1 Metrotech Center, Brooklyn
Brooklyn • Block 00147 • Lot 0004 • Zip: 11201
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 5 min 5 walking, 0 riding
- Fulton Street 14 min 5 walking, 9 riding
- Penn Station 25 min 5 walking, 20 riding
- Union Square 26 min 5 walking, 21 riding
- Times Square 27 min 5 walking, 22 riding
- Grand Central 30 min 5 walking, 25 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
al Badawi
Middle Eastern specialties are offered in this down-to-earth restaurant with a terrace.
Gage & Tollner
Gage & Tollner is a historic restaurant in Brooklyn known for its elegant atmosphere and classic American cuisine. Lo...
Lonnies
No description yet
Montague Diner
No description yet
El Cedro
No description yet
Sea & Soil
No description yet
Henry’s End
No description yet
Mile End Delicatessen
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2024
-
Alteration Type II
SLAB REPLACEMENT IN INTERIOR GARAGE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
-
CLASS - 2
VIOLATION OF DISCRETIONARY ZONING CONDITIONS ON PRIVATELY OWNED PUBLICSPACE.REFER TO POPS REPORT#V020003 AND DRAWINGS...
-
CLASS - 1
28-323.8 AND RCNY 103-13(5). FAILURE TO SECURE PUBLIC SAFETY AND MAKE THE BUILDING STRUCTURE AND APPURTENANCES CONFOR...
2023
2022
-
CLASS - 2
VIOLATION OF DISCRETIONARY ZONING CONDITIONS ON PRIVATELY OWNED PUBLICSPACE.REFER TO POPS REPORT#V020003 AND DRAWINGS...
2021
-
Alteration Type II
PROPOSED PARTITIONS AT THE 21ST FLOOR, TENANT MAKERBOT, NEW GYPSUM BOARD PARTITION, NEW GLASS PARTITION WITH SLIDING ...
-
DOB violation Jun 9, 2021
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Jun 9, 2021
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Jun 9, 2021
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Jun 8, 2021
E-ELEVATOR ELEVATORREQUIRED
-
Alteration Type II
REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS ON 3RD FLOOR (SCHNEPS MEDIAL) AS PER PLANS FILED HEREWITH. NO CHANGE ...
-
Alteration Type II
MODIFICATION OF SPRINKLER ON 10TH FLOOR ASSOCIATED WTIH CORE BATHROOMS. ALL WORK IS INTERIOR AS PER PLANS FILED HEREW...
-
Alteration Type II
INTERIOR DEMO AND INSTALLATION OF PARTITIONS ON PARTIAL 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGR...
-
Alteration Type II
INTERIOR REMOVAL AND INSTALLATION OF PARTITIONS AND DIFFUSERS ON 11TH FLOOR (CORE BATHROOMS) AS PER PLANS FILED HEREW...
2020
2018
-
CLASS - 2
FAILURE TO CONDUCT/FILE A FINAL INSP FOR COMPLETED WORK W/IN 1 YEAR OF PERMIT EXPIRATION. ALT2 JOB# 320294427 WHICH E...
-
CLASS - 2
VIOLATION OF DISCRETIONARY ZONING CONDITIONS ON PRIVELY OWNED PUBLIC SPACE NOTED AT TIME OF INSPECTION PUBLIC PLAZA I...
-
CLASS - 2
FAILURE TO CONDUCT/FILE FINAL INSPECTION FOR COMPLETED WODRK WITHIN A YEAR OF PERMIT EXPIRATION. ALTII JOB# 321699783...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records