DOB violations
Bridge Park 3, Brooklyn • Block 00068 • Lot 0001
52 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jun 30, 2023 | 04792 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Nov 21, 2024 |
| Jun 30, 2023 | 04795 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Nov 21, 2024 |
| Jun 30, 2023 | 04791 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Nov 21, 2024 |
| Jun 30, 2023 | 04794 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Nov 21, 2024 |
| Jun 30, 2023 | 04793 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Nov 21, 2024 |
| Jun 20, 2023 | 26376 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Nov 21, 2024 |
| Jun 20, 2023 | 26377 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Nov 21, 2024 |
| Feb 22, 2023 | 00730 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | Sep 5, 2025 |
| Feb 22, 2023 | 00725 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | — |
| Feb 22, 2023 | 00723 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | Sep 5, 2025 |
| Aug 22, 2019 | HAZ86381 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | NYCHA UNSAFE REPORT | Dec 13, 2025 |
| Sep 15, 2017 | 00074 | HVIOS-NYCHA ELEV ANNUAL INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST | Apr 10, 2019 |
| Jan 3, 2017 | 00218 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jun 20, 2017 |
| Jan 3, 2017 | 00219 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jun 12, 2017 |
| Jan 3, 2017 | 00213 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jun 20, 2017 |
| Jan 3, 2017 | 00220 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Jun 12, 2017 |
| Jan 3, 2017 | 00223 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Apr 21, 2017 |
| Jan 3, 2017 | 00224 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | Apr 21, 2017 |
| Dec 23, 2015 | HAZ85923 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jun 20, 2018 |
| Dec 23, 2015 | HAZ85927 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jun 4, 2018 |
| May 8, 2014 | HAZ75134 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Jun 4, 2018 |
| May 6, 2014 | HAZ75133 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Jun 20, 2018 |
| Aug 30, 2013 | 01317 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01366 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01368 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Mar 15, 2010 | HAZ2724 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Jul 29, 2011 |
| Mar 12, 2010 | HAZ2718 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Aug 1, 2011 |
| Mar 12, 2010 | HAZ2717 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Aug 1, 2011 |
| Nov 30, 2007 | NRF45331 | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Sep 9, 2010 |
| Nov 30, 2007 | NRF45332 | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Sep 9, 2010 |
| Nov 30, 2007 | NRF45330 | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Jul 6, 2017 |
| Aug 8, 2002 | NRF52650 | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Sep 9, 2010 |
| Aug 8, 2002 | NRF52651 | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Sep 9, 2010 |
| Aug 8, 2002 | NRF52649 | L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Dec 22, 2003 |
| Mar 26, 2002 | 13189 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Oct 8, 2002 |
| Mar 26, 2002 | 13190 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Oct 8, 2002 |
| Mar 26, 2002 | 13188 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Oct 8, 2002 |
| Mar 26, 2002 | 13187 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Oct 8, 2002 |
| Mar 26, 2002 | 13191 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Oct 8, 2002 |
| Jan 20, 1999 | 02016 | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Jul 30, 2011 |
| May 4, 1998 | 16895 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Oct 26, 1998 |
| May 4, 1998 | 16892 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Oct 26, 1998 |
| May 4, 1998 | 16893 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Oct 26, 1998 |
| May 4, 1998 | 16894 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Oct 26, 1998 |
| May 4, 1998 | 16896 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Oct 26, 1998 |
| Jan 6, 1998 | 01748 | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Jul 30, 2011 |
| Apr 7, 1992 | 03339 | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | V*-DOB VIOLATION - DISMISSED | 2 | Jul 30, 2011 |
| Apr 7, 1992 | 03341 | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | V*-DOB VIOLATION - DISMISSED | 2 | Jul 30, 2011 |
| Apr 7, 1992 | 03340 | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | V*-DOB VIOLATION - DISMISSED | 2 | Jul 30, 2011 |
| Nov 1, 1990 | 1448D01 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 30, 2011 |