INSPECTOR HAD ISSUED A STOP WORK ORDER FOR ALL EXTERIOR WORK. UPON REINSPECTION, WI... $10,030 $10,030 Jan 21, 2027
Nov 25, 2025 39168318M ACTIVE CLASS - 2 ON EXPOSURE #2 FROM 2ND FLOOR TO 4TH FLOOR EXTERIOR WALLS INBOARD INSULATION WERE INSTALLED MINERAL WOOL INSULATION R... $6,250 $6,250 Jan 21, 2027
Oct 9, 2025 39545777M RESOLVE CLASS - 2 AT TIME OF INSPECTION OF 4 STORY NEW BUILDING OBSERVED SIDEWALK SHED PARTIALLY INSTALLED VERY CLOSE TO POWERLINES OF ... $5,000 $5,000 Sep 25, 2026
Oct 9, 2025 39545788H RESOLVE CLASS - 1 AT TIME OF INSPECTION OF 4 STORY NEW BUILDING OBSERVED NO OVERHEAD PROTECTION AT EXPOSURE #2 WHERE PUBLIC CAN ACCESS ... $10,000 $10,000 Sep 25, 2026
Apr 22, 2025 39539385M RESOLVE CLASS - 2 BC 3301.13.5 ALTERNATE CONSTRUCTION SUPERINTENDENT. ACTIVE JOBSITE DRILLING PILES & PARTIAL SOE. NO CONSTRUCTION SUPE... $2,500 $2,500 Dec 10, 2026
Apr 22, 2025 39539387X RESOLVE CLASS - 2 OBSERVED ACTIVE JOBSITE WITH PILES BEING DRILLED. EXPO 4 FENCE WAS REMOVED EXPOSING EXPO 4 ADJACENT PROPERTY SIDE WAL... $5,000 $5,000 Dec 10, 2026
Apr 22, 2025 39539388H RESOLVE CLASS - 2 3304.7 ACCESS. OBSERVED INADEQUATE MEAN OF EGRESS @ EXCAVATION APPROX. 10' DEEP. MAKESHIFT STAIR CASE WITH NO DESIGNE... $2,500 $2,500 Dec 10, 2026
Apr 22, 2025 39539386Y RESOLVE CLASS - 2 OBSERVED ACTIVE JOBSITE DRILLING PILES @ INTERIOR OF JOBSITE. ASKED WORKERS TO PROVIDE REQUIRED ONSITE DOCUMENTS SUCH... $1,250 $1,250 Dec 10, 2026
Apr 4, 2024 39527116X RESOLVE CLASS - 2 OBSERVED JOBSITE AT EXCAVATION/FOUNDATION PHASE OF CONSTRUCTION. THE SAID JOBSITE HAS ACCUMULATED LARGE AMOUNT OF POO... $0 $0 May 20, 2025