148 Willow Street, Brooklyn
Brooklyn • Block 00234 • Lot 0069 • Zip: 11201
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 10 min 4 walking, 6 riding
- Fulton Street 13 min 4 walking, 9 riding
- Penn Station 22 min 4 walking, 18 riding
- Times Square 23 min 4 walking, 19 riding
- Union Square 27 min 4 walking, 23 riding
- Grand Central 30 min 4 walking, 26 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Titán
No description yet
al Badawi
Middle Eastern specialties are offered in this down-to-earth restaurant with a terrace.
The Long Island Bar
The Long Island Bar in Brooklyn offers a cozy and retro atmosphere, with a classic cocktail menu and delicious comfor...
Ingas Bar
Ingas Bar is a cozy neighborhood spot in Brooklyn offering delicious food and craft cocktails. With a laid-back atmos...
Montague Diner
No description yet
Diljān
No description yet
Juliana's Pizza
No description yet
El Cedro
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2023
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Apr 25, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2022
-
Alteration Type II
THE PURPOSE OF THIS JOB IS TO REFURBISH EXISTING APT 3F AT 2ND FLOOR, CAP AND REMOVE GAS METER AND STOVE. NO CHANGE T...
-
Alteration Type II
THE PURPOSE OF THIS PROJECT IS TO CONDUCT PARTIAL DEMOLITION TO NON BEARING WA LLS AND REFURBISH/MODIFY LAYOUT OF EXI...
2021
-
Alteration Type II
THE PURPOSE OF THIS PROJECT IS TO REFURBISH EXISTING BASEMENT APARTMENT (1F) AND 1ST APARTMENT (2F) NO CHANGE TO EGRE...
2020
-
CLASS - 2
FAILURE OF PERMIT HOLDER TO PROVIDE INSPECTION ACCESS TO ONGOING CONSTRUCTION ON AN ACTIVE/PERMITTED WORK SITE.AT TIM...
-
DOB violation Mar 3, 2020
LANDMK-LANDMARK NONE
2018
-
DOB violation Apr 6, 2018
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2012
1993
-
Non-Hazardous
WORK WITHOUT A PERMIT. WORK NOTED HAVING INSTALLED A SKYLIGHT IN ROOF ALSO REMOVING INCINERATOR SHUTE FROM ROOF TO CE...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records