Skip to content

DOB violations

177-183 Huntington Street, Brooklyn • Block 00474 • Lot 0001

11 records

Violations issued by the Department of Buildings.

Issued Violation Type Category Description Disposed
Nov 14, 2025 15002 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 13719 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Oct 4, 2023 17902 IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL V*-DOB VIOLATION - DISMISSED INSTALL APPROXIMATELY 40 LINEAR FEET OF SIDE WALK SHED AT EXPOSURE 1 WITH MANDATORY 5 FEET EXTENSION TO COVER ENTRANC... Nov 17, 2023
Oct 4, 2023 23-02793 C-CONSTRUCTION OTHER OPTIONAL V-DOB VIOLATION - ACTIVE FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPOSURE 1,BETWEEN 1ST AND...
Jun 30, 2023 40072 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 19650 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 21437 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 41186 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 18754 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Mar 3, 2015 09005 LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED V-DOB VIOLATION - ACTIVE VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Aug 25, 1999 06HS01 C-CONSTRUCTION OTHER OPTIONAL VW*-VIOLATION - WORK W/O PERMIT DISMISSED WORK WITHOUT A PERMIT. WORK NOTED RENOVATION OFENTIRE PREMISES. GAP BD FINISHES THROUGHOUT ENLARGING OF EXISTING WIND... Aug 13, 2026