3950 Blackstone Avenue, Bronx
Bronx • Block 05909 • Lot 0163 • Zip: 10471
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Times Square 60 min 19 walking, 41 riding
- Penn Station 61 min 19 walking, 42 riding
- Grand Central 66 min 19 walking, 47 riding
- Union Square 71 min 19 walking, 52 riding
- Fulton Street 71 min 19 walking, 52 riding
- Downtown Brooklyn 77 min 19 walking, 58 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Citi Bike
Places nearby
Liebman’s Deli
Liebman's Deli is a cozy neighborhood spot in the Bronx offering delicious deli sandwiches, soups, and salads. The at...
Bagel Corner
No description yet
Liebman's Kosher Deli
Liebman's Kosher Deli is a beloved Bronx institution serving up traditional Jewish deli classics like matzo ball soup...
Bokaguá
No description yet
An Beal Bocht Cafe
No description yet
Tobalá
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jul 2, 2026
Class C
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER ABOVE 130 DEGREES IN THE ENTIRE ...
-
CLASS - 1
ATOI, WWOP: OBSERVE AT EXPOSURE 3 FOR THE SCAFFOLDING WORK IN PROGRESS 6 STORY HIGH WITHOUT A PERMIT ON FILE FOR THE ...
-
HPD violation Jun 1, 2026
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
CLASS - 2
OBSERVE A FAILURE TO INSTALL GROUND-FAULT CIRCUIT INTERRUPTER (GFCI) PROTECTION AS REQUIRED, FOR THE OUTLET IN THE KI...
-
CLASS - 2
ATOI, WWOP: IT WAS OBSERVED THAT ELECTRICAL WORK HAS BEEN PERFORMED IN THE KITCHEN FOR THE INSTALLATION OF A NEW ELEC...
-
HPD violation Mar 2, 2026
Class B
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... [LESS THEN TEN] INSIDE OF CLOSET...
-
HPD violation Jan 9, 2026
Class A
§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND T...
-
HPD violation Jan 5, 2026
Class B
§ 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF ROMEX WIRE IN LOW...
-
HPD violation Jan 5, 2026
Class B
§ 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICA...
2024
-
DOB violation Aug 21, 2024
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 1
CEASE USE ITEMS: 1) INOPERATIVE ZONE LOCK RESTRICTOR. 2) EXCESSIVE BOUNCE IN WORM AND GEAR RESULTING IN EXCESSIVE ROP...
-
CLASS - 2
AT TIME OF INSPECTION OF 7 STORY RESIDENTIAL BUILDING OBSERVED SIDEWALK SHED IN PLACE NOT MAINTAINED PER CODE 1. ROTT...
-
CLASS - 1
UNLAWFUL ACTS: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. NOTE: DOB VIOLATION #100721LLFA024J REQUIRED THE OWNER TO...
-
DOB violation Mar 8, 2024
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9A UNSAFE REPORT FILED
2022
-
DOB violation Aug 2, 2022
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-
DOB violation Mar 16, 2022
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Feb 22, 2022
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
-
DOB violation Jan 5, 2022
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021
2017
-
Alteration Type II
REMOVE AND REPLACE 15 LF OF PARAPET WALL. NO CHANGE IN USE , EGRESS OR OCCUPANCY
-
Alteration Type II
EXTERIOR FACADE REPAIRS AND RESTORATION.NO CHANGE IN USE EGRESS OR OCCUPANCY
2016
-
Alteration Type III
MODIFICATION TO EXISTING ANTENNA SITE. REPLACE EXISTING ANTENNAS AND INSTALL RELATED RRH UNITS ON THE ROOF. ALL WORK ...
2013
-
Alteration Type III
INSTALLATION OF A SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAF...
-
Alteration Type III
INSTALLATION OF A SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAF...
-
Alteration Type III
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 50' LONG AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO C...
2012
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records