25-29 Willoughby Street, Brooklyn
Brooklyn • Block 00140 • Lot 0147 • Zip: 11201
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Downtown Brooklyn 5 min 5 walking, 0 riding
- Fulton Street 14 min 5 walking, 9 riding
- Penn Station 25 min 5 walking, 20 riding
- Union Square 26 min 5 walking, 21 riding
- Times Square 27 min 5 walking, 22 riding
- Grand Central 30 min 5 walking, 25 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
al Badawi
Middle Eastern specialties are offered in this down-to-earth restaurant with a terrace.
The Long Island Bar
The Long Island Bar in Brooklyn offers a cozy and retro atmosphere, with a classic cocktail menu and delicious comfor...
Gage & Tollner
Gage & Tollner is a historic restaurant in Brooklyn known for its elegant atmosphere and classic American cuisine. Lo...
Lonnies
No description yet
Montague Diner
No description yet
El Cedro
No description yet
Sea & Soil
No description yet
Lillo Cucina
Lillo Cucina in Brooklyn offers authentic Italian cuisine in a cozy and inviting atmosphere. Enjoy homemade pasta, wo...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2024
-
DOB violation Sep 23, 2024
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
2023
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2020
-
Alteration Type II
REPLACE DAMAGED ROOFING, SHEATHING AND WOOD JOISTS ABOVE REAR ONE STORY PORTION OF BUILDING. REPLACE PORTION OF EXIST...
2019
-
Alteration Type II
INSTALLATION OF A/C WITH DUCT WORK .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY .
-
Alteration Type II
INSTALLATION OF A/C WITH DUCT WORK .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY .
-
Alteration Type II
INSTALLATION OF A/C WITH DUCT WORK .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY .
-
Alteration Type II
INSTALLATION OF A/C WITH DUCT WORK .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY .
2018
-
Alteration Type II
INSTALLATION OF A/C WITH DUCT WORK .THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY .
2017
2016
-
CLASS - 2
5B,15,32A,34B,38,48A,50,50A 50-CHECK VALVE MISSING FROM FEED PIPE AT BOILER 50A-SEWER CLEANOUT CAP NOT IN PLACE
2013
1992
-
Non-Hazardous
OPERATOR OF A PUBLIC ASSEMBLY WITHOUT A PUBLIC ASSEMBLY PERMIT AT GROUND FLOOR. REMEDY: DISCONTINUE ILLEGAL USAGE OBT...
-
Non-Hazardous
ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY UNDER ALT.1847-89. REMEDY: DISTCONTINUE THE ILLEGA...
1991
-
Unknown
OPERATION OF A PLACE OF ASSEMBLY WITHOUT A CURRENT PERMIT. OBTAIN A CURRENT P/A PERMIT, FORTHWITH.
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records