83-85 3 Avenue, Brooklyn
Brooklyn • Block 00198 • Lot 0006 • Zip: 11217
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 6 days ago- Downtown Brooklyn 9 min 4 walking, 5 riding
- Fulton Street 14 min 4 walking, 10 riding
- Penn Station 26 min 4 walking, 22 riding
- Times Square 27 min 4 walking, 23 riding
- Union Square 27 min 4 walking, 23 riding
- Grand Central 31 min 4 walking, 27 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Strange Delight
Strange Delight is a quirky and eclectic shop in Brooklyn offering a unique blend of vintage finds, handmade goods, a...
Insa
Korean BBQ, noodles & other staples served in a casual, warm environment with private karaoke rooms.
Sofreh
Sofreh is a cozy and inviting spot in Brooklyn serving up delicious and authentic Persian cuisine. With a warm and we...
Black Forest Brooklyn
No description yet
Lonnies
No description yet
Mile End Delicatessen
No description yet
Claro
Claro is a charming Mexican restaurant in Brooklyn offering authentic flavors and farm-to-table ingredients. Enjoy ha...
Sea & Soil
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2024
-
Alteration Type II
APPLICATION HEREWITH FILED FOR THE INTERIOR RENOVATIONS AND FOR NEW PARTITIONS IN CELLAR. NO CHANGE TO STRUCTURE. NO ...
2023
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
2022
2021
2020
-
Alteration Type I
APPLICATION FILED TO CHANGE USE AT GROUND FLOOR AND CELLAR FROM STORAGE TO RETAIL AND OFFICE USES AS PER PLAN NEW EGR...
-
Alteration Type II
GENERAL CONSTRUCTION APPLICATION HEREWITH FILED FOR THE INTERIOR RENOVATION AND FIT OUT OF EXISTING MANUFACTURING USE...
-
Alteration Type II
APPLICATION HEREWITH FILED FOR THE REMOVAL OF INTERIOR PARTITIONS AND CLEANUP AS PER PLANS. NO CHANGE TO OCCUPANCY, U...
-
Alteration Type II
APPLICATION HEREWITH FILED FOR THE INTERIOR RENOVATION AND FIT OUT OF EXISTING MANUFACTURING USE BUILDINGS.INSTALLATI...
-
Alteration Type II
APPLICATION HEREWITH FILED FOR THE INTERIOR RENOVATION AND FIT OUT OF EXISTING MANUFACTURING USE BUILDINGS.INSTALLATI...
2018
-
DOB violation Jun 11, 2018
E-ELEVATOR ELEVATORREQUIRED
2017
-
DOB violation Apr 27, 2017
C-CONSTRUCTION OTHER OPTIONAL
-
DOB violation Jan 3, 2017
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
2016
-
DOB violation May 24, 2016
E-ELEVATOR ELEVATORREQUIRED
2013
2005
1995
-
Non-Hazardous
15R,37H,37D. 15 REMOVE ALL DEAD BOLT LOCK ASSEMLIES.37 PROPERLY SECUREALL RELAY MECHAANISMS.(PROVIDE PINS AND CLIPS) ...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records