1-63 Butler Street, Brooklyn
Brooklyn • Block 00402 • Lot 0001 • Zip: 11231
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Downtown Brooklyn 13 min 5 walking, 8 riding
- Fulton Street 21 min 5 walking, 16 riding
- Union Square 30 min 5 walking, 25 riding
- Penn Station 33 min 5 walking, 28 riding
- Times Square 34 min 5 walking, 29 riding
- Grand Central 36 min 5 walking, 31 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
al Badawi
Middle Eastern specialties are offered in this down-to-earth restaurant with a terrace.
Bar Ferdinando
No description yet
Cafe Spaghetti
No description yet
The Long Island Bar
The Long Island Bar in Brooklyn offers a cozy and retro atmosphere, with a classic cocktail menu and delicious comfor...
Lucali
Upscale brick-oven pizzas, calzones & wine served up in a rustic, stylish eatery.
Lonnies
No description yet
Swoony’s
No description yet
El Cedro
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, THE FOLLOWING DOORS WERE NOT SELF-C...
-
CLASS - 2
RE-ISSUE 35693212Y. AT THE TIME OF INSPECTION, THE FOLLOWING EMERGENCYLIGHTS WERE INOPERABLE:-EMERGENCY LIGHT AT EXIT...
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, THE FOLLOWING CLASSROOM DOORS 2ND M...
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371...
2025
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS P...
-
Alteration Type II
INSTALLATION OF NEW DOORS IN EXISTING DOOR FRAMES, FLOORING AND VINYL BASE, WINDOW SHADES AND HARDWARE. INSTALLATION ...
2024
2023
2022
-
CLASS - 2
RE-ISSUE #35561118N(5/4/21)EXIT DOOR NOT SELF CLOSING EXIT 2 AT 1ST FLOOR EXIT 3 AT 2ND FLOOR EXIT 5 & 6 AT 3RD FLOOR...
2020
-
Alteration Type III
PS 293K, FILING FENCE APPLICATION IN CONJUCTION WITH PLAYGROUND RENOVATION
-
Alteration Type II
MH: NEW CEILING MOUNTED EXHAUST DUCTS TO BE CONNECTED TO ROOF MOUNTED EXHAUST FANS. PROVIDE ROOFTP AC UNITS AND ASSOC...
2019
-
Alteration Type II
OT: REMOVE EXISTING CLOSETS AND MILLWORK. PROVIDE NEW PARTITIONS, DOORS, VCT FLOORING, PATCH AND PAINT ALL OTHER EXIS...
-
Alteration Type II
293K- J.H.S SCHOOL FOR INTERNATIONAL STUDIES- LIBRARY UPGRADE. REMOVE AND REPLACE ENTRANCE DOORS & FRAME, NEW 2 H...
-
Alteration Type III
FN/JS293K - FOR TEMPORARY CONSTRUCTION EQUIPMENT (FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB ...
2013
-
DOB violation Apr 24, 2013
E-ELEVATOR ELEVATORREQUIRED
2009
2008
-
DOB violation Jan 30, 2008
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Jan 3, 2008
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Jan 3, 2008
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Jan 3, 2008
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records