Job filings
117-131 Clinton Street, Brooklyn • Block 00265 • Lot 0017
23 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Dec 12, 2017 | 321511137 | Alteration Type I | SIGNED OFF | FILING NEW PARTITION WORK ON 1ST FLOOR AND CHANGE FLOOR DESIGNATION FOR LOUNGE ON 2ND FLOOR TO DINING MEZZANINE TO BE... | $10,000 | PACKER COLLEGIATE INSTITUTE |
| Dec 8, 2017 | 321531455 | Place of Assembly | COMPLETED | — | $0 | PACKER COLLEGIATE INSTUT |
| Sep 20, 2016 | 301512012 | Place of Assembly | COMPLETED | — | $0 | PACKER COLLEGIATE INSTITUTE |
| Sep 14, 2016 | 320627675 | Alteration Type I | SIGNED OFF | MODIFICATION OF EXISTING MECHANICAL SYSTEM, NEW DUCT WORK FOR 4TH FLOOR AND MEZ ADDITION | $0 | PACKER COLLEGIATE INSTITUTE |
| Sep 13, 2016 | 321205101 | Alteration Type III | SIGNED OFF | FILING FOR AMENDMENT TO FIRE PROTECTION PLAN | $5,000 | PACKER COLLEGIATE INSTITUTE |
| Jul 14, 2016 | 320978929 | Alteration Type II | SIGNED OFF | ADDITION/MODIFICTION TO EXISTING FIRE ALARM SYSTEM | $30,000 | PACKER COLLEGIATE INSTITUTE |
| Dec 8, 2015 | 321058181 | Alteration Type II | SIGNED OFF | FILING FOR MODIFICATION OF EXISTING KITCHEN RANGEHOOD FIRE SUPPRESSION SYSTEM, AS SHOWN ON PLAN. EXISTING FIRE SUPPRE... | $2,000 | PACKER COLLEGIATE INSTITUTE |
| Oct 28, 2015 | 321148959 | Alteration Type II | SIGNED OFF | MODIFICATION TO EXISTING SPRINKLER/STANDPIPE SYSTEM. NEW SPRINKLER/STANDPIPE LAYLOUT FOR THE 4TH FLOOR, EXISTING 4TH ... | $35,000 | PACKER COLLEGIATE INSITITUTE |
| Oct 20, 2015 | 340285300 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | ARSENAL SCAFFOLD, INC |
| Oct 20, 2015 | 340288842 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | ARSENAL SCAFFOLD, INC |
| May 14, 2015 | 320978910 | Alteration Type II | PLAN EXAM - DISAPPROVED | — | $28,000 | PACKER COLLEGIATE INSTITUTE |
| Aug 7, 2013 | 320200661 | Alteration Type II | SIGNED OFF | REPLACE FUEL OIL STORAGE TANK PER PLANS AND CONNECT TO EXISTING FILL AND VENT TERMINALS. | $25,000 | THE PACKER COLLEGIATE INSTITUTE |
| Feb 9, 2006 | 302074591 | Alteration Type II | PLAN EXAM - APPROVED | Installation of 19.5 linear feet (19 feet & 6 inches) curb cut including splays located 140 feet and one quarter ... | $10,000 | Packer Collegiate Institute |
| Aug 15, 2005 | 301293384 | Alteration Type I | SIGNED OFF | INTEIOR RENOVATION AND CHANGE OF USE OF EXISTING CHURCH AND PARISH HOUSE TO SCHOOL AS PER PLANS FILED HEREWITH. IN-FI... | $2,000,000 | PACKER COLLEGIATE INSTITUTE |
| Aug 15, 2005 | 301293428 | Alteration Type III | SIGNED OFF | FIRE PROTECTION PLAN FILED IN CONJUNCTIO N WITH ALTERATION TYPE I. 3012 3384 | $10,000 | PACKER COLLEGIATE INSTITUTE |
| Aug 1, 2005 | 301293446 | Alteration Type II | SIGNED OFF | FIRE ALARM WORK AS PER PLANS FILED HEREW ITH ALL WORK FILED IN CONJUCTIO WITH ALTERATION TYPE 1 301293384 | $10,000 | PACKER COLLEGIATE INSTIUTE |
| Jun 9, 2005 | 301189032 | Alteration Type II | SIGNED OFF | Structural work in conjunction with initial application as shown on Plans filed herewith. | $569,000 | Packer Collegiate Institute |
| May 9, 2005 | 301293455 | Alteration Type II | SIGNED OFF | STANDPIPE WORK AS PER PLANS FILED HEREWI TH ALL WORK FILED IN CONJUCTIO WITH ALTERATION TYPE 1 301293384,WATER P IPIN... | $10,000 | PACKER COLLEGIATE INSTITUTE |
| May 9, 2005 | 301293437 | Alteration Type II | SIGNED OFF | SPRINKLER WORK AS PER PLANS FILED HEREWI TH. ALL WORK FILED IN CONJUNCTION WITH ALTER ATION TYPE I: 301293384 | $50,000 | PACKER COLLEGIATE INSTITUTE |
| Apr 12, 2005 | 301530975 | Alteration Type II | SIGNED OFF | INSTALL FIRE SUPPRESSION SYSTEM,AS SHOWN ON PLAN.PLUMBING WORKTYPE FOR G S SHUTOFF VALVE FILED UNDER JOB#30118903 2.N... | $3,000 | PACKER COLLEGIATE INSTITUTE |
| Sep 18, 2003 | 301293419 | Place of Assembly | PERMIT ISSUED - ENTIRE JOB/WORK | — | $0 | PACKER COLLEGIATE INSTITUTE |
| Feb 20, 2002 | 301293400 | Alteration Type II | PLAN EXAM - DISAPPROVED | INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. REMOVE AND PRESERVE E XISTING WINDOWS. ALL WORK FILED IN CONJ UNCTIO... | $100,000 | PACKER COLLEGIATE INSTITUTE |
| Feb 20, 2002 | 301293393 | Alteration Type II | PLAN EXAM - DISAPPROVED | STRUCTURAL WORK AS PER PLANS HEREWITH AL L WORK FILED IN CONJUCTION WITH ALTERATION TYPE 1 30129384 | $300,000 | PACKER COLLEGIATE_INSTITUTE |