Main Street, Brooklyn
Brooklyn • Block 00026 • Lot 0080 • Zip: 11201
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 10 min 5 walking, 5 riding
- Fulton Street 19 min 5 walking, 14 riding
- Union Square 24 min 5 walking, 19 riding
- Grand Central 30 min 5 walking, 25 riding
- Penn Station 30 min 5 walking, 25 riding
- Times Square 31 min 5 walking, 26 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Titán
No description yet
Ingas Bar
Ingas Bar is a cozy neighborhood spot in Brooklyn offering delicious food and craft cocktails. With a laid-back atmos...
Celestine
Contemporary place for wood-fired Mediterranean and Middle Eastern fare with wine, cocktails, plus river views.
Lucky Rabbit Noodles
No description yet
Juliana's Pizza
No description yet
Noodle Pudding
Large portions of Italian comfort food are dished for crowds. Cash only & no reservations accepted.
Henry’s End
No description yet
The Fulton
The Fulton is a chic seafood restaurant located in the heart of New York City. With a focus on fresh, locally sourced...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
2025
2024
2023
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
-
Alteration Type II
HEREWITH FILING FOR GENERAL CONSTRUCTION WORK FOR MODULAR SEATING SYSTEM ASSEMBLY IN CONJUNCTION WITH TEMPORARY PLACE...
2019
-
Alteration Type III
INSTALL OF TEMP EXTERIOR TRUSS STRUCTURE AND INTERIOR SEATING ,NO ALTERATIONS TO EXIST STRUCTURES, FOR DICKINSON. TPA...
-
DOB violation Apr 22, 2019
E-ELEVATOR ELEVATORREQUIRED
2018
2017
-
Alteration Type III
FIRE PROTECTION PLAN BEING FILED IN CONJUNCTION WITH ALTERATION 1 APPLICATION NUMBER 320517017. NO CHANGE TO USE, EGR...
-
CLASS - 2
SEC. 28-109.3 FAILURE TO PROVIDE FIRE PROTECTION PLAN. OBSERVED THEATRE W/POTENTIAL OCCUPANCY OF 920 PERSONS OCCUPIED...
-
DOB violation Mar 3, 2017
E-ELEVATOR ELEVATORREQUIRED
2016
-
Alteration Type I
MECHANICAL, PLUMBING AND SPRINKLER PLANS IN CONJUNCTION WITH ALT1 #320517017 .
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records