DOB violations
Henry Street, Brooklyn • Block 00538 • Lot 0001
272 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jan 3, 2017 | 00159 | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST | May 11, 2017 |
| Oct 1, 2015 | 10580 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Aug 1, 2016 |
| Oct 1, 2015 | 10579 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Aug 1, 2016 |
| Oct 1, 2015 | 10578 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Aug 1, 2016 |
| Oct 1, 2015 | 10487 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Jul 13, 2016 |
| Oct 1, 2015 | 10486 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Jul 13, 2016 |
| Oct 1, 2015 | 10485 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Jul 13, 2016 |
| Mar 3, 2015 | 11212 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Aug 1, 2016 |
| Mar 3, 2015 | 11213 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Aug 1, 2016 |
| Mar 3, 2015 | 10528 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Jul 13, 2016 |
| Mar 3, 2015 | 10529 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Jul 13, 2016 |
| Mar 3, 2015 | 10530 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Jul 13, 2016 |
| Mar 3, 2015 | 11211 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Aug 1, 2016 |
| Jul 28, 2014 | HAZ74695 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Jul 29, 2014 |
| Jul 23, 2014 | HAZ75318 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Jul 29, 2014 |
| May 15, 2014 | 21611 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Jul 13, 2016 |
| May 15, 2014 | 21623 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Aug 1, 2016 |
| May 15, 2014 | 21622 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Aug 1, 2016 |
| May 15, 2014 | 21621 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Aug 1, 2016 |
| May 15, 2014 | 21612 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Jul 13, 2016 |
| May 15, 2014 | 21610 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Jul 13, 2016 |
| Sep 20, 2013 | HAZ75163 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Dec 10, 2015 |
| Sep 20, 2013 | HAZ75269 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Oct 26, 2016 |
| Sep 20, 2013 | HAZ75241 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Jul 28, 2015 |
| Sep 20, 2013 | HAZ75189 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Dec 24, 2014 |
| Sep 17, 2013 | HAZ74729 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Dec 24, 2014 |
| Sep 16, 2013 | HAZ74695 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V-DOB VIOLATION - ACTIVE | CYCLE 7 UNSAFE REPORT FILED | — |
| Sep 16, 2013 | HAZ74479 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Mar 20, 2015 |
| Sep 16, 2013 | HAZ74734 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Dec 17, 2015 |
| Sep 16, 2013 | HAZ74701 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Mar 19, 2015 |
| Sep 16, 2013 | HAZ74700 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Feb 4, 2016 |
| Sep 16, 2013 | HAZ74699 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Dec 10, 2015 |
| Sep 16, 2013 | HAZ74698 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Jul 28, 2014 |
| Sep 16, 2013 | HAZ74697 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Aug 6, 2014 |
| Sep 16, 2013 | HAZ74696 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Jun 21, 2016 |
| Sep 16, 2013 | HAZ74733 | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | CYCLE 7 UNSAFE REPORT FILED | Sep 15, 2015 |
| Aug 30, 2013 | 01643 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01617 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01613 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01612 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01611 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01646 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01645 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01644 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01642 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01641 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01639 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Aug 6, 2014 |
| Aug 30, 2013 | 01638 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01637 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2014 |
| Aug 30, 2013 | 01636 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 | Oct 27, 2015 |