Job filings
579 Warren Street, Brooklyn • Block 00395 • Lot 0048
9 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Feb 14, 2020 | 321474953 | Alteration Type II | SIGNED OFF | FILING INSTALLATION OF PLUMBING FIXTURES, SPRINKLER HEADS AND RELATED PIPING. ALSO FILING FOR MECHANICAL EXHAUSTS AND... | $315,700 | SOUTH BROOKLYN MUTUAL HDFC |
| Feb 3, 2020 | 321474962 | Alteration Type II | SIGNED OFF | FILING STRUCTURAL WORK PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION | $150,000 | FAC HDFC |
| Nov 25, 2019 | 321536487 | Alteration Type II | SIGNED OFF | INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM SYS TEM. NO CHANGE TO USE EGRESS OR OCCUPA... | $60,000 | SOUTH BROOKLYN MUTUAL HDFC |
| Apr 26, 2019 | 340516864 | Alteration Type III | SIGNED OFF | INSTALLATION OF PLYWOOD FENCE AS PER PLANS IN CONJUNCTION WITH THE BUILDING. FENCE SHALL COMPLY WITH CHAPTER #33 OF T... | $0 | FAC RENAISSANCE LP C/O FIFTH AVE |
| Dec 26, 2018 | 340520083 | Alteration Type III | SIGNED OFF | INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. ALL WORK SHALL BE ACCORDING TO CHAPTER #33 OF THE 2014 NYC BUILDING CODE.... | $0 | FAC RENAISSANCE LP C/O FIFTH AVE |
| Dec 26, 2018 | 340466533 | Alteration Type III | SIGNED OFF | INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33... | $0 | ROCK GROUP NY CORP |
| Oct 31, 2018 | 321237675 | Alteration Type II | SIGNED OFF | RECONFIGURATION OF PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANC... | $500,000 | SOUTH BROOKLYN MUTUAL |
| Aug 11, 2006 | 302200213 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | REPLACE BOILER AND BURNER. INSTALL A HB SMITH #19A-S-05 WITH A CARLIN #301 CRD. NO CHANGE IN EGRESS USE OR OCCUPANCY ... | $0 | N/A |
| Jul 6, 2001 | 301145482 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | CORRECTIVE STRUCTURAL WORK TO INCLUDE NE W STEEL BEAMS AND COLUMNS AT CELLAR AND LEVELLING OF FLOORS 1-4. NO C HANGE ... | $45,000 | SOUTH BROOKLYN MUTUAL HDFC |